Loading…
Loading…
3,647 results • Latest
Construction of new Major H.L. bridge utei at km. 87.900 on NH 59 in the state of Odisha on EPC mode
Construction of Proposed HL Bridge over Local Nallah at Ch 96.400 Km over Gadgadi River at Ch. 105.550 Km and Widening and Strengthening from Ch 91.720 to 91.920 Km on NH-153 (B) in the State of Odisha on EPC Mode
Construction of H.L. Major Bridge across River Songarh at Km. 97.958 and Minor Bridge at Singkhaman Km. 87.790 on Balangir-Bhawanipatana Road (NH-26) in the State of Odisha on EPC mode
Doors windows painting A B C and D- Type Qtrs. and allied civil works in township at HAL Korwa for two years.
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from KM 41.50 to Km 69.60 (including Nunkhari Station) involving Earthwork in formation, Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road Under Bridge (RUBs), Viaducts, Tunnels, Protection works, BLT works, P.Way Track works with Contractor's own materials (except New/SH Rails), construction of Platforms, Station Buildings, Service Buildings, SP/SSP buildings and Residential Buildings, Water Supply, indoor and outdoor Electrification, Provision of 1X25 kV Conventional Type OHE, Tunnel OHE with ROCS, Tunnel lighting, TSS, SP, General Power Supply Arrangements Modifications/Conversion to Underground for Overhead electrical HT/LT Power line Crossings etc on EPC Basis in Waltair Division of East Coast Railway.
Vegetable, Fruits, Milk and Milk products, etc.
Mutton, Chicken, Fish, Eggs and other Non-veg. items, etc.
Groceries, Tins and Bottle products, etc.
CONSTRUCTION OF NEW MAJOR H.L. BRIDGE LANTH-I AT CH 113/960 Km AND LANTH -II AT CH 114/446 Km OF NH 26 IN THE STATE OF ODISHA IN EPC MODE