Loading…
Loading…
51,670 results • Latest
KAOLINE POWDER
Foundation and Slab for installation of the Distribution Transformer and Distribution Panel in colony Substation at Basundhara Area
PVC CONNECTOR
Repairing and Fixing of Water Supply Arrangement through 50mm Ball Valve, Strainer and pipes to fog cannons and Coal Stock firefighting system from nearest pipeline at different Locations for dust Suppression n Quenching of Coal Fire at Kulda OCP, BA
PROVIDING M.S GRILL UNDER OVER BRIDGE FROM FROM FISH MARKET TOWARDS PETROL PUMP CHOWK, UNDER RAYAGADA MUNICIPALITY
CONSTRUCTION OF BOTH SIDE RCC DRAIN AND COVER PLATE AT JYOTI FOUNDARY TO OMP ROAD NEAR DEVENDRA BEHERA RESIDENT IN W NO-17, UNDER RAYAGADA MUNICIPALITY
Construction of Two Class Room Of Lokanath Mohavidyalya
Supply of FULL GLOSS POLYURETHANE PAINT.
Set of Gasket for LP & HP Cylinder Head of ELGI make Air Compressor,
HOSE FLEXIBLE ARMOURED, I/D-1/2 inch (12.7 mm) x O/D-59/64 inch (23.42 mm) IN LENGTH , KGP/DL/PC-90, FIG -2 ALT- 8
Cable type flexible permanent magnetic Yoke (PMY) for magnetic particle testing,
BFB steady arm eye piece (2541)
Air Outlet net of Traction Motor type FRA 6068
Construction of Additional Class Room at Kukudimundi Ashram School under Rairangpur Block.
Construction of Adivasi Sanskruti Bhawan at Bisoi under Bisoi Block.
Construction of Adivasi Sanskruti Bhawan at Kusumi under Kusumi Block.
Construction of Adivasi Sanskruti Bhawan at Jamda under Jamda Block.
GHISUAN-II
BUANAL-VI
BINJHA-IV
BALISUAN-IV
BALISUAN-III
HANDLING OF PDS COMMODITIES IN RRC-CUMDSC OF CUTTACK DISTRICT
Installation of DG set at RW Division Koraput for the year 2026-27_building
Installation of DG set at RW Division Sunabeda for the year 2026-27_building
Installation of DG set at RW Division Umerkote for the year 2026-27_building
Repair and Renovation of electrical works of main building and drug ware house of CHC, Jemadeipantha in Rayagada as per Lr. No. 42317 dt. 15.11.2025 of DHSO Buildings.
S/R of Road from Tapas Mohanta to Dash Babu house at Kuladera Colony in Ward No-11
Construction of Road from Bauri Bandhu house to Mallick Babu house at Brahmanigaon in Ward No-21
S/R to Road from Sidha Jagannath Temple to Chaubacha Shiv Temple in Ward No-01
Installation of DG set at RW Division Nabarangpur for the year 2026-27_building
Repair and Renovation of electrical works of main building and drug warehouse of CHC, Kalyansinghpur in Rayagada as per Lr. No. 42317 dt. 15.11.2025 of DHSO Buildings.
Special Repair of Road and Drain with Cover Slab from Santosh Sahoo house towards Jaya Gopal Mandir via- Badapokhari, Badasasan in Ward No-06.
UNDERCARRIAGE ASSY, OEM PART NO. - UC01200EX, APPLICABLE TO TATA HITACHI EX-1200 HYDRAULIC EXCAVATOR
IP/OP EXTENSION KIT, FIO-01, 68805368, ABB, MODULE, COMM, DDCS, 3AUA0000107392, ABB, OPERATOR DESK PROCESS PANEL, PP886, ABB, DDCS BRANCHING UNIT, TYP: NDBU-95C, ABB
Construction of Road from Badal majhi house to near Pond, Gambharia in Ward No-18
Construction of 5 nos. new residential quarter for staff of Tahasil Office, Paikamal in the district of Baragada_building
Inspection of three (3) Single Point Mooring (SPM) buoys at Paradip
Spraying of water on Coal Transportation Road from field time office to siding No. 09 (for a Period 02 Years) with adding remaining quantity from WB no 12 to Railway siding No. 10 under Balram OCP of Hingula Area
Strengthening of Astaranga-Nuagarh road from 0/00 km to 6/00 km in the District of Puri for the year 2024-25.
Construction of Sub-Registrar Office building at Gaisilet of Gaisilet Tahasil in the district of Bargarh _Ex-Officio SR office_BUILDING
Installtion of DG set at RW Division Malkanigiri-1 for the year 2026-27_building
Fully Automatic Isoperibol Bomb Calorimeter
Construction of New Higher Secondary School Building at Govt. U.G High School at Govt. U.G High School Jalpali, Bijepur Block under Samagra Shiksha and STARS in the district of Bargarh