| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 CrAccepted-AOC NO 6 7 TEACHER RAJAMANICKAM 3RD STREET CHENNAI BANGALORE NH SHENBAKKAM VELLORE 632 008 | VELLORE | TAMIL NADU | 632008 | ₹6.5 Cr Quoted ₹6.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹6.9 Cr+₹14.4 L (2.12%)Rejected-Finance | ₹6.9 Cr+₹14.4 L (2.12%) | L2 | Rejected-Finance highest bid |
| 3 | L3₹7.1 Cr+₹28.5 L (4.19%)Rejected-Finance | ₹7.1 Cr+₹28.5 L (4.19%) | L3 | Rejected-Finance highest bid |
Tender Value
₹6.5 Cr
EMD Value
₹3.3 L
Closing Date
27 Jan 2022, 3:00 pmClosed
SEHNRR Chengalpattu
B48, Alagesa Nagar, Chengalpattu
Construction of High Level Bridge at Km.0/8 of Karungali-Pasuvanayanikuppam road Across Agaram river
2021_HWAY_217714_1
05/2021-2022/SDO
Open Tender
Civil Works - Bridges
Item Rate
540 days
Vellore
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹3.3 L
chengalpattu
20 Oct 2022
28 Dec 2021
25 Feb 2022
28 Dec 2021
27 Jan 2022
28 Dec 2021
17 Jan 2022
Amount
Earth work excavation in all classes of soils,rock not requiring blasting and depositing on bank, with all leads and lifts as per SS20B, including all other incidental charges such as bailing out water, shoring, strutting, walling and forming protective bunds wherever necessary, etc., complete etc., complete as per relevant standard specification, for DRESSING THE BED UP TO SILL LEVEL
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank, with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for PILE CAP UNDER PIERS AND ABUTMENTS FOR FOUNDATION as per Section 300 & 304 of MORT&H Specifications (V Revision).
Providing and driving in position permanent steel liners for piles from bottom of pilecap as per Cl.709.1.4 of IRC 78-2014 (upto the maximum scour level ) including cost of liners and fabricating, welded construction with consumable, labour and plants and driving MS liners 6mm thick to be left permanently with the pile shaft as per requirement and as per standard specification, and placing them in position with all leads and lifts etc., complete.
Vibrated reinforced cement concrete cast-in-situ bored piles of 1000mm diameter in RCC M35 (Design mix) using 20mm ISS HBG graded metal with minimum cement content of 400 kg per cu.m maximum water content ratio of 0.4 and slump of 150-200 mm by tremie concreting including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel and placing it in position before concreting setting up of piling equipment, shifting the same from one pile location to another pile location dismantling and including all labour for boring through all soils, leading the excavated earth to a distance 200 m including forming of working platform over the river bed for accomadating piling equipment forming approaches to the working paltform, mixing concrete, filling it in position by tremie pipe, cutting of pile head to cut-off level for casting pilecap, including diversion of water course if necessary and all other incidental charges etc., complete as per standard specifications, forming and maintaining protective bunds and all other incidental charges etc., complete for PILES BELOW PIERS AND ABUTMENTS as per Section 1100 & 1700 of MORT&H Specifications (V Revision).
Plain cement concrete of grade M15 (Nominal mix 1:2:4) using 40mm ISS metal, including cost and conveyance of all materials to site and cost of cement at site including potable water ,labour charges for mixing,transporting, laying compacting, curing concrete , Tools and Plants and incidental charges such as bailing out water, maintaining protective bunds,cofferdams,shoring,structting etc; complete as per relevant standard specification, for LEVELLING COURSE BELOW PILE CAP UNDER PIERS & ABUTMENTS as per Sections 1100 of MORT&H Specifications (V Revision).
Vibrated reinforced cement concrete M35(Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site excluding cost of steel and fabrication but including cost of formwork,Soft water,labour charges for mixing, transporting, laying,curing concrete,working at depths,hire charges for tools and plants including all other incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for PILECAPS UNDER PIERS AND ABUTMENTS as per Sections 1100, 1500 & 1700 of MORT&H Specifications (V Revision).
Vibrated reinforced cement concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to siteand cost of cement at site but excluding cost and fabrication of steel but including cost of formwork,labour charges for mixing, transporting, laying,curing concrete,working at heights ,hire charges for tools and plants including all other incidental charges, etc., complete for SUBSTRUCTURE OF ABUTMENT AND RETURNS as per Sections 1500, 1700 & 2200 of MORT&H Specifications (V Revision).
Vibrated reinforced cement concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to siteand cost of cement at site but excluding cost and fabrication of steel but including cost of formwork,labour charges for mixing, transporting, laying,curing concrete,working at heights ,potable water,hire charges for tools and plants including all other incidental charges, etc., complete for BED BLOCK CUM DIRTWALL & PEDESTALS OVER ABUTMENTS as per Sections 1500, 1700 & 2200 of MORT&H Specifications (V Revision).
Vibrated reinforced cement concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to siteand cost of cement at site but excluding cost and fabrication of steel but including cost of formwork,labour charges for mixing, transporting, laying,curing concrete,working at heights ,potable water,hire charges for tools and plants including all other incidental charges, etc., complete for CIRCULAR PIERS (1200mm dia.) as per Sections 1500, 1700 & 2200 of MORT&H Specifications (V Revision).
Vibrated reinforced cement concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to siteand cost of cement at site but excluding cost and fabrication of steel but including cost of formwork,labour charges for mixing, transporting, laying,curing concrete,working at heights ,potable water,hire charges for tools and plants including all other incidental charges, etc., complete for CAPPING BEAM and PEDESTAL OVER PIERS as per Sections 1500, 1700 & 2200 of MORT&H Specifications (V Revision).
Supplying and fixing of Elastomeric bearing of size 400x300 x 80 mm including cost and conveyance to work site, labour for fixing the bearing in position and all other incidental charges etc., complete asper Section 2000 of MORT&H Specifications (V Revision).
Vibrated reinforced cement concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to siteand cost of cement at site but excluding cost and fabrication of steel but including cost of formwork,labour charges for mixing, transporting, laying,curing concrete,working at heights ,potable water,hire charges for tools and plants including all other incidental charges, etc., complete for T-BEAMS and CROSS BEAMS as per Sections 1500, 1700 & 2300 of MORT&H Specifications (V Revision).
Vibrated reinforced cement concrete M35 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to siteand cost of cement at site but excluding cost and fabrication of steel but including cost of formwork,labour charges for mixing, transporting, laying,curing concrete,working at heights ,potable water,hire charges for tools and plants including all other incidental charges, etc., complete for DECK SLAB, KERB &SAFETY KERB as per cl 1500, 1700 & 2300 of MORT&H Specifications (V Revision).
Vibrated reinforced cement concrete M40 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to siteand cost of cement at site but excluding cost and fabrication of steel but including cost of formwork,labour charges for mixing, transporting, laying,curing concrete,working at heights ,potable water,hire charges for tools and plants including all other incidental charges, etc., complete for CRASH BARRIER as per cl 811,1700 & 2703.3 of MORT&H Specifications (V Revision).
Supplying and installation of STRIP SEAL EXPANSION joint system conforming to specification for Road and Bridge Works published by Ministry of Surface Tranport(Roads Wing) in the 40mm wide expansion gap provided in between decks over piers and in between deck and dirt wall over abutment with fatigue tested structural steel section at the nosing and anchorage assembly, including cost and conveyance of materials,cost of testing as per the MORT&(H) specifications, including labour, equipment and incidental charges for fixing the joints complete in all respects, as per Section 2600 of MORT&H Specifications (V Revision).
Providing and fixing of G.I. Drainage spouts 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing including cost and conveyance of Galvanised Iron pipes and flats and fixing them in position, etc.,complete as per cl 2705 of MORT&H Specifications (V Revision).
Vibrated Cement Concrete M15 ( Nominal mix 1:2:4) using 40mm ISS HBG metal, including cost and conveyance of all materials to site and cost of cement at site, including all labour charges for mixing concrete ,laying,hire charges for Tools and plants, compacting,curing with leads for soft water, including all other incidental charges, form work etc., complete for SAFERTY KERB RAMP NEAR APPROACH SLAB, BASE COURSE BELOW APPROACH SLAB AND SAFETY KERB RAMP as per cl 1500, 1700 & 2074 of MORT&H Specifications (V Revision).
Vibrated reinforced cement concrete M35 (Design mix) using 20 mm ISS HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel including cost of formwork,labour charges mixing, transporting, laying,curing concrete,working at heights ,hire charges for tools and plants including all other incidental charges, etc., complete for APPROACH SLAB as per cl 1500, 1700 & 2704 of MORT&H Specifications (V Revision).
Vibrated Cement Concrete of grade M30 (Design mix) 75mm uniform thick with surface reinforcement conforming to Sections 2702.2 of MORT&(H) V Revision, using ISS HBG graded metal,including cost and conveyance of all materials to work site including cement at site, including all labour charges for mixing concrete, laying, hire charges for Tools and Plants, compacting, curing with all leads for potable water, including all other incidental charges formwork, etc, complete for WEARING COAT over DECK SLAB AND APPROACH SLAB as per cl 2702.2 of MORT&H specifications (V Revision).
Vibrated Cement Concrete M15 ( Nominal mix 1:2:4), using 40mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying and curing concrete , potable water , Tools and plants and incidental charges etc., complete as per relevant standard specification, for PARAPET as per Sections 1500 & 1700 of MORT&H Specifications (V Revision).
Providing and fixing Class 1 PVC seepage pipes of 110 mm dia of required lengths for abutments and wing walls including costs and conveyance of all materials to work site and labour charges for fixing, etc.,complete to drain the backfill as per cl 2706 of MORT&H Specifications (V Revision).
Providing FILTER MEDIA behind Abutment and return walls for 600mm thickness using filter material conforming to clause 309.3.2.B of MORTH wellpacked with smaller size towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges,etc complete as per Cl.710.1.4 & Appendix-6 of IRC:78-2014.
Filling behind Abutments and Return walls as per Appendix 6 of IRC:78-2014 with filling material having Ø value more than 35° free from cohesion, including cost and conveyance to worksite, laying, handling charges and filling in layers tamping under optimum moisture content to get the maximum density, including watering, with all leads and lifts for water and all other incidental charges, etc., complete as per Cl.710.1.4 & Appendix-6 of IC:78-2014.
Supply and fabrication of Fe-500 D steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over lapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc.,complete as per Section 2706 of MORT&H Specifications (V Revision).
Supply and fabrication of Fe-240 steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over lapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc.,complete as per cl 1600 of MORT&H Specifications (V Revision).
Supply and fixing of High quality of PVC Duct pipes of 160 mm dia 4 Kg/cm2 including cost and conveyance of pipes to the sie and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges complete for providing utility services in footpaths as per Section 2706 of MORT&H Specifications (Fifth Revision).
FORMATION OF APPROACH ROAD
Carted Earth (Providing and Laying Carted Earth with an average lead of 5.00Km including cost and conveyance of gravel to worksite including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting using power roller, tamping, ramming under optimum moisture content to obtain the maximum density including hire and fuel charges for water sprinkler, power roller and all other incidental charges et. complete as per standard specification - 97% as per MORT&H No.305 (vth rev)
Carted Earth (Providing and Laying Carted Earth with an average lead of 5.00Km including cost and conveyance of gravel to worksite including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting using power roller, tamping, ramming under optimum moisture content to obtain the maximum density including hire and fuel charges for water sprinkler, power roller and all other incidental charges et. complete as per standard specification - 95% as per MORT&H No.305 (vth rev)
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as baling out water shoring, strutting, walling and forming protective bunds wherever necessary etc., complete as per relevant standard specifications for CUTTING
Refilling with excavated soil (other than sand complying with standard sprecification for filling for excavated cutting portion et..complete
Providing Hard rock measured in solid including blasting & stacking (S.I.No.39)
Providing and laying, Spreading and compacting of Granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Rev-5. Gr.V
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick in two layers of 125mm each specification including premixing the materials with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5.
Providing and laying Prime Coat over WBM/WMM surface using 7Kg of Emulsion Bitumen(SS1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5.
Providing and laying Tack Coat over WBM/WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion(RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5.
Providing and laying 50mm consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm, 0.43 cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below and with 37 Kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher, vibratory / pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5.
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 30mm with mechanical paver finisher to the specified grades and cross sections and consolidatedby8-10tonne Vibratory/ Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9m paver finisher, Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.
CONSTRUCTION OF RCC & PCC RETAINING WALL ON A1 SIDE
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filing, clearing up the site and disposal of all surplus materials etc., complete for Foundation of RCC Retaining Walls as per MORT&H No.304
Vibrated Cement concrete M10 (Nominal mix ) 1:3:6 using 40mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete working at heights, Tools and Plants and incidental charges etc; complete as per relevant standard specification, for Leveling course for below footings of RCC Retaining walls as per MORT&H No.1000, 1500, 1700, 2200
Vibrated reinforced cement concrete M30 grade (Design Mix) using 20mm ISS size hard broken granite graded metal including cost and conveyance of all materials to site and cost of cement at site excluding cost and fabrication of steel but including form work and centering, soft water, labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights/depths hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for FOOTINGS OF RCC RETAINING WALLS as per MOR&H Vth specification No.1000, 1500, 1700, 2200
Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20mm ISS size HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel, but, including cost of form wok and centering, soft water all labour charges for mixing, transporting and placing in position, laying, vibrating, compacting, finishing concrete, curing concrete, working at depth, hire charges for tools and plants, including all other incidental charges, etc., complete for STEM OF RCC RETAINING WALLS as per MOR&H Vth specification No.1000, 1500, 1700, 2200
Providing and fixing seepage pipes of 110mm dia class.I PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill in Retaining Wall as per MOR&H Vth specification No.2706
Supply and fabrication of Fe-500 D grade steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over lapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc.,complete as per Section 1600 of MORT&H Specifications (Fifth Revision)
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION OF RETAINING WALL. as per MORT&H Vth Revision 304
Vibrated Cement Concrete M20 (1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for FOOTINGS OF RETAINING WALL as per MORT&H Vth Revision 1000, 1500, 1700, 2100
Vibrated Cement Concrete M20 (1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for STEM OF RETAINING WALL as per MORT&H Vth Revision 1000, 1500, 1700, 2100
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and returns including cost and conveyance of all materials to worksite, cost and labour for semisperical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., to drain of the backfill as per MORT&H Vth Revision 2700
Vibrated Cement Concrete M20 (1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Broken Parapet as per MORT&H Vth Revision 1000, 1500, 1700, 2100
CONSTRUCTION OF RCC & PCC RETAINING WALL ON A2 SIDE
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filing, clearing up the site and disposal of all surplus materials etc., complete for Foundation of RCC Retaining Walls as per MORT&H No.304
Vibrated Cement concrete M10 (Nominal mix ) 1:3:6 using 40mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete working at heights, Tools and Plants and incidental charges etc; complete as per relevant standard specification, for Leveling course for below footings of RCC Retaining walls as per MORT&H No.1000, 1500, 1700, 2200
Vibrated reinforced cement concrete M30 grade (Design Mix) using 20mm ISS size hard broken granite graded metal including cost and conveyance of all materials to site and cost of cement at site excluding cost and fabrication of steel but including form work and centering, soft water, labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights/depths hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for FOOTINGS OF RCC RETAINING WALLS as per MOR&H Vth specification No.1000, 1500, 1700, 2200
Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20mm ISS size HBG graded metal, including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel, but, including cost of form wok and centering, soft water all labour charges for mixing, transporting and placing in position, laying, vibrating, compacting, finishing concrete, curing concrete, working at depth, hire charges for tools and plants, including all other incidental charges, etc., complete for STEM OF RCC RETAINING WALLS as per MOR&H Vth specification No.1000, 1500, 1700, 2200
Providing and fixing seepage pipes of 110mm dia class.I PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill in Retaining Wall as per MOR&H Vth specification No.2706
Supply and fabrication of Fe-500 D grade steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over lapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc.,complete as per Section 1600 of MORT&H Specifications (Fifth Revision)
Vibrated Cement Concrete M20 (1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Broken Parapet as per MORT&H Vth Revision 1000, 1500, 1700, 2100
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION OF RETAINING WALL. as per MORT&H Vth Revision 304
Vibrated Cement Concrete M20 (1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for FOOTINGS OF RETAINING WALL as per MORT&H Vth Revision 1000, 1500, 1700, 2100
Vibrated Cement Concrete M20 (1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for STEM OF RETAINING WALL as per MORT&H Vth Revision 1000, 1500, 1700, 2100
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and returns including cost and conveyance of all materials to worksite, cost and labour for semisperical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., to drain of the backfill as per MORT&H Vth Revision 2700
Vibrated Cement Concrete M20 (1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Broken Parapet as per MORT&H Vth Revision 1000, 1500, 1700, 2100
IMPROVEMENTS OF EXISTING KARUNGALI-PASUVANAYANIKUPPAM ROAD
Picking the existing BT surface for levelling the undulations to required gradient and camber for laying wet mix macadam including all labour and all tools and plants at site including all incidental charges etc., complete.
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as baling out water shoring, strutting, walling and forming protective bunds wherever necessary etc., complete as per relevant standard specifications for BOX CUTTING for widening as per clause 304 of MORTH Rev-5.
Providing and laying, Spreading and compacting of Granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Rev-5.. Gr.V
Providing, laying / spreading and compacting graded stone aggregates to Wet Mix Macadam of required thickness, specification including premixing the materials with water at OMC in mechanical mix plant and carrying the mixed material by tipper lorriers to the work site and laying in uniform layers with pavers as base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rental charges for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5.
Providing and laying Prime coat over WMM surface using 7.00 kg. of Emulsion bitumen (S.S-1) per 10 sqm. for prepatory to another bituminous construction over it, including cost of material, labour charges, rental charges for machinery, fuel and all other incidentals charges etc., complete as per clause 502 of MORTH Rev-5.
Providing and laying Tack coat over WMM surface (treated with primer) using 2.50 kg. of Bitumen Emulsion (RS-1) per 10 sqm. for preparatory to another bituminous construction over it including cost of material, labour charges, rental charges for machinery, fuel and all other incidental charges etc., complete as per clause 503 of MORTH Rev-5.
Providing and laying 50mm consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm,0.43 cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below and with 37 Kgs of VG30/VG40 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher, vibratory / pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5.
Providing and laying Bituminous Concrete to 30mm thick using ISS HBG graded metal premixing with 5.00-5.50% of VG 30 grade bitumen by weight of aggregates (as per Job mix formula) including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne vibratory / pneumatic roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher, vibratory / pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 MORTH Rev-5.
Providing and laying of carted earth with an average lead of 5.0 km. in accordance with the requirements of the specifications and the materials shall be laid in one or more layers as necessary according to lines, grades and cross sections shown in the drawings or as directed by the Engineer in charge for berms as per clause 304&305 MORTH Rev-5.
CONSRUCTION OF BOX CULVERT
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATIO OF BOX CULVERT as per MOR&H Vth specification No.304
Plain Cement Concrete M-15 Grade, Nominal Mix, 1:2:4, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of form work, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in depths and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for Leveling course for Box culvert as per MOR&H Vth specification No.1000, 1500, 1700, 2200
Vibrated Cement Concrete M20 (1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for STEM AND FOOTING OF WING WALL as per MORT&H Vth Revision 1000, 1500, 1700, 2100
Vibrated Cement Concrete M25 design mix using 20mm ISS size HBG graded metal including cost and conveyance of all materials to worksite including cost of cement at site including soft water, labour charges for mixing transporting, laying and curing concrete, etc., complete as per relevant standard specification for Base Slab, Cover Slab and Side walls excluding Cost of Steel for culvert as per MOR&H Vth specification No.1000, 1500, 1700, 2200, 2300
Providing and fixing PVC seepage pipes of 100mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing, etc. complete to drain the backfill in between abutment and wings as per MOR&H Vth specification No.2707
Providing and fixing of G.I drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting at least 600mm beyond the bottom of Deck slab as shown in the drawing including cost and conveyance of Galvanized iron pipes and flats and fixing them in position etc, complete as per MOR&H Vth specification No.2705
Supply and fabrication of Fe-500 D grade steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over lapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc.,complete as per Section 1600 of MORT&H Specifications (Fifth Revision)
Vibrated Cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite including cost of cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, form work, cost of pre moulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over Top slab of Box culvert as per MOR&H Vth specification No.2702
Vibrated Cement Concrete M20 (1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Over Box Cullvert Parapet as per MORT&H Vth Revision 1000, 1500, 1700, 2100
Filling behind Outer walls with clean gritty gravel including cost and conveyance to worksite, laying, handling charges and filling in layers tamping under optimum moisture content to get the maximum density, including watering, with all leads and lifts for water and all other incidental charges, etc., complete as per as per MORT&H Vth Revision 1000
Dismantling clearing away and carefully stackling the materials useful for reuse of RR masonry in cement mortar under 3 m height as per MOR&H Vth specification No.202
Dismantling clearing away and carefully stackling the materials useful for reuse of Custone slab in cement mortar under 3 m height as per MOR&H Vth specification No.202
Dismantling clearing away and carefully stackling the materials useful for reuse of Plain cerment concrete in cement mortar under 3 m height as per MOR&H Vth specification No.202
CONSTRUCTION OF PCC RETAINING WALL KARUNGALI SIDE
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION OF RETAINING WALL. as per MORT&H Vth Revision 304
Vibrated Cement Concrete M20 (1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for FOOTINGS OF RETAINING WALL as per MORT&H Vth Revision 1000, 1500, 1700, 2100
Vibrated Cement Concrete M20 (1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for STEM OF RETAINING WALL as per MORT&H Vth Revision 1000, 1500, 1700, 2100
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and returns including cost and conveyance of all materials to worksite, cost and labour for semisperical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., to drain of the backfill as per MORT&H Vth Revision 2700
Vibrated Cement Concrete M20 (1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Broken Parapet as per MORT&H Vth Revision 1000, 1500, 1700, 2100
CONSTRUCTION OF PCC RETAINING WALL PASUVANAYANIKUPPAM SIDE
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS 20 B including cost of all labour materials, tools equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOUNDATION OF RETAINING WALL. as per MORT&H Vth Revision 304
Vibrated Cement Concrete M20 (1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for FOOTINGS OF RETAINING WALL as per MORT&H Vth Revision 1000, 1500, 1700, 2100
Vibrated Cement Concrete M20 (1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for STEM OF RETAINING WALL as per MORT&H Vth Revision 1000, 1500, 1700, 2100
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and returns including cost and conveyance of all materials to worksite, cost and labour for semisperical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., to drain of the backfill as per MORT&H Vth Revision 2700
Vibrated Cement Concrete M20 (1:1.5:3) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site, including cost of formwork, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Broken Parapet as per MORT&H Vth Revision 1000, 1500, 1700, 2100
SEVICE ROAD
Carted Earth (Providing and Laying Carted Earth with an average lead of 5.00Km including cost and conveyance of gravel to worksite including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting using power roller, tamping, ramming under optimum moisture content to obtain the maximum density including hire and fuel charges for water sprinkler, power roller and all other incidental charges et. complete as per standard specification - 97% as per MORT&H No.305 (vth rev)
Granular Sub Base with graded material (Table :- 400-1)Plant Mix Method (Construction of granular sub base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) - for grading -V Material
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick in two layers of 125mm each specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to the site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5
Providing and laying Prime Coat over WBM/WMM surface using 7Kg of Emulsion Bitumen(SS1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5.
Providing and laying Tack coat over WMM surface (treated with primer) using 2.50 kg. of Bitumen Emulsion (RS-1) per 10 sqm. for preparatory to another bituminous construction over it including cost of material, labour charges, rental charges for machinery, fuel and all other incidental charges etc., complete as per clause 503 of MORTH Rev-5.
Providing laying and rolling of Close Graded Premix Carpet of compacted 20mm thickness using 0.0162 cum of 13.20-11.20mm, 0.1404 cum of 11.2-5.6mm, 0.0729 cum of 5.60-2.80mm, 0.0405 cum of 2.80mm and below (Type B) graded HBG metal using 19Kg of VG30 bitumen for 10sqm including premixing at CMP, conveyance by tipper lorry, laying by paver finisher and rolling by Vibratory Roller including cost and conveyance of all materials, ire charges of all T&P all labour chages, fuel and all other other incidental charges etc., complete as per specification using CMP as per clause 508 MORTH Rev-5.
Sub Total Bid Price (in figures)
GST @ 12% of above all Schedules (in figures)
S NAGARAJAN
SRI YOGALAKSHMI BLUEMETAL INDUSTRIES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .