Loading…
Loading…
11,032 results • Latest
Day to day Guarding arrangment including Round -O-Clock guarding at Water Treatment Plant Site under Surface based water supply scheme for Panagarh Industrial Park under Durgapur Water Supply Division , PHE Dte.(w.e.f 01.08.2026 to 31.07.2027)
CONSTRUCTION OF CONCRETE ROAD FROM HEALTH CENTRE TO DURGA MANDIR AT GRAMKALNA UNDER DHATRIGRAM GRAM PANCHAYAT.
PROPOSED ESTIMATE FOR CONSTRUCTION OF CONCRETE ROAD FROM DULAL BASAK HOUSE TO MADHAB SHILL HOUSE AT DAKHIN DHATRIGRAM UNDER DHATRIGRAM GP
REPAIRING OF CONCRETE ROAD WITH PILLING FROM RAIL LINE TO BARGI DOBA AT BHABANIPUR UNDER DHATRIGRAM GRAM PANCHAYAT.
REPAIRING OF AWC NO 170 AT MALTIPUR BARMANPARA
REPAIRING OF CONCRETE ROAD FROM STKK ROAD TO DHATRIGRAM RAIL STATION AT BARO SWARAJPUR UNDER DHATRIGRAM GRAM PANCHAYAT
REPAIRING OF CONCRETE ROAD WITH PILLING FROM PAKKA RASTA TO MODERN CLUB AT CHALPARA UNDER DHATRIGRAM GRAM PANCHAYAT.
Annual Operation and Maintenance of Iron Elimination Plant (105 cum/he.) at Barakulta W/S Scheme under Nadia Division, PHE Dte.
Repairing of damage pipeline due to construction of drain, piling etc at Bagula Zone-II and Udaypur PWSS in Hanskhali and Santipur Block respectively under Ranaghat Sub- Division. PHE Dte.
Arrear payment of Annual Operation and Maintenance of Iron Elimination Plant (105 cum/Hr Capacity) at Barakulta W/S and (120 cum/Hr Capacity) at Bagula W/S scheme under Nadia Division PHE Dte. Period of work- 01.04.2026 to 31.08.2026 (153 Days)