| 1 | L1₹39.1 LAccepted-AOC | ₹39.1 L | L1 | Accepted-AOC Work Order Issued on 08-04-2020 |
Tender Value
₹43.2 L
EMD Value
₹86,436
Closing Date
12 Sept 2019, 11:00 amClosed
EE PWD Yanam
EE PWD Yanam
Construction of Foot bridge across the creek at causeway, Ferry road in Francethippa, Yanam
2019_PWDC2_5054_2
30/EEY/2019-20
Open Tender
Civil Works
Item Rate
90 days
Yanam
Please refer Tender documents.
2 documents required · 2 mandatory
₹525
EE PWD Yanam
₹86,436
9 Apr 2020
5 Sept 2019
12 Sept 2019
5 Sept 2019
12 Sept 2019
5 Sept 2019
Amount
15.2.1 Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead - 1:3:6 or richer mix.
15.23.2 Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50m lead - For thickness of tiles above 25mm and upto 40mm.
11.51 Providing and laying 22mm thick factory made pre polished cement concrete flooring tiles of required colour and design over 20 mm thick cement mortar 1:4 ( 1 cement : 4 sand) and jointed with cement slurry mixed with an admixture of pigment to match the shade of the tile - (Endura \ Ultra \ Dazzle \ Technic).
12.1.6 Earth work in excavation for foundation of structures as per drawings and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material - Backfilling in Marshy Foundation Pits including the cost of labour, hire charge for tractor and overhead charges.
2.26.1 Extra for every additional lift of 1.5m or part thereof in -All kinds of soil.
2.27 Supplying and filling in plinth with sand under floors including, watering, ramming consolidating and dressing complete.
12.3 Sand filling in foundation trenches as per drawing and technical specification including the cost of labour, material and overhead charges.
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.- All work upto plinth level -1:4:8 (1 cement: 4coarse sand : 8 graded stone aggregate 40mm nominal size).
4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.- All work upto plinth level -1:2:4 (1 cement: 2coarse sand : 4 graded stone aggregate 20mm nominal size).
5.2.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters , buttresses, plinth and string courses , fillets, columns , pillars, piers, abutments, posts and struts etc.upto floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5coarse sand : 3 graded stone aggregate 20mm nominal size).
5.1.2 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering,finishing and reinforcement -All work upto plinth level : 1:1.5:3 (1 cement : 1 .5 coarse sand : 3 graded stone aggregate 20mm nominal size).
5.22.6 Reinforcement for R.C.C work including straightening , cutting , bending , placing in position and binding all complete Thermo -Mechanically treated bars (TISCON / VIZAG /IISCO /SAIL / JSW) including placing the M30 grade Athees make cover block @ 60cm centre to centre.
5.9.1 Centring and shuttering including strutting, propping etc.and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete. - Using steel sheet with M.S.frames.
5.9.6 Centring and shuttering including strutting, propping etc. and removal of form for: columns, pillars, piers, abutments, posts and struts.- Using steel sheet with M.S.frames.
5.9.5 Centring and shuttering including strutting, propping etc. and removal of form for: lintels, beams, plinth beams, girders, bressumers and cantilevers.- Using steel sheet with M.S.frames.
5.9.3 Centring and shuttering including strutting, propping etc. and removal of form for: suspended floors, roofs, landings, balconies and access platform - Using steel sheet with M.S.frames.
13.16.1 6mm cement plaster of mix 1:3 (1 cement: 3 fine sand).
11.3.1 Cement concrete flooring 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. 40mm thick with 20mm nominal size stone aggregate.
13.52.2 Finishing with epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer specifications including appropriate priming coat, preparation of surface, etc. complete -On concrete work.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .