Loading…
Loading…
82,836 results • Latest
LAPCARE In Plane Switching (IPS) Computer Monitor with a Power Cable and/or Adapter
Construction / Upgradation of Rural Roads under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction.
Providing Labour for Rig BECN-23 and Cop 4/9
CONSTRUCTION OF ROAD CROSS AT VARIOUS LOCATION AT WARD 70 ZONE 11
Flex printing work under Swachh Bharat Mission 2024-25
Repair work on 6 mobile toilets under the sanitation wing of the Datia municipal body
Construction / Upgradation of Rural Roads under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction.
wn 18 const of BT road at kiyawat medical temo stand kalakhet road no 03 radha sweet
Unbranded 480 pages Minute register of Colour Green/Light Green
Unbranded Nutrient Supplement For Soil Fertility And Soil Health (Sericulture Use Only) 25 kg
Construction / Upgradation of Rural Roads under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction.
S I T M of Lead Acid SMF VRLA Battery Banks on buy back
Shop No. F-16, situated on the first floor near the Old Secretariat in Ward No. 13.
TIGER KILLER--SAHIL AGRO CHEMICALS Glyphosate 41% SL (Soluble Liquid) (IPA Salt) 1 L
insucon 2P x 1.5 Sq.mm 1.1 mm for 2P x 1.5 Sq.mm, insucon 2P x 1.5 Sq.mm 1.1 mm for 2P x 1.5 Sq.mm
Construction, renovation and allied works at Govt. Degree College Timarni, Harda M.P. (3rd Call) NIT-86
Construction / Upgradation of Rural Roads under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction.
Construction of ward 26 uttampura main road se conn galiyo me vais cc road nali nirman
Construction Work of C.C. Road at ward no 17 Dhalakpura firoz bhai house to kalla house vidisha.
Biennial Maintenance Contract for CITYLIFT make Elevators installed at Stage V
Construction / Upgradation of Rural Roads under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction.
wn 39 const of rcc nala from sai kripa open area omkarshwar mahadev to home guard at gandhi nagar
GITTI
BRICK WORK , FLOORING AND OTHER WORK AT AT COMMUNITY HALL AT ANKUR COMPLEX PHASE 4 AND SAHEED HEMU WARD 45 ZONE 10( PARSHAD NIDHI 45 )
Various AR/SR/Anurakshan and Deposit work of Govt. G and H Type Resi. Qtrs. in Section No. 13 under M-2 Sub Division, PWD Bhopal
Construction of Nallah Work at Ginnori Mandir Ginnori Road in Ward No.22, Zone No.05
Construction / Upgradation of Rural Roads under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction.
brother OEM Ink Bottle Manufactured by Brother International (India) Private Limited
Various AR/SR/Anurakshan and Deposit work of E, F, NG Type at Radio Colony and Other Govt. Resi. Qtrs. under M-2 Sub Division, PWD Bhopal
Shop No. F-15, situated on the first floor near the Old Secretariat in Ward No. 13.
Various AR/SR/Anurakshan and Deposit work of Govt. Resi. Qtrs. in Section No. 24 under M-2 Sub Division, PWD Bhopal
Laying of Mooram and Crushed Stone for Solution of Mud Problem on Necessary Places in Rainy Season in Ward No. 40 under Zone No. 10 Second Call
Construction / Upgradation of Rural Roads under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction.
wn 36 const of rcc drain from s.m jain house to bala ji temple
Construction of RCC Drain on Jhagariya Road, Behind Mata Mandir, Dev Nagar Colony, Ward No. 02.
brother OEM Ink Bottle Manufactured by Brother International (India) Private Limited
Construction Work of C.C. Road at ward no 17 vijay maheshwari to shanker bhan and rajesh agrwal to shubhas maheshwari house
Unbranded 8 ml Correction Fluid Pen of 0.7 mm Tip Size
ward 28 me wbm sadak prachlit cement concrete sadak kshatigrast pul puliya kshatigrast nali(eet dwara nirmit nali,patthar ki nali,rcc nali,ardh golakar nali,shesh nali precast cover etc) bhavno ke marramat karya
Construction / Upgradation of Rural Roads under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction.
Unbranded Styling Chair with Adjustable (Through Heavy-duty hydraulic pump) chair height
Construction / Upgradation of Rural Roads under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction.
wn 33 const of cc road at sardar ji ki bagichi and pathwari gali
Various AR/SR/Anurakshan and Deposit work of Govt. Resi. Qtrs. at 23 batalian under M-2 Sub Division, PWD Bhopal
SLIP RING ASSY-1, SLIP RING ASSY-2
brother OEM Ink Bottle Manufactured by Brother International (India) Private Limited
Various AR/SR/Anurakshan and Deposit work of Govt. E Type other Resi. Qtrs. at North T.T. Nagar 45 Bunglow under M-2 Sub Division, PWD Bhopal
Construction / Upgradation of Rural Roads under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction.
wn 40 const of cc road and surface dia in for open area behind pg collage boundary near parshad malvi house
Construction Work of C.C. Road at ward no 33 kamlesh balmiki house to dheeraj lodhi house vidisha