Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.8 LAdmitted-Finance | -0.11% | ₹10.8 L | L1 | Admitted-Finance |
| 2 | L2₹10.8 LAdmitted-Finance GRAM BAMNAULI DISTRICT BAGHPAT | BAGHPAT | UTTAR PRADESH | -0.06% | ₹10.8 L | L2 | Admitted-Finance |
| 3 | L3₹10.8 LAdmitted-Finance | -0.01% | ₹10.8 L | L3 | Admitted-Finance |
| 4 | L4₹10.8 LAdmitted-Finance | +0.00% | ₹10.8 L | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹12.8 L
EMD Value
₹63,785
Closing Date
3 Mar 2026, 12:00 pmClosed
OFFICE EO NP HARRA
OFFICE EO NP HARRA
Construction of CC road and drain from Shafiq of store to Sadaqat of house in ward number 08.
2026_DOLBU_1114270_1
1038/NPH/2025-26 Date 09/02/2026
Open Tender
Civil Works
45 days
OFFICE EO NP HARRA
3 documents required · 3 mandatory
₹1,505
OFFICE EO NP HARRA
₹63,785
24 Mar 2026
10 Feb 2026
3 Mar 2026
10 Feb 2026
3 Mar 2026
10 Feb 2026
Earth work in Filling in embankment with approved material obtained from borrowpits with a lift upto1.5m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto10km asper Technical Specification Clause 301.5(Earth work with 10.000 km Lead) (Asper Analysis)
Concrete in 1:6:12 with cement,fine sand and brick ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work(Chpt-5/273)
M-150 brick work in 1:4 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,(as per analysis)
12mm thick Plaster in 1:4 with cement,coarse sand mortar including supply of all material, labour and T&P etc.required for proper completion of work,(asper analysis)
Laying of C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labour and T&P etc required for proper completion of work (Chpt-5/279a)
Providing,laying,spreading and compacting stone aggregate (22.4-53mm) of specific size to water bound macadam specification including spreading in uniform thickness,hand packing,rolling with wheeled steel/vibratory roller 8-10 tonnes in stage to proper grade and camber,applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate watering and compacting to the required density ( for Grading-III) asper Analysis
Construction of un-reinforced dowel jointed at expansion and construction joint only plain cement concrete pavement, thickness as per design over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 ( 1:1.5:3) M30 coarse and fine aggragate confirming to IS 383 maximun size of coarse aggragate not exceeding 25mm,mix in a concrete mixer not less then 0.2 cum capacity and appropriate weight batcher using approved m,ix design,laid in approved fixed side form work(steel channel laying an fixing of 125 micron thick polytheen film & dowel bars ,wedges ,steel plates including supply of all material,labour and T&P etc required for proper completion of work ( Asper Analysis)
Supply and fixing of Iron work such as heavy size Iron for channel including supply of all material,labour and T&P etc.required for proper completion of work,(asper sail)
Add sign board of granite stone
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_2066060.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid