Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAccepted-AOC | ₹3.3 Cr | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹3.3 Cr+₹1.4 L (0.41%)Rejected-Finance | ₹3.3 Cr+₹1.4 L (0.41%) | L2 | Rejected-Finance Other then Lowest Bidder |
Tender Value
₹3.4 Cr
EMD Value
₹3.4 L
Closing Date
5 Feb 2024, 2:00 pmClosed
Forest Engineer Tiruchirappalli Division
Office of the Forest Engineering Division Tirichirappalli, Chief Conservator of Forest Office Campus, Senthuram Street, JK Nagar, Trichy-620023
Improvement and Maintenance of forest road from Zero Point to Kothaiyar to a Length of Km 0/000 - 6/000 in Kanniyakumari District.
2024_TNFD_406671_1
TN.2612-2/2023-2024
Open Tender
Civil Works - Roads
Item Rate
150 days
Kanniyakumari
as per PQ Document
7 documents required · 7 mandatory
₹0
₹3.4 L
22 Feb 2024
10 Jan 2024
6 Feb 2024
10 Jan 2024
5 Feb 2024
22 Jan 2024
Amount
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material
Picking the existing bituminous road surface to a depth of 50mm to 150mm and disposal of scarified material with a lift upto 3m and lead upto 1000m as per Technical Specification Clause 301.4
Earth work excavation charges in all classes of soils such as sand silt or other loose soil, wet sand or silt not under water, light block cotton soil, sandy loam & ordinary soil & red earth hard stiff clays soil hard red earth, shale's, murrams, gravel stony earth and earth mixed with 50% fair sized boulders and hard gravelly soil except sand and hard rock requiring blasting including depositing on the bank with all leads and lifts including leveling and sectioning dressing the bed up to sill level and all other incidental charges, such as shoring, strutting, breaking forming protective bunds coffer dams ring bunds, bailing out water etc. to complete the work and subsequent removal and clearing the river bed of excavated material protective bunds and coffer dams after completion of work as per specification SS 20 B for Side Drain & surface cutting as per MoST 111, 112, 202, 301, 302, 303, 305 & 900
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using the cut earth for formation of embankment as per MoSRT&H Technical Specifications Nos. 111, 112, 202, 301, 302, 303, 305 and 900..
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Tech
Providing and laying Wet Mix Macadam Base Course of 100mm thickness as specified on the prepared sub-Base with graded stone aggregate and granular materials of quality size and grading placed in layers as specified including mixing in Base mix plant,spreading in nuiform layer in motor grader and compacting with Vibrating Roller of 80 to 100kN static weight and ffine dressing for required grade and cross slope as shown on the drawing,equipment safety measures, testing and incidentals necessary to complete the work as per Technical Specification Clause 406 and as directed by Engineer.
Providing and laying the Prime coat over the WMM surface using 7.00 kgs of Bitumen Emulsion for 10 sqm area including cost and conveyance of bituminiours binder including labour charges for preparing the surface and applying the required quanity of bituminious binder as prime coat by bituminious sprayer etc complete as per clause 503 of MOST Specification
Providing and laying of Tack coat over the WMM surface using 2.50 kgs of Bitumen Emulsion for 10 sqm area including cost and conveyance of bituminiours binder including labour charges for preparing the surface and applying the required quanity of bituminious binder as prime coat by bituminious sprayer etc complete as per clause 503 of MOST Specification
Providing and laying Bituminous Macadam of 50 mm thickness which work shall consist of construction, in a single course, of compacted crushed aggregates premixed with bituminous binder 60/70 grade at the rate of 3.5 % by weight of the total mix to serve as base/binder course, in accordance with the requirement of the specification and conformity with the drawing as directed by the Engineer.
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 50.30 kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne power roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, paver finisher, power rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP clause 507 of MORTH Rev-5.
Providing RCC M15 grade precast KM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete (as per MORTH &H specification No:804)
Providing RCC M15 grade precast HM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete (as per MORTH &H specification No:804)
Providing and erecting direction and place identfication retro-reflectorised sign as per IRC:67 made of high intensity grade sheet vide clause 801.3 fixed over aluminum sheeting, 200 mm thick with area not exceeding 0.90 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with means of M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801
Providing and fixing of Retro Reflectorised Cautionary , Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5mm thick Aluminium Sheet fixed on back support Frame of 25mm x 25mm x 3mm Mild steel angle Iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M15 Grade cement concrete 45cm x 45cm x 60cm below Ground level etc complete including 7 Years warrenty for the Retro Reflective Sheeting as per Clause 6.9 of IRC 67 - 2012 Specification ( as per MORTH & Speccification no : 801 )
90 cm High Octagan
90cm Equilateral Triangle Cautionary Sign Board
Construction of CC Pavement
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for base course belo
2.Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Construction of Culvert
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ).
Below sill Level
Above Sill level
Deck slab sides,Bedblock,Dirt wall etc.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing Weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slope of 1(V): 2(H) towards drawing face complete as per drawing and technical specification.
Providing and fixing 20 mm thick compressible fibre board in expanson joint complete as per drawing and technical specifications
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
PAS AND Co
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .