Loading…
Loading…
44,245 results • Latest
Making arrangements for Vinayaka Nimajjanam festival in Division No.4,5,6,7,8,9 and 10
Making temporary arrangements for Ganesh Immersion in Yellapur, Gopalpauram and Bheemaram in Division no.55,56,65
Spreading of dust from Railway track to kota cheruvu in view of immersion of Lord Ganesha idols and Bathukamma in division no.31
Making temporary arrangements for Ganesh Nimarjanam festival in Pegadapally, Mucherla, Gundlasingaram and Vangapahad in Division No.1 and 2
Formation of Gravel and WMM for Ganesh Nimjjanam at Battupally, Kothapally and Kadipikonda in Div.No.44
Formation of Road near Siddeshwara Gundam Road connecting to Smart City road in view of immersion of Lord Ganesh idols and Bathukamma in Division No.30
Spreading of dust and formation road at Bandham tank bund for Ganesh idols immersion point in Division No.49
Formation of Gravel and W.M.M for Ganesh Nimajjanam at Madikonda and Rampur in Division No.46
Formation of Gravel for Ganesh Nimajjanam at Kummarigudem, Tharalapelly and Ayodyapuram in Division No.45
Renovation and maintenance of Central median from Habsiguda Junction to Nacharam Traffic signal in Circle-8 Nacharam, Uppal Zone, UBD, MMC. For the year 2026-27 ( Area :- 1500+380=1880 sqmt )
Development and Maintainance of greenery work in Maruthi Enclave Open Space, Ward-16 Kushaiguda, Circle-7 Kapra, Uppal Zone, MMC for the year 2026-27.
Road from Medaram Bridge to Reddygudem Bathing Ghat from Km 0/0 to 0/200 at Medaram (V) in Tadvai (M) of Mulugu (D), Est Cost: Rs.47.50 Lakhs
Road from Medaram Bridge to Reddygudem Bathing Ghat from Km 0/400 to 0/580 at Medaram (V) in Tadvai (M) of Mulugu (D), Est Cost: Rs.42.50 Lakhs
Road from Medaram Bridge to Reddygudem Bathing Ghat from Km 0/200 to 0/400 at Medaram (V) in Tadvai (M) of Mulugu (D), Est Cost: Rs.44.00 Lakhs
Road from Haritha Junction to Police Tower from Km 0/730 to 0/830 at Medaram in Tadvai (M) of Mulugu (D), Est Cost: Rs. 15.00 Lakhs
Road from Haritha Junction to police Tower from Km 0/390 to 0/730 at Medaram in Tadvai (M) of Mulugu (D), Est Cost: Rs. 45.00 Lakhs
Road from Medaram Bridge to police Tower at Medaram (V) in Tadvai (M) of Mulugu (D), Est Cost: Rs. 50.00 Lakhs
Road from Haritha Junction to police Tower from Km 0/0 to 0/390 at Medaram in Tadvai (M) of Mulugu (D), Est Cost: Rs. 50.00 Lakhs
R/F Karlapally to Crematoria of Govindaropet Mandal in Mulugu District, Est Cost: Rs.25.00 Lakhs
Renovation of Toilets in Uppal Zonal Office, MMC.
Laying CC road from H.No:6-3-1240/187 via 6-3-1240/90 to 6-3-1240/225/25 near MS Maqtha Eidgah in 219 Khairatabad circle-35, KZ, GHMC (Item No.12)
Laying of CC road from 3-6-64/1 to 3-6-106 at Avanthi nagar in Himayath Nagar ward -220, Khairthabad Circle-35, Khairthabad Zone, GHMC (Item No.01)
Restoration of Badly Damaged BT Road Patches at Various Locations in Ward no 11 and 12 of Boduppal Circle-10 Uppal Zone MMC (Recall)
Laying of CC road from Four Square apartment to The future kids Back side beside Royal Function Hall in Narsingi ward no.124, Narsingi Circle-45, SLP zone,CMC (ITEM NO.02)
Restoration of CC Roads at Various Locations and Laying of Speed Breakers at Nagarkurnool Road in Kalwakurthy Municipality under General Fund 2026-27
Annual Maintenance of Roads RnB Section Mustabad for the year 2026 to 27 in Rajanna Siricilla District
Spreading of dust for Pochamma Bonalu at Singaram, thimmapur, Allipur, Rajivgruhakalpa houses and Kadipikonda in Ward no.44, GWMC (2nd Call)
Laying of RCC Pipe line and table drain from central median near Peerzadiguda kaman to existing nala near ward no 10 Peerzadiguda of Boduppal Circle-10 Uppal Zone MMC
Providing of Arrangments in view of Ganesh festival from day one to Immersion of Ganesh Idols (At Palkonda Cheruvu. At Gangose Kunta Cheruvu and at Chindharpally immersion location) in Mahabubnagar Municipal Corporation
SUPPLY OF 2200 MTs of RBD-Refined Palmolein OIL
Laying of CC Road in place of badly damaged roads at H.No.13-5-815 and 816,13-5-814/A and 13-5-814/C,13-5-814/A at Masjid-E-Ghouse under Karwan-136, Cir-31, GZ, GHMC (Reserved for Wadderas and Sagaras)
A.M to PWD road Kottal to Kondapur (via) Rampur , Bhavanipet road from km.0/0 to 19/3, in Kamareddy District
AM to Karimnagar Kamareddy Yellareddy road from km 102/0 to 116/3 pertianing to Lingampet section in Kamareddy District
AM to Yellareddy PWD Road to Gandivet via Vellutla road from Km 0/0 to 17/3 in Kamareddy District
Arrangement of Inverter/UPS facility to all section computers in Tandur Municipality under Municipal General Funds.
ER to KKY Road to Reddypet R and B Road From Km 0/0 to 11/6 in Kamareddy District
Construction and Balance work of Kolbhai Community hall in ward No.2 at Sadasivpet Municipality under MGF.
INVITING BIDDERS FOR SUPPLY OF 22,00,000 Nos of HDPE Bags for Balamrutham Snack Food Balamrutham Kichidi and Upma Production
Shifting of 1No.DTR, 2Nos 11KV 9.1Mrs PSCC poles and 3Nos. LT 8.0Mtrs PSCC Poles located at H.No.14-137/4/1/10/1 and opposite H.No.13-1/54 due to falling within the alignment of the newly proposed drain work on the request of M/s. COMMISSIONER GHMC, in Mirzalguda Section of Malkajgiri Sub Division in Sainikpuri Division of Habsiguda Circle under DCW.
Annual Maintenance to (RnB) section, Warangal in (RnB) sub division, Warangal in Warangal District
Repairs to Water pipelines/borewells at various places in Annaram area in Gummadidala Municipality under MGF 2026-27.
Repairs to Water pipelines/borewells lines at various places in Domadugu area in Gummadidala Municipality MGF 2026-27
Repairs to Water pipelines/borewells lines at various places in Bonthapalli area in Gummadidala Municipality MGF 2026-27
REPAIRS TO UGD LINES AT VARIOUS PLACES IN ANNARAM AREA IN GUMMADIDALA MUNICIPALITY MGF 2026-27
Laying of CC road in Road No 5 from Suchitra Main road to H.No.6-307/E and apporach roads in Sri Krishna Nagar in ward no:286 Quthbullapur, Jeedimetla Circle -55,Quthbullapur Zone, CMC (Reserved for SC) (Item no.3) (Completion period 2 Months)
AM to Adilabad to Boath Road from km 24/0 to 48/0 in Adilabad for the year 2026-27.
Providing Civil works for establishment of EV Charging Stations in open site infront of old DMs office at BHEL
Construction of 1 No. of 1.0 m dia pipe culvert at km 8/800 to 9/0 on Kadipikonda to Warangal road from km 7/240 to 9/240 in Warangal District
Construction of Retaining wall to the damaged nala wall infront of Bus Depot Chengicherla
Design, Construction and handing over of readily habitable, livable, ready to hand over 480 EWS flats (each of carpet area 400 sft), with (Stilt + 10) floors pattern consisting of 4 blocks with conventional or Monolithic concrete construction with any innovative technology (Shear wall /Precast Technology or any as approved by TGHB) with suitable foundations as per soil conditions including Civil Works, Internal Infrastructure facilities such as Internal Water Supply and Sanitary Fittings, Internal Electrification, Lifts and Fire Fighting Services with 2 years defect liability period under EPC Contract system at Gajularamaram, Qutbullapur (M), Medchal-Malkajgiri District under Package No.VII.