Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹31.2 LAccepted-AOC 19 NEW PARBHAT NAGAR MEERUT | ₹31.2 L | l1 | Accepted-AOC L1 |
| 2 | l2₹33.0 LRejected-Finance VILLAGE ULDEYPUR MEERUT | ₹33.0 L | l2 | Rejected-Finance l2 |
Tender Value
₹43.9 L
EMD Value
₹4.2 L
Closing Date
25 Mar 2026, 2:00 pmClosed
se pwd saharanpur
se pwd saharanpur
Reconstruction work of the damaged culvert of Bidoli Chausana to Laxmipura Road at Km 3 in Distt. Shamli in. F.Y. 2025-26
2026_CEMRT_1128257_1
1701/25MS-2026 Date 10-03-2026
Open Tender
Civil Works
shamli
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹4.2 L
27 May 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 2.5, 202(iiB). I/c all cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | |||||
| 2Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | |||||
| 3Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | |||||
| 4Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per MoRT&H specification clause No. 304, 9.01B(i). I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | |||||
| 5Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | |||||
| 6Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | |||||
| 7Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | |||||
| 8Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | |||||
| 9Supply & Fixing of 100 mm dia Drainage Spouts of MS with gratings as per drawing including cost of all materials, labour, T & P etc. required for proper completion of the work as per drawing and Technical specification. I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | |||||
| 10Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
BOQ_2104295.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid