Loading…
Loading…
512 results • Latest
Supply & Installation, testing & commissioning of Ultrasonic Gas Flow Meter for Frame -V Gas Turbine
Heavydutylongspanstorage System (Q3) (PACOnly)
Soda Ash as per IS 251- latest version, Non-ferric Alum as per IS 260– latest version, Sodium Hypochlorite solution as per IS 11673– latest version
Construction of masonry drain from the house of Subhash Das to the house of Shekhar Ghosh at ward no 22 under UMC_UDP_2026_27 Total Length of drain 103.00 m.
Construction of Paver block road including Protection wall at various locations under the ward no 21 UMC_UDP_2026_27. Length of P wall 150.00 m and Length of Paver block road 150.00 m.
Mtc. of masonry drain and construction of RCC slabs near the corner of the house of Iman Ulla Kaji to Nirmal Das at ward no 20 UMC_UDP_2024_25 Total Length 130.00 m.
Construction of Paver block road including Protection wall at various locations under the ward no 20 UMC_UDP_2026_27. Length of P wall 150.00 m and Length of Paver block road 150.00 m.