Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-AOC | ₹1.2 Cr | 1 | Accepted-AOC ok |
| 2 | 2₹1.2 Cr+₹4.5 L (3.76%)Rejected-AOC 611 VPO JUAN SONIPAT HARYANA 131024 | SONIPAT | SONIPAT | HARYANA | 131024 | ₹1.2 Cr+₹4.5 L (3.76%) | 2 | Rejected-AOC ok |
| 3 | 3₹1.3 Cr+₹6.2 L (5.19%)Rejected-AOC NA VILLAGE SUDKAIN KALAN DISTT JIND 125116 | SUDKAIN KALAN | JIND | HARYANA | 125116 | ₹1.3 Cr+₹6.2 L (5.19%) | 3 | Rejected-AOC ok |
| 4 | 4₹1.3 Cr+₹9.4 L (7.85%)Rejected-AOC 1849 JUGRAJPUR SACHENDI KANPUR KANPUR NAGAR UTTAR PRADESH 208023 UDYAM UP 43 0012110 | KANPUR NAGAR | UTTAR PRADESH | 208023 | ₹1.3 Cr+₹9.4 L (7.85%) | 4 | Rejected-AOC ok |
| 5 | 5₹1.3 Cr+₹13.2 L (11.0%)Rejected-AOC KADMA CHARKHI DADRI HARYANA | KADMA | CHARKHI DADRI | HARYANA | ₹1.3 Cr+₹13.2 L (11.0%) | 5 | Rejected-AOC ok |
| Sl No | Description | Qty | Unit | AJAYPAL SINGH CONTRACTOR L1 | Rajiv Tihal Contractor Baliyali L6 | THE NATRAJ COOP L AND C SCOIETY LTD L8 | JOGINDER SINGH CONTRACTOR L2 | The Jagrati Co.op. L&C Society Ltd. L7 | Yogi Construction co L3 | M/s Balaji Construction Co. L4 | Shree Salasar Associates L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Credit of old steel recovered from dismentaling RCC work | 2,988 | Kg. | 30 ₹-89,640 Lowest | 30 ₹-89,640 Lowest | 30 ₹-89,640 Lowest | 30 ₹-89,640 Lowest | 30 ₹-89,640 Lowest | 30 ₹-89,640 Lowest | 59 ₹-1,76,292 | 32.5 ₹-97,110 |
| 2.00 | CREDIT RATE OF BRICKS RECOVERED FROM DISMENTALING EXISTING STRUCTURE | 579.24 | cum | 880 ₹-5,09,732.96 Lowest | 880 ₹-5,09,732.96 Lowest | 880 ₹-5,09,732.96 Lowest | 880 ₹-5,09,732.96 Lowest | 880 ₹-5,09,732.96 Lowest | 1,200 ₹-6,95,090.4 | 1,725 ₹-9,99,192.45 | 955 ₹-5,53,176.11 |
| 3.00 | Credit for RS Joists used in diversion | 50,984.46 | Kg. | 104 ₹-53,02,383.84 Lowest | 104 ₹-53,02,383.84 Lowest | 104 ₹-53,02,383.84 Lowest | 104 ₹-53,02,383.84 Lowest | 200.7 ₹-1,02,32,581.12 | 124 ₹-63,22,073.04 | 110 ₹-56,08,290.6 | 105 ₹-53,53,368.3 |
| 4.00 | Suppling and Laying of Wooden Sleeper (size 10`x1`x0.5`) as per satisfaction of Engineer-in-charge. | 31.27 | cum | 12,000 ₹3,75,252 | 10,000 ₹3,12,710 Lowest | 12,500 ₹3,90,887.5 | 12,000 ₹3,75,252 | 12,000 ₹3,75,252 | 15,000 ₹4,69,065 | 12,000 ₹3,75,252 | 11,100 ₹3,47,108.1 |
| 5.00 | credit of wooden sleeper used in diversion | 31.27 | cum | 9,600 ₹-3,00,201.6 Lowest | 9,600 ₹-3,00,201.6 Lowest | 9,600 ₹-3,00,201.6 Lowest | 9,600 ₹-3,00,201.6 Lowest | 9,600 ₹-3,00,201.6 Lowest | 15,000 ₹-4,69,065 | 10,000 ₹-3,12,710 | 10,180 ₹-3,18,338.78 |
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
23 Oct 2025, 6:00 pmClosed
SATYENDER KUMAR
L.W.S. Divn. Ch-Dadri
Reconstruction of VR Bridge at RD 32935 Loharu feeder
2025_HRY_476120_1
202513152A5E E462 43C1 BAF3 6A24D6BF8772134IRR
Open Tender
Civil Works
Works
120 days
Charkhi Dadri
2 documents required · 2 mandatory
₹15,000
₹3.4 L
Yes
4 Dec 2025
4 Oct 2025
24 Oct 2025
4 Oct 2025
23 Oct 2025
4 Oct 2025
4 Oct 2025 - 6 Oct 2025
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_554051.xls
BOQ • 0.34 MB
OT0136872.pdf
Other Document • 1.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .