| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 LAccepted-AOC | L1 | Accepted-AOC Less than Estimate rate | |
| 2 | L2₹13.2 L+₹88,702.42 (7.18%)Rejected-Finance | L2 | Rejected-Finance Rejected Second Less than Estimate rate | |
| 3 | L3₹13.0 L+₹67,929.59 (5.50%)Rejected-Finance | L3 | Rejected-Finance Rejected Third Less than Estimate rate | |
| 4 | L4₹13.3 L+₹96,018.18 (7.77%)Rejected-Finance | L4 | Rejected-Finance Rejected Fourth Less than Estimate rate | |
| 5 | L5₹13.7 L+₹1.3 L (10.8%)Rejected-Finance | L5 | Rejected-Finance Rejected Fifth Less than Estimate rate |
| Sl No | Description | Qty | Unit | ARUMUGAA BUILDERS L4 | RADHAKRISHNAN MANOHARAN L5 | K KANNAN L1 | K.Balamurugan L2 | A.S.Baskaran L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Desilting Open Well | ||||||||
| 1.01 | Earth work open well excavation complying with relevant classes of T.N.D.S.S well sinking and with lead upto 10m in Sand or other loose soil, Wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil - Fourth depth of 2 metre ( P.W.D SOR 2025-26 ) Fourth Depth 6-8M | 25.07 | Cum | 8,019.89 ₹9,463.47 | 8,147.75 ₹9,614.35 | 7,578.66 ₹8,942.82 Lowest | 8,824.64 ₹10,413.08 | 8,273.1 ₹9,762.26 |
| 1.02 | Earth work open well excavation complying with relevant classes of T.N.D.S.S well sinking and with lead upto 10m in Sand or other loose soil, Wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil - Fourth depth of 2 metre ( P.W.D SOR 2025-26 ) Fifth Depth 8-10M | 45.58 | Cum | 20,134.05 ₹23,758.18 | 18,915.7 ₹22,320.53 | 17,224.68 ₹20,325.12 Lowest | 20,055.2 ₹23,665.14 | 18,232 ₹21,513.76 |
| 1.03 | Earth work open well excavation complying with relevant classes of T.N.D.S.S well sinking and with lead upto 10m in Sand or other loose soil, Wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil - Fourth depth of 2 metre ( P.W.D SOR 2025-26 ) Sixth Depth 10-12M | 45.58 | Cum | 25,687.06 ₹30,310.73 | 22,881.16 ₹26,999.77 | 20,670.53 ₹24,391.23 Lowest | 24,066.24 ₹28,398.16 | 22,790 ₹26,892.2 |
| 1.04 | Cement concrete in CM 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete. | 1.61 | Cum | 9,582.72 ₹11,307.61 | 8,372 ₹9,878.96 | 7,508.56 ₹8,860.1 Lowest | 9,821 ₹11,588.78 | 8,694 ₹10,258.92 |
| 1.05 | Supplying and erecting centering shuttering including necessary supports for plane Cement concrete including all cost and conveyance etc., complete | 437.15 | Sqm | 2,22,588.04 ₹2,62,653.89 Lowest | 4,41,521.5 ₹5,20,995.37 | 4,10,789.86 ₹4,84,732.03 | 4,19,664 ₹4,95,203.52 | 4,37,150 ₹5,15,837 |
| 1.06 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete. | 47.68 | Cum | 4,38,989.76 ₹5,18,007.92 | 4,25,305.6 ₹5,01,860.61 | 3,75,480 ₹4,43,066.4 Lowest | 3,81,440 ₹4,50,099.2 | 4,05,280 ₹4,78,230.4 |
| 1.07 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing | 2.31 | MT | 1,99,084.22 ₹2,34,919.38 | 2,04,812.01 ₹2,41,678.17 | 1,82,553.46 ₹2,15,413.08 Lowest | 1,96,712.1 ₹2,32,120.28 | 1,96,712.1 ₹2,32,120.28 |
| 1.08 | Supply and delivery of Mild Steel channel for Roof, Rafters, Purlins etc., including priming coat inculding all cost etc., complete. | 124.24 | Kg | 60,544.64 ₹71,442.67 | 5,963.52 ₹7,036.95 | 5,553.53 ₹6,553.17 Lowest | 13,045.2 ₹15,393.34 | 5,590.8 ₹6,597.14 |
| 1.09 | Labour charges for fixing of Mild Steel channel for Roof, Rafters, Purlins etc., including priming coat inculding all cost etc., complete. | 124.24 | Kg | 92,319.02 ₹1,08,936.44 | 7,081.68 ₹8,356.38 | 3,714.78 ₹4,383.44 | 12,424 ₹14,660.32 | 3,106 ₹3,665.08 Lowest |
Tender Value
₹14.5 L
EMD Value
₹14,540
Closing Date
15 Oct 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO (BP)
BDO Office, Sattur
Desilting Open well and alround side wall at chinnaodaipatti Village and Panchayat
2026_RDTN_709603_1
A2/2910/2026
Open Tender
Civil Works
Works
Sattur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹14,540
Yes
11 Nov 2026
1 Oct 2026
15 Oct 2026
1 Oct 2026
15 Oct 2026
1 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1Desilting Open Well | ||||||
| 1.01 | Earth work open well excavation complying with relevant classes of T.N.D.S.S well sinking and with lead upto 10m in Sand or other loose soil, Wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil - Fourth depth of 2 metre ( P.W.D SOR 2025-26 ) Fourth Depth 6-8M | 25.07 | Cum | - | - | 18% |
| - | Earth work open well excavation complying with relevant classes of T.N.D.S.S well sinking and with lead upto 10m in Sand or other loose soil, Wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil - Fourth depth of 2 metre ( P.W.D SOR 2025-26 ) Fifth Depth 8-10M | 45.58 | Cum | - | - | 18% |
| - | Earth work open well excavation complying with relevant classes of T.N.D.S.S well sinking and with lead upto 10m in Sand or other loose soil, Wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil - Fourth depth of 2 metre ( P.W.D SOR 2025-26 ) Sixth Depth 10-12M | 45.58 | Cum | - | - | 18% |
| - | Cement concrete in CM 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete. | 1.61 | Cum | - | - | 18% |
| - | Supplying and erecting centering shuttering including necessary supports for plane Cement concrete including all cost and conveyance etc., complete | 437.15 | Sqm | - | - | 18% |
| - | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete. | 47.68 | Cum | - | - | 18% |
| - | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing | 2.31 | MT | - | - | 18% |
| - | Supply and delivery of Mild Steel channel for Roof, Rafters, Purlins etc., including priming coat inculding all cost etc., complete. | 124.24 | Kg | - | - | 18% |
| - | Labour charges for fixing of Mild Steel channel for Roof, Rafters, Purlins etc., including priming coat inculding all cost etc., complete. | 124.24 | Kg | - | - | 18% |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_852658.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
eBidChinnaodaipatti.pdf
Tender Documents • 0.53 MB
BOQ_852658.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .