Loading…
Loading…
3,606 results • Latest
Unbranded stainless steel Tubular Hacksaw Frame
Unbranded Sainless steel Claw hammer, Length 100, Unbranded Sainless steel Claw hammer, Length 100 millimeter
Unbranded Steel Tailor Scale, Number of scale in a pack 1
QUALITY INDUSTRIAL CORPORATION Magnetic Spirit Level
FINE Half round nose Carbon steel Cold Chisel
Unbranded Hardened and tempered steel strips Handsaw with, Unbranded Hardened and tempered steel strips Handsaw with Wooden Handle
J K Electric Circular Saw for wood cutting (NDRF) with Tungsten, J K Electric Circular Saw for wood cutting (NDRF) with Tungsten Carbide Tipped Blade
Bosch Corded Portable Drill Machine having Drilling Capacity in, Bosch Corded Portable Drill Machine having Drilling Capacity in Steel Upto 13mm
Unbranded Normal duty Type A Nickel Chrome plated Adjustable, Unbranded Normal duty Type A Nickel Chrome plated Adjustable single ended open jaw wrench
JSF Heavy cowhide split leather Welding apron, Size XXL
DOOR ASSEMBLY FOR EED TO DRG.NO.MRM/MC-1-4-011,COL-I ALT a Special Condition : ------
Custom Bid for Services - SUPPLY INSTALLATION AND MAINTENANCE OF IT INFRASTRUCTURE ON CAPEX BASIS Similar Category Software Support Services 2.0
General Medical Examination Headlight (Q2)
OTO - Acoustic Emissions (OAE) Instrument for New Born Infant and Children (V2) - RBSK (Q3)
Milk Boiler (Q3) (3 (3 ))
Waste Container (V3) (Q4) (3 (3 ))
Smart Energy Meter Testing Bench
Construction of U drain near Muzhiyankulam at Pooranankupppam village in ACP
Construction of Cultural Stage at Nallavadu (North) Village in ACP
Formation of road leading to Kuttiandavar Koil from Tsunami Quarters, Nallavadu (Phase-III)
Formation of WBM road facilities to the left out portion of roads at Elavarasan Nagar at Thavalakuppam village in ACP
Providing WBM road facilities to the Venugopal nagar at Pooranankuppam Village in ACP
Providing BT Road facilities to the Srinivasan Nagar at Thavalakuppam Village in ACP
Formation of WBM road facilities to the Pudunagar cross roads at Nallavadu village
Providing and planting of Bougainvillea Hybrid plants in central median in various places from Pillaichavady state border to entrance arch Periyakalapet in ECR, Puducherry
Entry and Mid Level Desktop Computer (Q2), Scanner (V3) (Q2) (3 (3 ))
Mobile Computer Workstation (Q2) (3 (3 ))
Medical Tuning Fork Sets (Q3)
Pure Tone Audiometer (Diagnostic) (V3) - RBSK (Q2) (3 (3 ))
ENT (Ear nose throat) Workstation (Q3) (3 (3 ))
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Multifunction Machine MFM (V2) (Q2) (3 (3 ))
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) ( ( 3 3 ))
Providing road facilities to internal streets of Kailash Nagar in Lawspet Consistency
Servers (V2) (Q2) (3 (3 ))
Improvements to existing road and drainage facilities to Sriram Nagar internal streets (1st and 2nd cross), Lawspet Constituency
Flying Insect Control Traps - Fly Catcher (Q3)
Construction of compound wall and improvement works to the Karumathi shed at Pillaichavady in Kalapet Constituency
Construction of compound wall in the back side of PASIC pump house in the Lift Irrigation campus at Vanjore village in T.R.Pattinam commune
Desilting of Pandaravadai voikal (I reach) for the year 2025-26 (chainage 0m to 4000m)
Construction of pump room and providing, laying pumping main from the Newly erected bore well at Nagathoppu village to Veeran Kovil OHT (near Anganwadi) in Neravy commune, Karaikal
Construction of underground sump (60,000 liters capacity reservoir) and reconstruction of damaged compound wall in the main road OHT at Vizhidiyur, Karaikal (IV call)
Construction of pump room and providing, laying pumping main from the newly erected bore well from RB of Arasalar river near Annan Kovil to Vizhidiyur road, Vizhidiyur Head Works at Vizhidiyur village in Neravy commune, Karaikal (II call)
Replacement of damaged 200mm D.I sluice valve to D.I Double flanged gate valve for delivery line in Veeran koil OHT at Neravy village, Karaikal
Providing and laying new 450mm dia DI pumping main at Vizhidiyur road (Southern side) for delinking the damaged prestressed concrete 450mm dia pipe and interlinking the pumping main with the existing pumping main (2 ends) at ch.3/540Km to 3/590Km (50