| 1 | 1₹6.0 LAccepted-AOC 36 151 E 73 PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 02 | 1 | Accepted-AOC L1 | |
| 2 | 2₹5.1 L+₹2,616.87 (0.51%)Rejected-AOC 36 151 E 25 PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 02 | SALEM | TAMIL NADU | 621011 | 2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹4,300
Closing Date
6 Mar 2024, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS 1 CA RWS Overhauling of Auxiliary Cooling Water Pumps 3 Nos including painting of pipe lines etc
2024_EB_428367_1
CE / MTPS-1 /SE / M-I / CA / OT.508 / 2023-2024
Open Tender
Power/Energy Projects/Products
Works
45 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹4,300
Yes
21 Dec 2024
21 Feb 2024
7 Mar 2024
21 Feb 2024
6 Mar 2024
21 Feb 2024
Amount
Charges for complete dismantling and cleaning of ACW pump parts such as pump stool, motor stool, column pipes, pump shaft, shaft coupling, impellers and pump casing etc., re assembling the pump.
Charges for cutting, renewal of existing worn-out wear rings, renewal of worn out line shaft and sleeves, line shaft bearings, inter bowl and bearings, inter bowl sleeves, pack box bearing and top shaft sleeves etc., if necessary and checking the trueness of line shafts etc.,
Charges for measuring overall lift, providing correct lift and locking with lock nut. Alignment of ACW pump with motor after tightening of motor bed bolts and finally observation and attending of minor defects if noticed during trial run of ACW pump including correcting the misalignment of base plate with pump Stool piece.
Charges for Painting two coats of enamel light bus green paint including cleaning the surface of the painting area of pump components, ACW supply and discharge pipe lines etc.
Charges for painting with one coat of rust convertor, one coat of epoxy red oxide primer and one coat of epoxy high build coal tar one over the other with proper intervals of pump column pipes, bowl assembly etc., immersed in water.
Charges for dynamic Balancing of Impellers of Aux CW pump of capacity 500m3/ 4 stages with shaft. (If necessary)
Charges for Overhauling of 300mm/ 350MM/ Gate valve/ Globe valve / NRV of 150 /300 Class.
Cost for Transportation of the Impellers with shaft for carrying out dynamic balancing for Sl.No-6.(If necessary).
Charges for leading, lifting and arranging platform and scaffolding wherever required for sl.no.4 dismantling after completion of work.
Cost for bus green enamel paint for Sl.no.4
Cost for epoxy red oxide primer for Sl.no.5
Cost for epoxy high build coal tar for Sl.no.5
Cost for epoxy Thinner for Sl.no.5
Cost of Enamel Thinner for Sl.no.4
Cost of PTFE Gland rope of size 10mm /12mm
Cost of 3mm thick Non metallic gasket
Cost of Neoprene rubber bush
Cost for consumables and T&P required for Sl.No-1 to 7
TAM AND CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .