Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Finance | ₹5.7 L | L1 | Admitted-Finance |
| 2 | L2₹5.9 LAdmitted-Finance | ₹5.9 L | L2 | Admitted-Finance |
| 3 | L3₹6.9 LAdmitted-Finance | ₹6.9 L | L3 | Admitted-Finance |
| 4 | L4₹7.2 LAdmitted-Finance | ₹7.2 L | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Som Kumar L1 | SURINDER SINGH L2 | SUNIL GUPTA CONTRACTOR L4 | M/S SHARMA ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|
| 1.00Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50m lead. For thickness of tiles 10mm to 25mm For thickness of tile above 25mm & upto 40mm | |||||||
| 1.01 | For thickness of tiles10mm to 25mm | 1 | Sqm | 67 ₹67 | 80 ₹80 | 40 ₹40 Lowest | 90 ₹90 |
| 1.02 | For thickness of tiles above 25mm & up to 40mm | 1 | Sqm | 70 ₹70 | 85 ₹85 | 50 ₹50 Lowest | 100 ₹100 |
| 2.00Dismantling manually/mechanically including stacking of serviceable material & disposal of unserviceable material within 50m lead as per directions of engineer-in-charge | |||||||
| 2.01 | Water bound macadam | 1 | Sqm | 100 ₹100 Lowest | 110 ₹110 | 200 ₹200 | 120 ₹120 |
| 2.02 | Bituminous road | 1 | Sqm | 120 ₹120 Lowest | 130 ₹130 | 210 ₹210 | 150 ₹150 |
| 3.00 | Demolishing RCC work by mechanical means & stocking at designated location and disposed of dismantled material up to a lead of 50m stacking serviceable & unserviceable material separately including cutting cutting of reinforcement bars. | 1 | Cum | 2,300 ₹2,300 | 2,350 ₹2,350 | 530 ₹530 Lowest | 2,350 ₹2,350 |
| 4.00 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50m lead as per directions of Engineer-in-charge.1:3:6 or richer mix | 1 | Cum | 1,800 ₹1,800 | 1,860 ₹1,860 | 400 ₹400 Lowest | 1,840 ₹1,840 |
| 5.00 | Extra for cutting reinforcement bars manually/by mech means in RCC work (payment shall be made on the cross sectional area of RCC as per directions of Engineer-in-charge. | 1 | Sqm | 60 ₹60 Lowest | 70 ₹70 | 130 ₹130 | 80 ₹80 |
| 6.00 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material In cement mortar | 1 | Cum | 1,468 ₹1,468 | 1,478 ₹1,478 | 240 ₹240 Lowest | 1,500 ₹1,500 |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
26 Jun 2026, 4:30 pmClosed
Executive Engineer
Sewerage and Drainage Div. (West) Jammu
Construction / Up-gradation / repairs to UEED Complex Transport Nagar Yard No. 1 Narwal Jammu. (Stage Work). Contract No. SDJ/W/51/2026-27
2026_HAUDD_312687_1
E-NIT No 20 of 2026-27 Dated 16-06-2026
Open Tender
Civil Works
Item Rate
300 days
Jammu
Please refer tender documents
2 documents required · 2 mandatory
₹600
Executive Engineer SandD Div (West) Jammu
₹20,000
6 Jul 2026
16 Jun 2026
27 Jun 2026
16 Jun 2026
26 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50m lead. For thickness of tiles 10mm to 25mm For thickness of tile above 25mm & upto 40mm | |||||
| 1.01 | For thickness of tiles10mm to 25mm | - | Sqm | - | - |
| 1.02 | For thickness of tiles above 25mm & up to 40mm | - | Sqm | - | - |
| 2Dismantling manually/mechanically including stacking of serviceable material & disposal of unserviceable material within 50m lead as per directions of engineer-in-charge | |||||
| 2.01 | Water bound macadam | - | Sqm | - | - |
| 2.02 | Bituminous road | - | Sqm | - | - |
| 3Demolishing RCC work by mechanical means & stocking at designated location and disposed of dismantled material up to a lead of 50m stacking serviceable & unserviceable material separately including cutting cutting of reinforcement bars. | |||||
| 4Demolishing cement concrete manually/by mechanical means including disposal of material within 50m lead as per directions of Engineer-in-charge.1:3:6 or richer mix | |||||
| 5Extra for cutting reinforcement bars manually/by mech means in RCC work (payment shall be made on the cross sectional area of RCC as per directions of Engineer-in-charge. | |||||
| 6Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material In cement mortar | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_1011997.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].