Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹25.4 L−₹5.5 L (17.7%)Accepted-Finance | ₹25.4 L−₹5.5 L (17.7%) | 2 | Accepted-Finance financially accepted |
| 2 | 1₹30.9 LRejected-Finance | ₹30.9 L | 1 | Rejected-Finance financially rejected |
| 3 | 3₹28.3 L−₹2.6 L (8.53%)Rejected-Finance | ₹28.3 L−₹2.6 L (8.53%) | 3 | Rejected-Finance financially rejected |
| 4 | 4₹29.0 L−₹1.9 L (6.24%)Rejected-Finance | ₹29.0 L−₹1.9 L (6.24%) | 4 | Rejected-Finance financially rejected |
| 5 | 5₹28.2 L−₹2.7 L (8.62%)Rejected-Finance | ₹28.2 L−₹2.7 L (8.62%) | 5 | Rejected-Finance financially rejected |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
14 Jul 2026, 4:30 pmClosed
EXECUTIVE ENGINEER PMGSY DIVISION KULGAM
EXECUTIVE ENGINEER PMGSY DIVISION KULGAM near TEHSIL OFFICE
Permanent Restoration of Road from 1X30 M Span Trussed Girder Bridge On Bb Qoimoh To Chinigam Via Frisal Road (Rd 1500) Package No Jk18-3003B1
2026_KSRRD_148531_1
04/EE/PMGSY/DB/KULGAM OF 2026-27 DT 06-07-2026
Open Tender
Civil Works - Roads
Percentage
30 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
₹1 L
Yes
18 Jul 2026
7 Jul 2026
15 Jul 2026
7 Jul 2026
14 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Permanent Restoration of 1x30 m span Bridge at Kujjar on " BB Qaimoh to Chinnigam via Frisal road" AT RD 1500 Package No: JK18- 3003B1 | - | - | - | - |
| 2 | Part A Crate wall Protection | - | - | - | - |
| 3 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : RD 1+500 (Bridge upstream and Downstream on B/S) | 216 | Cum | 225.21 | ₹48,645.36 |
| 4 | Stone boulder (Nallah) nominal size 225 mm | 673.2 | Cum | 1,167.3 | ₹7,85,826.36 |
| 5 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 792 | Cum | 325.43 | ₹2,57,740.56 |
| 6 | Extra for every additional lift of 1.5m or part thereoff beyond 1.5m height for hand packing in wire creates lifting stones 1.5m above ground level | 345.6 | Cum | 62.58 | ₹21,627.65 |
| 7 | Add cost of wire crate of approved mesh size and material 100 mm x100mm x4mm | 2,656.29 | Sqm | 219.2 | ₹5,82,258.77 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:(1:2:4) Cooping over crates | 19.2 | Cum | 6,429.44 | ₹1,23,445.25 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. Cooping over crates | 32 | Sqm | 251.07 | ₹8,034.24 |
| 10 | PART (B) Retaining Wall | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_233274.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.06 MB
Sascinit2.pdf
Tender Documents • 3.04 MB
BOQ_233274.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .