| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹70.1 LAccepted-AOC 38 II FLOOR MOHAMMADPUR BHIKAJI CAMA PLACE NEW DELHI PIN 110066 | NEW DELHI | NEW DELHI | DELHI | 110066 | L-1 | Accepted-AOC Due lowest bidder | |
| 2 | L-2₹78.7 L+₹8.5 L (12.1%)Rejected-Finance | L-2 | Rejected-Finance Emerged as second lowest bidder | |
| 3 | L-3₹79.5 L+₹9.4 L (13.3%)Rejected-Finance JAIAWPDENG B P O UMROI P O UMIAM DISTRICT RI BHOI MEGHALAYA 793116 | UMIAM | RI BHOI | MEGHALAYA | 793116 | L-3 | Rejected-Finance Emerged as third lowest bidder | |
| 4 | L-4₹1.1 Cr+₹43.1 L (61.5%)Rejected-Finance 1506 15TH FLOOR CORPORATE PARK SECTOR 18 PLOT NO 14 15 VASHI NAVI MUMBAI 400 703 | NAVI MUMBAI | THANE | MAHARASHTRA | 400703 | L-4 | Rejected-Finance Emerged as forth lowest bidder |
Tender Value
₹82.8 L
EMD Value
₹1.7 L
Closing Date
19 Dec 2022, 6:00 pmClosed
AGM (Engg Civil)
o/o AGM (Civil), Pakyong Airport, East Sikkim-737106
Repair an Maintenance of Basic strip to maintain 40 mtrs clear width from Centre line of Runway in western side of Runway by cutting an providing Gabion Structure including raising height of the existing drain eastern side at Pakyong Airport
2022_AAI_136194_1
AAI/ENGG(C)/PAKYONG AIRPORT/RM WORKS/2022
Open Tender
Civil Works - Others
Item Rate
300 days
Pakyong Airport
As per NIT
2 documents required · 2 mandatory
₹1,180
₹1.7 L
3 Aug 2023
25 Nov 2022
21 Dec 2022
26 Nov 2022
19 Dec 2022
26 Nov 2022
26 Nov 2022 - 3 Dec 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 2 Kms. lead beyond 50 m of initial lead and lift upto 1.5 m. All kinds of soil
Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0 mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge
Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinc+PVC coated, Mesh wire diameter2.7/3.7mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm(ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer-in- charge. (The Stone boulder with least dimension 200mm to be used from the available boulders received from dismantling of existing gabion Structure and from excavated earth and breaking of boulders to be done if necessary and nothing extra shall be paid on this account.)
Dismantling Existing Gabion Structure by mechanical means (Hydraulic excavator)/manual means and including stacking of serviceable materials (boulders) and disposal of unserviceable material within the Airport Premises.
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres
Spreading earth materials & watering and rolling complete including preparation of the surface and rolling with road roller
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:1½:3 (1 cement : 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form work for :Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
M/s M.D. Syiem
M/S MAHENDRA PRASAD SHARMA
Rhoda Cognax Private Limited
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .