| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-AOC | L1 | Accepted-AOC Being lowest bid | |
| 2 | L2₹19.3 L+₹75,241 (4.06%)Rejected-Finance | L2 | Rejected-Finance Being other than lowest bid | |
| 3 | L3₹19.3 L+₹79,426 (4.28%)Rejected-Finance | L3 | Rejected-Finance Being other than lowest bid | |
| 4 | L4₹20.6 L+₹2.1 L (11.2%)Rejected-Finance | L4 | Rejected-Finance Being other than lowest bid | |
| 5 | L5₹20.8 L+₹2.3 L (12.4%)Rejected-Finance | L5 | Rejected-Finance Being other than lowest bid |
| Sl No | Description | Qty | Unit | s l sharma and sons L3 | SHIVAE CONSTRUCTION L13 | sohtra and co L11 | SINGH CONST CO L12 | KUMAR CONSTRUCTION CO L6 | MADAN LAL SHARMA AND SONS L2 | VARDHMAN INTERNATIONAL L16 | HANS RAJ SHARMA L9 | M/S SHREE RAM DUBEY AND SONS L14 | TULSI RAINA AND SONS L7 | M/S R S Builders L10 | takashdeep traders L4 | paras ram pachiala L5 | Sh. Manmeet Kumar S/o Late Sh. Rattan Gopal L15 | M/S GURU DEV BUILDERS L1 | M/S VINAY KUMAR SHARMA L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick work or stone masonry, built in cement mortar including all quoines, arches, pillars etc. but excluding ashlar facing, dressed stone work and precast concrete articles, complete all as specified and directed. | 50 | Cum | 20 ₹1,000 Lowest | 100 ₹5,000 | 50 ₹2,500 | 200 ₹10,000 | 100 ₹5,000 | 50 ₹2,500 | 100 ₹5,000 | 50 ₹2,500 | 50 ₹2,500 | 900 ₹45,000 | 100 ₹5,000 | 50 ₹2,500 | 50 ₹2,500 | 50 ₹2,500 | 36 ₹1,800 | 50 ₹2,500 |
| 2.00 | Demolition of cement concrete (un-reinforced) in any position i.e. floors and pavings etc, not exc 15cm thick below or above GL, complete all as specified and directed. | 20 | Cum | 20 ₹400 Lowest | 100 ₹2,000 | 50 ₹1,000 | 200 ₹4,000 | 100 ₹2,000 | 50 ₹1,000 | 150 ₹3,000 | 50 ₹1,000 | 100 ₹2,000 | 100 ₹2,000 | 100 ₹2,000 | 50 ₹1,000 | 50 ₹1,000 | 50 ₹1,000 | 41 ₹820 | 50 ₹1,000 |
| 3.00 | M&L for brick work with sub class 'B' bricks, old size, straight or curved on plan, exceeding 6 metre mean radius, built in cement mortar 1:6, complete all as specified and directed. | 35 | Cum | 2,800 ₹98,000 | 3,000 ₹1,05,000 | 2,500 ₹87,500 Lowest | 4,500 ₹1,57,500 | 3,200 ₹1,12,000 | 3,000 ₹1,05,000 | 5,600 ₹1,96,000 | 2,500 ₹87,500 Lowest | 4,000 ₹1,40,000 | 3,800 ₹1,33,000 | 4,500 ₹1,57,500 | 2,700 ₹94,500 | 3,000 ₹1,05,000 | 6,000 ₹2,10,000 | 3,400 ₹1,19,000 | 3,300 ₹1,15,500 |
| 4.00 | All as per serial item No. 3.00 here-in-above but except bricks with using existing bricks obtained from serial item No. 1.00 above including cleaning etc, complete all as specified and directed. | 10 | Cum | 1,000 ₹10,000 Lowest | 3,500 ₹35,000 | 2,400 ₹24,000 | 1,600 ₹16,000 | 1,500 ₹15,000 | 1,500 ₹15,000 | 2,800 ₹28,000 | 1,200 ₹12,000 | 1,500 ₹15,000 | 1,800 ₹18,000 | 1,000 ₹10,000 Lowest | 2,000 ₹20,000 | 1,200 ₹12,000 | 4,500 ₹45,000 | 1,150 ₹11,500 | 2,000 ₹20,000 |
| 5.00 | M&L for brick work with sub class ‘B’ bricks, old size, straight or curved on plan to any radius in half brick thick walls, built in CM 1:4, complete all as specified and directed. | 80 | Sqm | 500 ₹40,000 Lowest | 700 ₹56,000 | 3,000 ₹2,40,000 | 500 ₹40,000 Lowest | 700 ₹56,000 | 700 ₹56,000 | 2,000 ₹1,60,000 | 800 ₹64,000 | 900 ₹72,000 | 750 ₹60,000 | 1,000 ₹80,000 | 600 ₹48,000 | 600 ₹48,000 | 800 ₹64,000 | 610 ₹48,800 | 800 ₹64,000 |
| 6.00 | M&L for walling of random rubble, uncoursed, well bonded, bedded and solidly hearted, built in cement mortar 1:6, complete all as specified and directed. | 10 | Cum | 1,200 ₹12,000 Lowest | 2,800 ₹28,000 | 1,550 ₹15,500 | 2,400 ₹24,000 | 1,500 ₹15,000 | 1,200 ₹12,000 Lowest | 1,900 ₹19,000 | 1,500 ₹15,000 | 2,000 ₹20,000 | 1,800 ₹18,000 | 3,200 ₹32,000 | 1,800 ₹18,000 | 1,600 ₹16,000 | 3,200 ₹32,000 | 1,800 ₹18,000 | 1,600 ₹16,000 |
| 7.00 | All as per serial item No. 6.00 here-in-above but except stones.
Note :- Stones obtained from serial item No. 1.00 above shall be reused. | 5 | Cum | 800 ₹4,000 | 2,500 ₹12,500 | 1,500 ₹7,500 | 1,200 ₹6,000 | 1,300 ₹6,500 | 1,200 ₹6,000 | 1,300 ₹6,500 | 600 ₹3,000 Lowest | 1,300 ₹6,500 | 1,400 ₹7,000 | 2,000 ₹10,000 | 1,450 ₹7,250 | 900 ₹4,500 | 2,400 ₹12,000 | 750 ₹3,750 | 1,300 ₹6,500 |
| 8.00 | Taking down cement plaster of any description on brick work or stone masonry or cement concrete walls including raking out joints, hacking for key, scrubbing down with water including remaval of derbis, complete all as specified and directed. | 1,200 | Sqm | 2 ₹2,400 Lowest | 10 ₹12,000 | 5 ₹6,000 | 5 ₹6,000 | 10 ₹12,000 | 10 ₹12,000 | 10 ₹12,000 | 5 ₹6,000 | 5 ₹6,000 | 10 ₹12,000 | 2 ₹2,400 Lowest | 3 ₹3,600 | 2 ₹2,400 Lowest | 10 ₹12,000 | 3 ₹3,600 | 10 ₹12,000 |
| 9.00 | M&L for 15mm thick rendering in CM 1:4 with using WPC on fair faces of brick work or concrete surface including finishing the surface even and fair without using extra cement, complete all as specified and directed.
Note :- Cost for WPC shall be deemed to include in the quoted rates. | 1,500 | Sqm | 120 ₹1,80,000 | 160 ₹2,40,000 | 170 ₹2,55,000 | 165 ₹2,47,500 | 150 ₹2,25,000 | 100 ₹1,50,000 Lowest | 165 ₹2,47,500 | 180 ₹2,70,000 | 180 ₹2,70,000 | 130 ₹1,95,000 | 120 ₹1,80,000 | 180 ₹2,70,000 | 130 ₹1,95,000 | 230 ₹3,45,000 | 145 ₹2,17,500 | 160 ₹2,40,000 |
| 10.00 | Returning, filling in including spreading, leveling and well ramming in layers not exc 25cm in thick, complete all as specified and directed. | 5 | Cum | 20 ₹100 | 50 ₹250 | 50 ₹250 | 50 ₹250 | 40 ₹200 | 50 ₹250 | 60 ₹300 | 30 ₹150 | 80 ₹400 | 25 ₹125 | 200 ₹1,000 | 25 ₹125 | 10 ₹50 Lowest | 170 ₹850 | 45 ₹225 | 50 ₹250 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
2 Sept 2025, 6:00 pmClosed
GE (North) Udhampur
GE (NORTH) UDHAPMUR C/O 56 APO PIN-901220
REPAIR OF MAINT OF BOUNDARY WALL, FENCING, FOOTH PATH OF 5071 ASC BN, 5171 ASC BN, WSM AND ADJOINING AREA UNDER AGE B/R-II OF GE (N)UDHAMPUR
2025_MES_724512_1
GE/U(N)-61/2025-26
Open Tender
Civil Works
Item Rate
180 days
AOR of GE (North) Udhampur
As per NIT
6 documents required · 6 mandatory
₹500
GE (North) Udhampur
₹80,000
Yes
19 Sept 2025
5 Aug 2025
10 Sept 2025
5 Aug 2025
2 Sept 2025
20 Aug 2025
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .