Loading…
Loading…
37,574 results • Latest
Construction of P.C.C Road and Guard Wall in Vill-Mansingha NH 80 to Badhed Lake Path from Samaul Shek to Badhed Lake under Rajmahal block, Dist- Sahibganj
(A) Diversion of Over Head Line of Feeder No. 11, 6.6 KV, near Akashkinaree Basti of dept. OCP (B) Fabrication of the 12m Pole using 6 inch Dia. Pipe and 4 inch Dia. Pipe for F-17, 6.6 KV for pumping purpose of NAKC under Govindpur Area.
Unbranded DOXYCYCLINE IP 100 mg Capsule
mec Hydrants (Landing Valve) as per IS 5290 Type A
Repairing of 300mm dia CI pipeline laid from Dharmabandh 2-Pit to Bilbera water treatment plant for Domestic water supply to various BCCL Colonies under Govindpur Area-III
Unbranded PANTOPRAZOLE
CONSTRUCTION OF BOUNDRYWALL, 1. UPG.P.S.BHUIYAN TOLI, PARADIH, At-Vill-BHUIYAN TOLI, PARADIH, GP-PARADIH, Block-CHATRA. 2. UPG.P.S.GANJHU TOLA, BABHNE, At-Vill-GANJHU TOLA, BABHNE, GP-PARADIH, Block-CHATRA.
Dismantling, erection of pump-Motor and Base Plate at Govindpur IV seam underground and changing of old and damaged 6 inch pipe 50 meter, 4 inch pipe 90 meter at Surface under ABG Colliery.
Cleaning of Kuya OCP and Kuya Dump No- 6 Road Weighbridge of Bastacolla Area and Quaterly Testing of 02 No Wirghbridge i.e. Kuya OCP and Kuya Dump No- 6.
HINDUSTAN ANTIBIOTICS LTD Meropenem 1 gm 1 gm Dry, HINDUSTAN ANTIBIOTICS LTD Meropenem 1 gm 1 gm Dry Powder Injection
Diversion of 6 inch and 8 inch line and dismantling of pump-motor and base plate at Block-IV OCP.
CONSTRUCTION OF BOUNDRYWALL, 1. UPG.M.S.HASOT, At-Vill-HASOT, GP-MOKTAMA, Block-CHATRA. 2. UPG.P.S.KARIMA, At-Vill-KADHIMA, GP-MOKTAMA, Block-CHATRA.
Removal and clearing of loose and jammed coal lumps, fines etc spilled F/B and belt conveyor accumulated in and around conveyor structure of F/B at Kessurgarh under ABOCP Mine of Block - II Area.
IMPELLER ASSY, DWN: SPM 021.180. 00.108A
Urgent repairing of explosive magzine and surroundings and white washing painting along with miscellaneous works under Urimari Project, Barka-Sayal Area.
Unbranded Frusemide 10 mg/ml Liquid Injection
Diesel Power Generator (V2) (Q2)
Plug Valve with Pneumatic Actuator
Big End Bearing Half, Main Bearing Upper Half, Main Bearing Lower Half
Custom Bid for Services - Biennial Comprehensive Maintenance Contract Similar Category Operation And Maintenance Of Other Machines And Plants
Fins plate for CPP Boilers
Unbranded Piperacillin 4 gm + Tazobactum 0.5 gm Dry Powder, Unbranded Piperacillin 4 gm + Tazobactum 0.5 gm Dry Powder Injection
Event or Seminar or Workshop or Exhibition or Expo Management Service
Dismantling, transporting, fitting of Rana Tugger 50HP from 29L 6 dip east to 7L 10Dip East and foundation construction for fitting of tugger at Jogidih Colliery under Govindpur area.
SUPER CLEAN Traditional Straw (Coconut) Broom of length 90
INSTALLATION AT VARIOUS PLACES UNDER DBOCP COLLIERY.
Dismantling, welding, fitting of track frame, radiataor transporting, cleaning, fitting of SDL 1076 at 1 seam Jogidih Colliery under Govindpur Area.
SAFETY UP GRADATION OF ELECTRICAL INFRASTRUCTURE UNDER DBOCP COLLIERY.
Mandatory Spares for Gun Metal Ball Valve
Custom Bid for Services - as per scope of work Similar Category Handling and Transport on Lumpsum Basis
Commissioning of 07 nos. New chemical earthing NLOCP after excavating the older one at ECO park under NLOCP C/V Area
Mandatory Spares for Chemical Dosing System
PROCUREMENT OF BOLT TENSIONER SPARE
Portable OT Light (V2) (Q2)
XLPE Cablefor Working Voltageuptoand Including1.1 KV Marked To IS7098 (Part1) (Q2)
SINGLE MODE DUPLEX SC-LCPATCH CORD, 10 KVA online UPS
Unbranded Walking Stick (Adjustable Height) , Total Height 700, Unbranded Walking Stick (Adjustable Height) , Total Height 700 mm
Unbranded Walker with Crutches , Medium
Konica Minolta Electrophotography/Xerography (Laser/LED) Colour A3,, Konica Minolta Electrophotography/Xerography (Laser/LED) Colour A3, Legal and A4 size Multifunction Machine Printer
CP PLUS 4MP (2560x1440) or better Bullet Camera
Installation and commissioning of 5 nos. New Hand Pump with submersible pump motor and accessory at different places of Lohandia rehab site.
Construction of RCC garland drain from existing drain near Kaddu tola rehab site (Basdiha part) toward main entrance gate at Dumaria rehab site under Rajmahal Area.
Construction of protection wall at Kaddutola (West side) rehab site (Basdiha part) under Rajmahal Area.(Phase-I)
Overhauling kit for Control Portion BP ( [Overhauling kit for Control Portion BP (787321-1994) Of Electric CCB system. One set consisting of 60 items. item details as per KBI Annexure Attached.]
Laminated cab door Glass. Specification/ [Laminated cab door Glass. Specification/ Drg. No. TRS/GMO/ M-1/G-9/004/ER.]
Module circuit HVRECP to EMD Part No. 40057403]
29100148 - Set of retaining rings etc