Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Finance | -11.55% | ₹1.1 L | L1 | Admitted-Finance |
| 2 | L2₹1.2 LAdmitted-Finance | -7.72% | ₹1.2 L | L2 | Admitted-Finance |
Updated dates
Tender Value
₹1.3 L
EMD Value
₹2,600
Closing Date
20 Feb 2026, 2:00 pmClosed
EE PWD DN Beawar
Beawar
Repair and Maintainance work at Abhilekhagar and ADJ-03 in Court Campus, Beawar
2026_CEPWD_539264_8
NIT No. 18 2025-26
Open Tender
Civil Works
30 days
BEAWAR
As per Tender Documents
2 documents required · 2 mandatory
₹500
EE PWD DN Beawar
₹2,600
Yes
25 Feb 2026
16 Feb 2026
20 Feb 2026
16 Feb 2026
20 Feb 2026
16 Feb 2026
16 Feb 2026 - 20 Feb 2026
Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. metres and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 m lead With cement mortar 1 :4 ( 1 cement : 4 coarse sand)
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade including all scaffolding: New work (two or more coats) over and including scrapping and priming coat with cement primer
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Two or more coats on new work
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : Sqm. 372.00 (i) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. (ii) laying second layer of Fiber glass cloth when the first layer is still green . Overlaps of joints of fiber cloth should not be less than 10 cm . (iii) Third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proffing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30cm on parapet wall and tucked into groove in parapet all around (iv) fourth and final layer of brick tiling „with cement mortar or any other approved protective coarse. (which will be paid for separately) For the purpose of measurement the entire treated surface will be measured
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
TENDERDOCUMENTS.pdf
Tender Documents • 16.29 MB
BOQ_961551.xls
BOQ • 0.23 MB
nit.pdf
Tender Documents • 0.57 MB
Download all tender documents and submit your bid