Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-AOC | ₹2.7 Cr | L1 | Accepted-AOC Lowest quoted rate is accepted and work order is issued |
| 2 | L2₹2.8 Cr+₹10.3 L (3.80%)Rejected-Finance NO 1 80 1ST FLOOR CHELLAMMAL PANDIYAN ILLAM 3RD STREET SATHYAVATHY NAGAR PADI NEAR BSNL CHENNAI 600044 | CHENGALPATTU | TAMIL NADU | 600044 | ₹2.8 Cr+₹10.3 L (3.80%) | L2 | Rejected-Finance Due to High value rate quoted |
| 3 | L3₹3.0 Cr+₹28.5 L (10.5%)Rejected-Finance SAB JOHN THOTTAM OMALUR PO TK SALEM 636404 | SALEM | SALEM | TAMIL NADU | 636404 | ₹3.0 Cr+₹28.5 L (10.5%) | L3 | Rejected-Finance Due to High value rate quoted |
| 4 | L4₹3.1 Cr+₹42.6 L (15.8%)Rejected-Finance NO 18 A KACHI MADA STREET NEAR ALWAR BANGULOW KANCHIPURAM 631 502 | KANCHIPURAM | KANCHIPURAM | TAMIL NADU | 631502 | ₹3.1 Cr+₹42.6 L (15.8%) | L4 | Rejected-Finance Due to High value rate quoted |
Tender Value
₹2.8 Cr
EMD Value
₹2.1 L
Closing Date
12 Jul 2024, 3:00 pmClosed
Chief Engineer, TWAD, Vellore
No.8 First East Main Road, Gandhi Nagar, Vellore-6
WSS to Vadacheri in Tirupathur District
2024_TWAD_457962_1
IFB01vadacheri21624
Open Tender
Civil Works
Lump-sum
270 days
Tirupathur
Refer bid document
5 documents required · 5 mandatory
₹0
₹2.1 L
Vellore
17 Oct 2024
28 Jun 2024
15 Jul 2024
28 Jun 2024
12 Jul 2024
28 Jun 2024
3 Jul 2024
Amount
Providing WSS to Vadacheri and 17 other Rural Habitations in Madhanur Union of Tirupathur District under Vellore CWSS - Execution period – 9 months, Trial run period – 6 months and paid maintenance of the scheme – 12 months – e – Submission.
Construction of 1.35 LL capacity sump at Marapattu head works near River Palar - 1No
Laying and jointing of Branch gravity main & Pumping main from Head Works to Group sumps, Pumping main from Group sump to OHTs with branches (150 DI D/F) & ( 140 HDPE 6Ksc to 63 HDPE 6 Ksc ) -17.920Km
Supply & Erection of Pumpsets and accessories at Head works and Group sump sites
Construction of 0.85 LL capacity group sump at Pappanapalli - 1No
Construction of 0.95 LL capacity group sump at Melsanankuppam - 1No
Construction of 4mx3m Pump room at Sump sites - 3 Nos
Construction of 15mx15m compound wall at sump sites - 3 Nos
Annual Maintenance of the scheme
Sub Total
GST in 18%
Aiga Engineers Pvt Ltd (BID ID -1078633)
ANANTH CONSTRUCTIONS (BID ID -1081323)
P.Haridass (BID ID -1080033)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .