| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 CrAccepted-AOC | ₹10.4 Cr | L1 | Accepted-AOC BOND |
| 2 | L2₹10.5 CrRejected-Finance HAJI CHAURAHA SHAMA VIHAR COLONY CHILLAWAN KANPUR ROAD SAROJINI NAGAR LUCKNOW UTTAR PRADESH | LUCKNOW | UTTAR PRADESH | 226001 | ₹10.5 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹10.6 CrRejected-Finance FLAT NO 2 621 A 5 W BLOCK JUHI COLONY BARRA 2 KANPUR NAGAR | KANPUR NAGAR | UTTAR PRADESH | 208001 | ₹10.6 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹11.0 CrRejected-Finance | ₹11.0 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹11.0 CrRejected-Finance | ₹11.0 Cr | L5 | Rejected-Finance L5 |
Tender Value
₹14.9 Cr
EMD Value
₹29.9 L
Closing Date
16 Dec 2023, 12:00 pmClosed
Superintending Engineer
Pratapgarh Circle, PWD, Pratapgarh
Widening and Strengthening of Kishanpur Marg to Gadhakot Marg (ODR) Ch. 0.000 to 9.600) Km At Distt. Fatehpur
2023_CEALD_869327_1
3520/95C/etendering/P.F.C/2023 Dt 06.12.2023
Open Tender
Civil Works
365 days
FATEHPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹29.9 L
Yes
Pratapgarh Circle, PWD, Pratapgarh
6 Mar 2024
9 Dec 2023
16 Dec 2023
9 Dec 2023
16 Dec 2023
9 Dec 2023
11 Dec 2023
Construction of embankment/Earthen shoulder with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 30 m
Scarifying the existing granular road surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres.
Construction of granular sub-base by providing coarse graded material, grade-1 spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing, laying, spreading and compacting graded stone aggregate to Stablizedwet mix macadam specification including premixing the Material with water at OMC .1.00% cement by wt and 3.5% Emulsion in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder V.G. 30 @ 4.50 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.
Tack Coat (Over D.B.M. Surface) Providing and applying tack coat with bitumen VG10 using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binderVG30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . 600 mm dia
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . 350 mm dia
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
A B ASSOCIATES
ANUSHREE INFRA PROJECTS PVT LTD
Shri Jai Prakash Pandey Contractor
M/s S S Associates, Alld
SRS EXPRESS PRIVATE LIMITED
M/S KANISHKA CONSTRUCTION
M/s Raj Laxmi Enterprises
M/s Prabhakar Singh
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid