Loading…
Loading…
4,174 results • Latest
Zonal contract for execution of P-Way works in between section From Km. 03/0 to 60/14 for the year 2026-27 of SSE/P-Way/SUP under the jurisdiction of ADEN/ARK for the period ending 30.09.2027 on KK-I Line of Rayagada Division.
Constn of fire hydrant sump, security room, barbed wire fencing and electrification work, repair of w.b. room, compound wall painting, repair of floor, verandah, shutter, ventilator, office grading, plastering, godown painting work at SWC A-Katapali
Compound wall color, main gate repair, verandah repair, w.b.room repair,gate Repair, office grading, constn.of fire hydrant sump, security room and barbed wire fencing, QC room, godown color, plaster, electrification work, at SWC Kendupali
Const. of One Addl. Class Room (ACR) and Boundary Wall at Laxmiposi U.P. School, G.P- Badadumuria
Repair and Maintenance of Basantpur-2 Anganwadi center G.P- Basantpur