Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.5 LAdmitted-Technical | L1 | Admitted-Technical Accept | |
| 2 | L2₹25.1 L+₹61,606.98 (2.51%)Admitted-Technical | L2 | Admitted-Technical Accept |
| Sl No | Description | Qty | Unit | M.MURUGADHAS L2 | JOSEPH BENEDICT L1 |
|---|---|---|---|---|---|
| 1.00Construction of Additional Three classrooms at Colachel Government middle school in Colachel municipality of Kurunthencode panchayat union. | |||||
| 2.00 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., | 70.47 | M3 | 171.36 ₹12,075.74 | 167.16 ₹11,779.77 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc., complete. | 52.02 | M3 | 4,398.2 ₹2,28,794.36 | 4,290.4 ₹2,23,186.61 Lowest |
| 4.00 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grills for RCC works including cost of steel and binding wire etc., complete. | 3.6 | MT | 70,158.15 ₹2,52,569.34 | 68,438.59 ₹2,46,378.92 Lowest |
| 5.00 | R.C.C 1:11/2:3 using 20mm meta for all RCC works including curing and providing fixtures like fan clamps in the RCC roof wherever necessary and bearing curfaces of walls sides and bottom at slabs etc | 33.4 | M3 | 7,544.74 ₹2,51,994.32 | 7,359.82 ₹2,45,817.99 Lowest |
| 6.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,(below basement) | 23.57 | M2 | 383.52 ₹9,039.57 | 374.12 ₹8,818.01 Lowest |
| 7.00 | Random rubble masonry in CM 1:5 using rough and bond stone including all cost and conveyance of materials to site and all labour charges etc | 41.57 | M3 | 4,489.9 ₹1,86,645.14 | 4,379.85 ₹1,82,070.36 Lowest |
| 8.00 | Brick work with cement mortar 1:5 mix using country bricks of size 8 3/4"x4 1/4"x2 3/4" for foundation and basement and superstructure including cost and conveyance of all materials curing etc., complete. | 50.41 | M3 | 5,802.72 ₹2,92,515.12 | 5,660.5 ₹2,85,345.81 Lowest |
| 9.00 | Supplying filling with crushed stone sand including all cost | 12.24 | M3 | 1,749.88 ₹21,418.53 | 1,706.99 ₹20,893.56 Lowest |
| 10.00 | Filling work excavated earth including all labour charges for filling sand including all cost and conveyance of materials to site and all labour charges | 76.77 | M3 | 29.89 ₹2,294.66 | 29.15 ₹2,237.85 Lowest |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
20 Sept 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO
Block development office Kurunthencode
Construction of Additional Three classrooms at Colachel Government middle school in Colachel municipality of Kurunthencode panchayat union
2021_RDTN_210305_1
A3/3117/2021
Open Tender
Civil Works - Buildings
Works
180 days
Block development office Kurunthencode
As per Technical bid
2 documents required · 2 mandatory
₹0
₹25,000
kurunthencode
21 Sept 2021
11 Sept 2021
20 Sept 2021
11 Sept 2021
20 Sept 2021
11 Sept 2021
11 Sept 2021
90 days
stage.html
html • 0.02 MB
tech_eval.pdf
finance_249469.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .