Loading…
Loading…
85,950 results • Latest
CONSTRUCTION WORK AT GOVT. SR. SEC. SCHOOL LAKHU BLOCK - SURAJGARH DIST. JHUNJHUNU
RJ-19-11/BA-295/2026-27/KHN
RJ-19-12/BA-295/2026-27/KHN
Unbranded Transparent Cellulose Tape of length 25 meter
Garbage Cleaning in Gram Panchayat Rajaheda
PCD, Renovation of WHS, Anicut renovation, CCT MJSA 2.0 Third Phase project area Khamnor
CONSTRUCTION VERANDAH WORK AT GOVT. SR. SEC. SCHOOL KALAKHARI BLOCK - BUHANA DIST. JHUNJHUNU
RJ-19-19/BA-295/2026-27/AKL
Strengthening and widening of Jal devi Mataji temple (Sansera) ro Railmagra via Bharai Road Distt. Rajsamand
REPAIR/ MAINT OF SEWAGE LINES, MANHOLES, SEPTIC TANKS, SOAKAGE WELL IN NORTHERN SECTOR AND SITARAM ENCLAVE AND REPAIR/MAINT OF ELETRICAL ITEMS IN ABHERA AT MIL STN KOTA
Construction of ECD, PCD, anicut and renovation work in MJSA 2.0 Third Phase project area Kumbhalgarh
CONSTRUCTION WORK AT MAHATMA GANDHI GOVT. SCHOOL MAHAPALWAS BLOCK - SURAJGARH DIST. JHUNJHUNU
RJ-19-18/BA-295/2026-27/AKL
FINAR Hydrochloric Acid (V3) Conforming to IS 265 7647-01-0 Chemical pure grade (CP) As per clause 5.1 of IS 265
Unbranded Laboratory Filter Papers of type Qualitative Filter Paper with Pore size 1.2 μm
Natraj Box of 10 Black Lead HB General Writing Pencil
Construction of ECD, Bawdi, RTWHS and Anicut Renovation in MJSA 2.0 Phase second project area kumbhalgarh
CONSTRUCTION OF BOUNDARY WALL WORK AT GOVT. UPPER PRIMARY SCHOOL CHANDRAPURA NUA BLOCK - MANDAWA DIST. JHUNJHUNU
RAJKIY PRATHMIK VIDHYALAY ME 2 KAMRE MAY BRAMDA NIRMAN KARY CHAK 4 MZW GRAM PANCHAYAT MIRZAWALI MER
RJ-19-17/BA-295/2026-27/AKL
RJ-19-16/BA-295/2026-27/AKL
EXIDE 12 Volt 26 Ah Stationary Valve Regulated Lead Acid Battery
Construction of anicut and anicut renovation in MJSA 2.0 Phase second project area kumbhalgarh
RJ-19-15/BA-295/2026-27/AKL
LOBA CHEMIE Colourless, Deliquescent Crystals Magnesium Chloride, 5 kg
Unbranded 64 GB Pendrive
Garbage Cleaning in Gram Panchayat Gudachandraji
MAJOR REPAIR WORK AT V.C. SUBEDAR SAWALRAM GOVT. SENIOR SECONDARY SCHOOL RANASAR (216047) BLOCK-NAWALGARH DIST. JHUNJHUNU
Renewal of left out portion of NH-8 (Balicha to Kaya Existing Byepass) from km 281, 400 to km 286.00 Distt. Udaipur
Construction of Dr. Shyama Prasad mukharji Model Convention centre at Barmer (Raj.)
RR KABEL 3 Core XLPE Cable, Conductor Area - 1.5 sq mm
RJ-19-14/BA-295/2026-27/AKL
RJ-19-13/BA-295/2026-27/AKL
REPAIR/ MAINT OF SEWAGE LINES, MANHOLES, SEPTIC TANKS, SOAKAGE WELL IN CENTRAL SECTOR AND REPAIR OF E/M ITEMS AT ELECTRICAL INSTALLATIONS AT MIL STN KOTA
VEEKON Tumbler Type with No Pen Socket Stationery Holder/Pen Stand
Strengthening of Amet to Aagriya road (4.50 km) Distt. Rajsamand
DIGITAL GROUNDING DEVICE MOBILE TRANSPORTABLE EARTHING PIT I PHASE
Borosil Petri plates or dishes, made of Borosilicate Glass of size 90 mm
Door to Door Garbage and Waste Collection and Segration, Road and Nali Safai and Samudayik Parisar ki Saf Safai Work all revenue village of Gram Panchayat CHHAREDA
Construction of 1 Govt. Senior Secondary School in Mokalwas and 2 Govt. Upper Primary School in Trilokpura and Shyampura (Total 3 Schools) in Rural Area (Excluding cost of cement)
RJ-19-10/BA-295/2026-27/KHN
ROHIDALA
Construction Of Basket Ball Court and Repair Work AT SHAHID MAJOR SHRI M. H. KHAN GOVT. SR SEC. SCHOOL DHANURI BLOCK-ALSISAR DIST. JHUNJHUNU
Door to Door Garbage and Waste Collection and Segration, Road and Nali Safai and Samudayik Parisar ki Saf Safai Work all revenue village of Gram Panchayat THOOMADI
RJ-19-09/BA-295/202627/KHN
Customized AMC/CMC for Pre-owned Products - BMC for FC and FCBC Battery Charger; Amara Raja; Annual Maintenance Contract (AMC); Six-Monthly; No
KBI Pen stand with Socket with Two Pen Socket Stationery Holder/Pen Stand
Construction of Bholikheda Amet to Patiya Khedavia Liki- Makarda-Rachheti road (20.50 km) Distt. Rajsamand
Renewal of gravelling at 220 KV GSS Dausa