Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
Tender Value
₹12.9 L
EMD Value
₹14,000
Closing Date
23 Jul 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
DRDA,Ranipet
Ranipet District Rejuvenation of 2 Nos of SFC Pond in Arcot Block Package No.8
2020_RDTN_171400_1
A9-3844-2019
Open Tender
Civil Works
Item Rate
180 days
DRDA, Ranipet
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,000
21 Sept 2020
15 Jul 2020
23 Jul 2020
15 Jul 2020
23 Jul 2020
15 Jul 2020
90 days
Amount
Arcot Block
1. Rejuvenation of Kavarapalayam Kulam in Kavarapalyam village h/o Ayilam Panchayat in Arcot Block
Clearing the Scrub Jungle, Julliflora Jungle and disponsing of the same as directed by the Engineer incharge of works and as per technical specifical (Specification 2.2)
Julliflora Jungle with uprooting
Earth work in all soils except hard rock requiring blasting and conveying and formation of bound with 0 to 100m deploying earth moving machineries and tippers
Total Earth work Quantity
Construction of Retaining Wall for Baby Pond
Earth work excation and depositing on bank witrh initial lead and lift in hard gravelly soil, hard stiff clay, block cotton soil, hard red earth, shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation
Cement Conrete 1:4:8 mix using 40 mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and errecting Centering Shuttering with necessary supports including cost and conveyance and all labnour charges
CC 1:3:6 mix using 40 mm metal including cost and conveyance and all labour charges etc
Construction of BATHING GHAT, STEPS, OUTER PLATFORM
Earth work excation and depositing on bank witrh initial lead and lift in hard gravelly soil, hard stiff clay, block cotton soil, hard red earth, shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation
Cement Conrete 1:4:8 mix using 40 mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and errecting Centering Shuttering with necessary supports including cost and conveyance and all labnour charges
CC 1:3:6 mix using 40 mm metal including cost and conveyance and all labour charges etc
CC 1:3:6 mix using 20 mm metal including cost and conveyance and all labour charges etc
CC 1:2:4 mix using 20 mm metal including cost and conveyance and all labour charges etc.,
Construction of Steps Over Bund
Earth work excation and depositing on bank witrh initial lead and lift in hard gravelly soil, hard stiff clay, block cotton soil, hard red earth, shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation
Cement Conrete 1:4:8 mix using 40 mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and errecting Centering Shuttering with necessary supports including cost and conveyance and all labnour charges
CC 1:3:6 mix using 40 mm metal including cost and conveyance and all labour charges etc
CC 1:2:4 mix using 20 mm metal including cost and conveyance and all labour charges etc.,
2. Rejuvenation of Papan Kulam Kulam in Karadimalai Village h/o of Sambasivapuram Panchayat in Arcot Block
Clearing the Scrub Jungle, Julliflora Jungle and disponsing of the same as directed by the Engineer incharge of works and as per technical specifical (Specification 2.2)
Julliflora Jungle with uprooting
Earth work in all soils except hard rock requiring blasting and conveying and formation of bound with 0 to 100m deploying earth moving machineries and tippers
Total Earth work Quantity
Construction of Retaining Wall for Baby Pond
Earth work excation and depositing on bank witrh initial lead and lift in hard gravelly soil, hard stiff clay, block cotton soil, hard red earth, shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation
Cement Conrete 1:4:8 mix using 40 mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and errecting Centering Shuttering with necessary supports including cost and conveyance and all labnour charges
CC 1:3:6 mix using 40 mm metal including cost and conveyance and all labour charges etc
Construction of BATHING GHAT, STEPS, OUTER PLATFORM
Earth work excation and depositing on bank witrh initial lead and lift in hard gravelly soil, hard stiff clay, block cotton soil, hard red earth, shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation
Cement Conrete 1:4:8 mix using 40 mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and errecting Centering Shuttering with necessary supports including cost and conveyance and all labnour charges
CC 1:3:6 mix using 40 mm metal including cost and conveyance and all labour charges etc
CC 1:3:6 mix using 20 mm metal including cost and conveyance and all labour charges etc
CC 1:2:4 mix using 20 mm metal including cost and conveyance and all labour charges etc.,
Construction of Steps Over Bund
Earth work excation and depositing on bank witrh initial lead and lift in hard gravelly soil, hard stiff clay, block cotton soil, hard red earth, shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation
Cement Conrete 1:4:8 mix using 40 mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and errecting Centering Shuttering with necessary supports including cost and conveyance and all labnour charges
CC 1:3:6 mix using 40 mm metal including cost and conveyance and all labour charges etc
CC 1:2:4 mix using 20 mm metal including cost and conveyance and all labour charges etc.,
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
K.ABDULLA
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .