| 1 | L1₹7.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.4 L+₹1,182.12 (0.16%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹7.5 L
EMD Value
₹8,000
Closing Date
8 Jan 2024, 3:00 pmClosed
Block Development Officer (VP), Eriyur Block
Block Development Officer (VP), Eriyur Block
CONSTRUCTION OF 10000 LITERS OHT TANK 9.00M STAGGING HEIGHT WITH PIPELINE AT PUDHUR H/O NAGAMARAI.
2024_RDTN_405318_1
RocNo2801/2023/E2 Dated.20.12.2023 JJM(MVS) P04
Open Tender
Civil Works
Item Wise
Block Development Officer (VP), Eriyur Block
Can be seen in the tender documents
2 documents required · 2 mandatory
₹0
₹8,000
Yes
Block Development Officer (VP), Eriyur Block
3 Apr 2024
3 Jan 2024
8 Jan 2024
3 Jan 2024
8 Jan 2024
3 Jan 2024
3 Jan 2024
Amount
CONSTRUCTION OF 10000 LITERS OHT TANK 9.00M STAGGING HEIGHT WITH PIPELINE AT PUDHUR H/O NAGAMARAI.
Earth work excavation below G.L and depositing on bank with an initial lead of 10m and lift of 2m for the following classification of soil In hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete below 1.50m from GL
RCC 1:1 1/2:3 using 20mm HBG metal excluding cost of reinforcement, and centering, but including cost of mixing, laying, finishing, curing etc.including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Column footing below 1.50 m from GL
Coloumn below GL upto 1.50m
Column above 4.50m
Column above 4.50m upto 7.32m
Column above 7.32m upto 10.98m
Braces at GL
Braces at 2.60m from GL
Braces at 6.00m from GL
Floor beam at 9.0m from GL. Floor slab from 9.00m to 10.98m above G.L, side wall from 9.15m to 10.98m above G.L, Haunch from 9.15m to 10.98m above G.L
Side wall from 10.98 m to 14.64m above GL, Roof slab at 11.60m above G.L. deduct for manhole
Supplying and erecting centering shuttering including necessary supports for RCC works including strutting and shuttertting charges etc. complete for the following
Column footing (plane surface)
Square Column:
Colum 0 to 3.3m ht. above G.L and below GL
Colum above 3.3m to 4.3 ht from GL
Column above 4.30m upto 5.30m
Column above 5.30m upto 6.30m
Column above 6.30m upto 7.30m
Column above 7.30m upto 8.30m
Column above 8.30m upto 9.30m
Plain Surface
Brace at Ground Level
Brace at 2.60m above Ground Level
Brace at 6.00m above Ground Level
Floor beam sides from 8.75m to 9.30 m above GL - inside outside bottom
Floor slab and working platform at 9.00m above G.L. Deduct for floor beam portion
Roof alab at 0-3. 30m above floor slab Deduct for manhole Add for manhole sides
Floor slab upto 3.30m above plateform
Supplying, fabricating placing in position of steel rods cutting tying etc. complete including cost of reinforcement RTS rods
Exterior Emulsion painting two coats over new Cement plastered surface using Exterior emulsion paint including with priming one coat cost and conveyance of paint and all labour charges etc complete.
Supply and Fixing of GI pipes for OHT connections including civil works
50 mm GI Pipe
50 mm GI Union
50 mm GI Elbow
50 mm GM Gatevalve
Supply, delivery and fixing in position of MS ladder outside the Service reservoir
Supplying and Fixing of CI manhole cover with frame of size 0.60m X 0.60m
Providing RCC ladder inside the tank
Providing Inline Cholorination
Provison for Pipe line (Sub Estimate)
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply of HDPE Pipes including cost and conveyance of all materials to site and all labour charges etc., completed.
Labour charges for laying and joining HDPE Pipes including all labour charges for laying pipes in proper alingment and gradient including cost of solvent cement etc., complete.
Refilling with excavated earth after laying of pipes including all labour charges Solvent cement etc., complete.
Providing Plat from Arrangements sub estimate
Cement concrete 1:4:8 (one cement four sand and eight jelly) using 40.m.m H.B.G.Jelly for foundation including watering where ever necessary and laid in layers not more than 15 c.m. thick compacting etc. complete complying with standard specification.
Brik Work in CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charge etc., complete
Plastering with cement 1:5 - 12mm thic including cost and conveyance of all materials to site and all labour charges etc., complete.
Provision for Soak pit arrangements
Providing Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S.Senthilkumar
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .