Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
22 Oct 2026, 5:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer
Municipal Corporation Patiala
CONSTRUCTION OF ROOM FOR SHRI RADHA KRISHAN SEWA SAMITI WARD NO.40 Est Cost Rs. 15.00 lacs dt 22/23.10.2026
2026_DLG_177328_1
MCP/2026/278-280/02
Open Tender
Civil Works - Buildings
Percentage
93 days
Patiala
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹30,000
Yes
14 Oct 2026
14 Oct 2026
23 Oct 2026
14 Oct 2026
22 Oct 2026
14 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (CHAPTER 11-11.6) First class burnt brick work laid in cement sand mortar 1:5 in first storey upto 4 metres above plinth level. | 51.16 | Cum | 5,426.58 | ₹2,77,621.61 |
| 2 | (CHAPTER 11-11.29 a) Extra for work done in additional storey upto 4 metre above the top of structural roof of lower storey for Brick Work/ Concrete Block/ Clay Block. | 51.16 | Cum | 153.81 | ₹7,868.92 |
| 3 | (CHAPTER 11-11.29 c) Extra for 115mm/100mm thick walls for additional storey upto 4 meters above the top of structural roof of lower storey for Brick Work/ Concrete Block/ Clay Block. | 82.78 | Sq.Mtr | 15.8 | ₹1,307.92 |
| 4 | (CHAPTER 11-11.36) 115mm thick brick wall in cement sand mortar 1:4 without reinforcement in superstructure. | 82.78 | Sq.Mtr | 674.24 | ₹55,811.36 |
| 5 | (CHAPTER 10-10.13-a-ii) Cement concrete 1:2:4 With stone ballast or shingle, mixing by mechanical means using concrete mixer volumetric type | 4.88 | Cum | 5,460 | ₹26,654.74 |
| 6 | (CHAPTER 10-10.21) Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. | 25.4 | Cum | 7,107 | ₹1,80,492.29 |
| 7 | (CHAPTER 10-10.48) Extra for R.C.C/PCC. work done in each subsequent storey above the first storey up to height of 4 metres or part thereof up to the roof top level of that storey. | 25.39 | Cum | 190.68 | ₹4,841.37 |
| 8 | (CHAPTER 9-9.4) Centering and shuttering for columns (Square or rectangular or poly gonal in plain) | 49.05 | Sq.Mtr | 502.52 | ₹24,650.04 |
| 9 | (CHAPTER 9-9.6) Centering and shuttering for sides and soffits of beam, beams, launching girders, bressumers, lintels. | 45 | Sq.Mtr | 400.33 | ₹18,014.85 |
| 10 | (CHAPTER 9-9.8) Centering and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc. | 100 | Sq.Mtr | 560.46 | ₹56,046 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_361626.xls
BOQ • 0.34 MB
radha.pdf
Tender Documents • 0.13 MB
radhakrishan15.pdf
Tender Documents • 0.07 MB
tenderlist278third.pdf
Tender Documents • 0.42 MB
COPYSOPnotification.pdf
Tender Documents • 0.21 MB
Generaltenderconditions.pdf
Tender Documents • 4.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .