Loading…
Loading…
16,928 results • Latest
Construction of Integrated Approach for making a Model School at Dholigaon FPS.
Construction of Paver Block at GP Premises with necessary repairing.
Construction of Additional Room at GP Building for BSK Purpose.
Patch repair in stretches of Barasat Basirhat Road from 11.00Kmp to 14.65Kmp (except Ch. 12.415Kmp to 12.585Km and Ch. 13.050Km to 13.105Km) under Barasat Division, PWD during the year 2026-27.
Patch repair in stretches of Barasat Basirhat Road from 3.50Km to 6.00Kmp under Barasat Division, PWD in the district of North 24 Parganas during the year 2026-27.
Patch repair in stretches of Barasat Basirhat Road from 0.00Kmp to 2.50Km under Barasat Division, PWD in the district of North 24 Parganas during the year 2026-27.
Patch repair in stretches of Barasat Basirhat Road from 17.00Kmp to 20.00Kmp (except 18.00Kmp to 18.40Km) under Barasat Division, PWD during the year 2026-27.
Const of CC drain with soakpit from Prasun ghosh shop to Kanu ghosh house at Srisurura(Activity Id-112351222)
DISMANTLING OF OLD G-plus-1 CISF BUILDING (DINAKAR BARRACK) AT RISHI BANKIM SHIPYARD, GRSE-KOLKATA