Loading…
Loading…
4,389 results • Latest
KTPS-V stage -CAM-Inspection removal of silt and debris deposited over bottom of the sump for perfect seating of stop log gates and dewatering of sump before strainer by Insertion of stop log gates at CWPH and lifting of stop log gates after completion of work including all leads and lifts to be finished in complete shape as directed by the field Engineer.-Reg
Lateral Damper of 200Kgs. Capacity as per ICF Drg. No. DCEMU/M/ASR-0-5-005 alt. k6/latest. Damper shall be as per RDSO Spec. No C 8703 Rev.2 or latest.
Hyderabad Division: Proposed Construction of Running Room of 20 Beds capacity at MLY
Providing Catering Services at Mega Dairy
Supply of certain spares pertaining to HP and LP Governing valves, Emergency stop valve, Connecting parts between front bearing pedestal between Front bearing pedestal and Casing and Barring gear device of Drive Turbine of TDBFPs (1x500 MW) for Capital Overhaul 2026-27
Supply of HT Bolts and Nuts for Turbine and its Auxiliaries