Loading…
Loading…
4,348 results • Latest
Zonal contract for execution of P-Way works in between section From Km. 107/00 to 165/00 for the year 2026-27 of SSE/P-Way/PFU under the jurisdiction of ADEN/KRPU for the period ending 30.09.2027 on KK-I Line of Rayagada Division.
Zonal contract for execution of P-Way works in between section From Km. 60/14 to 107/00 for the year 2026-27 of SSE/P-Way/ARK under the jurisdiction of ADEN/ARK for the period ending 30.09.2027 on KK-I Line of Rayagada Division.
Godown painting, repair of floor, verandah, shutter, ventilator, office grading, electrification, plastering, compound wall paining, heightening work, costn of labour shed and costn of toilet complex SWC A-katapali(PEG-godown)
Supply of Fresh Ration items for THQ and All COBs Madanwada Domikalan Nawagaon Sambalpur Amakodo under 27 BN
Zonal contract for execution of P-Way works in between section From Km. 03/0 to 60/14 for the year 2026-27 of SSE/P-Way/SUP under the jurisdiction of ADEN/ARK for the period ending 30.09.2027 on KK-I Line of Rayagada Division.
Constn of fire hydrant sump, security room, barbed wire fencing and electrification work, repair of w.b. room, compound wall painting, repair of floor, verandah, shutter, ventilator, office grading, plastering, godown painting work at SWC A-Katapali
Compound wall color, main gate repair, verandah repair, w.b.room repair,gate Repair, office grading, constn.of fire hydrant sump, security room and barbed wire fencing, QC room, godown color, plaster, electrification work, at SWC Kendupali