Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | L1 | Accepted-AOC Lowest bid. Hence awarded | |
| 2 | L2₹2.7 L+₹2,802 (1.05%)Rejected-Finance | L2 | Rejected-Finance Higher bid amount. Hence rejected. | |
| 3 | L3₹2.8 L+₹16,901 (6.35%)Rejected-Finance | L3 | Rejected-Finance Higher bid amount. Hence rejected. | |
| 4 | L4₹2.9 L+₹23,482 (8.82%)Rejected-Finance | L4 | Rejected-Finance Higher bid amount. Hence rejected. | |
| 5 | L5₹3.1 L+₹43,759 (16.4%)Rejected-Finance | L5 | Rejected-Finance Higher bid amount. Hence rejected. |
Tender Value
₹3.3 L
Closing Date
6 Jan 2021, 3:00 pmClosed
Registrar, for NITK
Post Srinivasnagar, mangaluru - 575025
Const. of Drain at rear side of Workshop building
2020_NITK_605291_1
Tender No. 19 of 2020-21/HD
Open Tender
Civil Works
Works
30 days
NITK Surathkal
As in Tender Document
9 documents required · 9 mandatory
₹0
Exempted
5 Feb 2021
23 Dec 2020
7 Jan 2021
28 Dec 2020
6 Jan 2021
28 Dec 2020
Amount
Clearing and grubbing land/ site: KSRRB M200-8 – Clearing and grubbing land including uprooting rank vegetation, grass, bush, shrubs, saplings and trees of girth up to 300mm, by manual means, in area of light jungle, removal of stumps, disposal of unserviceable materials, stacking serviceable materials, including transportation charges, loading and unloading, all lablour, HOM of T&P complete
Earthwork for foundation – In Hard soil: KSRB 2-2.2- Earthwork excavation for foundation of buildings, column pits, culverts, water supply, sanitary lines and electrical conduits either in pits or in trenches, in hard soil not exceeding 3.50 meters in depth, including dressing the bottom and sides of pit and trenches, stacking the excavated soil clear from edges of excavation with lead up to 50 meters after breaking of clods etc complete including cost of labours and HOM of equipment complete as per specifications - Specification No. KBS 2.1 (b)/2.3.5
Removal of soil or silt: Removal of soil / silt from drain beds/ culvert beds by manual means and disposal including transportation charges, loading and unloading, all lablour, HOM of T&P complete
Centering for side walls: KSRB 4-6.4 - Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for vertical surfaces such as walls of any thickness, including attached pilasters, buttresses plinths and string courses, water tank side walls including cost of all materials, labours complete as per specifications. – For concrete kerbs, retaining walls & drain walls - Specification No. KBS 4.6.2
Cement Concrete M10 mix (1:3:6): KSRB 4.1-7: Providing and laying in position plain cement concrete of mix 1:3:6 (Mix -M10)- with OPC cement at 220 kgs per cum/ with PPC cement, with 20mm and down size graded granite metal coarse aggregates at 0.69cum and fine aggregates at 0.56cum machine mixed, concrete laid in layers not exceeding 15 cms thick , well compacted, in foundation and plinth, including cost of all materials, labour, HOM of machinery, curing complete as per specifications - For Coping/ DPC/ Cill/ foundation/ drain walls - Specification No. 4.1, 4.2
umar anees
BHARATESH V KULAL
EKADANTHA CONSTRUCTION
Zaira Constructions
Puneeth constructions
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .