Loading…
Loading…
2,18,079 results • Latest
REPAIR/MAINT OF FMR/MBBR/SBT BASED STPS, SEWAGE PUMP HOUSES AND ITS ALLIED E/M INFRASTRUCTURE ALONGWITH CLEANING OF SUMPS AT VIJAY DURG UNDER GE(FW) KOLKATA
REPAIRING OF ROAD FROM H/O JAHAR MALLICK TO DHALAI ROAD .( 200FTX6FT) SCHOOL AT PS 106 UNDER NARAYANPUR BAHIRKHAND GP WITHIN HARIPAL DEV. BLOCK
INSTALLATION OF SUBMARSHAL WITH SOKPIT NEAR THE HOUSE OF ANIL MAHALDAR SANSAD XXI 24
REPAIR/MAINT OF GEYSER, APFC PANELS, LIGHTING ARRESTORS AND EARTHING AT POWER HOUSE AND OTHER E/S INSTLNS INSIDE VIJAY DURG UNDER GE(FW) KOLKATA
REPAIRING OF ROAD WITH PILLING FROM PASCHIM MALLICKPUR KORANIA MADRASA TO H/O SK AKBAR ALI ( LENGTH 160FT WIDTH 6FT) (PILLING -20FT) SCHOOL AT PS 106 UNDER NARAYANPUR BAHIRKHAND GP WITHIN HARIPAL DEV. BLOCK
REPAIR/MAINT OF GEYSER, APFC PANELS, LIGHTING ARRESTORS AND EARTHING AT ELECTRICAL SUB STATION OUTSIDE MOAT AREA UNDER GE (FW) KOLKATA
INSTALLATION OF SUBMARSHAL WITH SOKPIT NEAR THE HOUSE OF SAKIR ALI SANSAD XII 14
CONSTRUCTION OF GUARD WALL PASCHIM MALLICKPUR PRY SCHOOL AT PS 106 UNDER NARAYANPUR BAHIRKHAND GP WITHIN HARIPAL DEV. BLOCK
Restoration of Damage portion of Road namely Chandanpur to mahistikri under HaripalBlock
High End Desktop Computer (Q2) ( PAC Only ) (3 (3 ))
VACUUM GAUGE ALONGWITH COMPATIBLE CONTROLLER, CABLE AND CONNECTOR
Restoration of Damage Road from Haritgram to kantak Durgapur part of Chapsara to Nangai under HaripalBlock
COMPREHENSIVE REPAIR OF ROOP/SLABS AND STRENGTHING OF LOAD BEARING STRUCTURE AND CONNECTED SERVICES TO MARRIED AND CERTAIN SINGLE LIVING ACCN INSIDE VIJAY DURG UNDER GE (FW) KOLKATA
MAINTAINANCE OF WATER SUPPLY PIPE LINE BY REPARING OF LEAK AT SERVICE PIPE SERVICE MAIN AND PROVIDING STAND POST AT HALTU SCHOOL ROAD , KP ROY LANE , RAM LAL BAZZAR , GHOSH PARA AND SURROUNDING AREA AT WARD NO. 105 BR-XII
Restoration of Damage Road from DVC canal to seakhala Bazar part of Illipur to kumir gara under HaripalBlock
Canon Inkjet Colour A4 and Legal Size Multifunction Printer (MFP)
RESTORE OF WATER SUPPLY SERVICE PIPELINE BY REPAIRING OF LEAKS AND OTHER ANCILLARY WORKS AT SURVEY PARK, BARA KHOLA AND ITS SURROUNDING AREA IN WARD NO-109, BR-XII.
Restoration of Damage Road from Majdia siristala to jhapan tala under Balagargh Block
GREYWATER MANAGEMENT PROJECT AT PATHANTULI WITHIN GOLENOWHATIHATI GP UNDER SITALKUCHI DEV. BLOCK
REPARING OF ROAD FROM DULAL MURMU DOBA TO HO PRASHANTA MURMU(40 MTR) AT PS 105 UNDER NARAYANPUR BAHIRKHAND GP WITHIN HARIPAL DEV. BLOCK
CONSTRUTION OF SHED AT BAROWARITALA RATHTALA (16 FT X16FT) AT PS 105 UNDER NARAYANPUR BAHIRKHAND GP WITHIN HARIPAL DEV. BLOCK
ANSARI FURNITURE Low-back Chair With Fixed armrest with Padding
EMERGENCY LEAK REPAIRING OF 600MM DIA FILTERED WATER PIPE LINE ON 2 NO NETAI NAGAR MAIN ROAD NEAR DRAINAGE PUMPING STATION BY M.S JACKETING IN WARD NO. 109, BR- XII.
Construction work
REPAIR/MAINT OF HARDSTANDING, FOOTPATH, BOUNDARY WALL, TUNNELS AND OTHER MISC WORKS INSIDE VIJAY DURG UNDER GE(FW) KOLKATA
SAAL BALLAH PILLING AT BANGAL DOBA POND (150FT) AT PS 104 UNDER NARAYANPUR BAHIRKHAND GP WITHIN HARIPAL DEV. BLOCK
Supply of Finished Medicines
RESTORATION OF WATER SUPPLY SERVICE PIPELINE BY REPAIRING OF LEAKS AND OTHER ALLIED WORKS AT VIVEKANANDA PARK, 1 NO MUKUNDAPUR AND ITS SURROUNDING AREA IN WARD NO-109, BR-XII.
CONSTRUTIONOF BATHING GHAT AT KALAMDARA POND AT PS 104 UNDER NARAYANPUR BAHIRKHAND GP WITHIN HARIPAL DEV. BLOCK
CONSTRUTIONOF BATHING GHAT AT RAIPUKUR AT PS 104 UNDER NARAYANPUR BAHIRKHAND GP WITHIN HARIPAL DEV. BLOCK
Construction WOrk
Installation of Arsenic free Drinking Water Source near Ahammad House at Rajapur
CONSTRUCTION OF STAGE WITH SHED AT UTTARPARA IN PASCHIM NARA AT PS 104 UNDER NARAYANPUR BAHIRKHAND GP WITHIN HARIPAL DEV. BLOCK
CONSTRUCTION OF CHILDREN PARK AT SANSAD XXIX UNDER KANKSA GP
Installation of Mini High Mast Light at Chakthero Mosjidtala at Chakthero PS-46 under Chandanpur GP within Haripal Dev. Block
Construction Work
Title 1 GEAR
Installation of Arsenic free Drinking Water Source near Japiran Bewa House at Kathuriapara
Repairing of road from (A)PMGSY to H/O-Sanjay Sil (B) PMGSY to H/O- Satyanarayan Dey (C) H/O Ajit Kewra to H/O- Manas Sabbar (D) H/O- Subodh Karmakar to H/O-Samar Das at 89 PS area Under Kaikala G P Within Haripal Development Block
PROVN OF PATHWAY ALONG WITH PERIMETER WALL IN KV AREA AT AFS HASI MARA
Civil and Electrical Works
Repairing of road from (A) H/O-Palash Hazra to H/O-Kanai Maitra (B) H/O-Bijay Pal to H/O- Ganesh Pal (c) H/O Pusy Sabbar to H/O- Habibullah (D) H/O Jalal Mondal to H/O- Sudeb Mondal at 89 PS area Under Kaikala G P Within Haripal Development Block
Unbranded Leopard Packing Cloth 150 centimeter cm (Width)
Wire rope slings and sling legs (V3) conforming to IS 2762 (Q3), Forged Shackles for General Lifting Purpose (V2) Conforming to IS/ISO 2415 (Q3) (3 (3 ))