| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 LAdmitted-Finance | ₹14.9 L | L1 | Admitted-Finance |
| 2 | L2₹14.9 LAdmitted-Finance | ₹14.9 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KARTHIK P L1 | K ELAIYARAJA L2 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF DRAMA STAGE BUILDING (VIZHA MEDAI) AT GOVT HIGHER SECONDARY SCHOOL CAMPUS IN EDAMELAIYUR WEST PANCHAYAT | |||||
| 2.00 | Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete | 44.89 | CUM | 263 ₹11,806.07 | 263.78 ₹11,841.08 |
| 3.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 8.84 | CUM | 2,425 ₹21,437 | 2,425.01 ₹21,437.09 |
| 4.00 | Refiiling of Carted Earth Including cost and Conveyance | 15.48 | CUM | 168 ₹2,600.64 | 168.15 ₹2,602.96 |
| 5.00 | Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete | 6.62 | CUM | 6,230 ₹41,242.60 | 6,230.55 ₹41,246.24 |
| 6.00 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. A) Below Basement | 9.7 | CUM | 6,252 ₹60,644.40 | 6,252.97 ₹60,653.81 |
| 7.00 | . B) Above Basement | 16.62 | CUM | 6,345 ₹1.1 L | 6,345.84 ₹1.1 L |
| 8.00 | Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete I) Below Basement | 49.55 | Sqm | 547 ₹27,103.85 | 547.5 ₹27,128.63 |
| 9.00 | RCC SLABS, | 149.7 | Sqm | 1,095 ₹1.6 L | 1,095 ₹1.6 L |
| 10.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works | 1.77 | MT | 91,895 ₹1.6 L | 91,895.3 ₹1.6 L |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
20 Feb 2026, 3:00 pmClosed
BLOCK DEVELPOMENT OFFICER (B.PT)
BLOCK DEVELPOMENT OFFICER NEEDAMANGALAM
MPLADP 2025-26 CONSTRUCTION OF DRAMA STAGE AT GOVT.HIGHER SECONDARY SCHOOL IN EDAMELAIYUR WESTPANCHAYAT
2026_RDTN_656951_1
33/2025/A2
Open Tender
Civil Works
NEEDAMANGALAM
MPLADP 2025-26 CONSTRUCTION OF DRAMA STAGE AT GOVT.HIGHER SECONDARY SCHOOL IN EDAMELAIYUR WESTPANCHAYAT
3 documents required · 3 mandatory
₹0
₹15,000
20 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
CONSTRUCTION OF DRAMA STAGE BUILDING (VIZHA MEDAI) AT GOVT HIGHER SECONDARY SCHOOL CAMPUS IN EDAMELAIYUR WEST PANCHAYAT
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Refiiling of Carted Earth Including cost and Conveyance
Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. A) Below Basement
. B) Above Basement
Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete I) Below Basement
RCC SLABS,
Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. I) upto Basement
.II) superstructure Ground level
Weathering course concrete (Brick jelly lime concrete) using 20mm Broken brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing, laying, and finishing etc., complete
Finishing the top of the roof with one course of Machine Pressed Tiles of size 23x23x2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar,red oxide, etc., complete complying with standard specification
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and th.en sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc.,complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work. (Based on SoR 2024-25)
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Providing Granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
Fabrication and supply of mild Steel Doors and Windows of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
i. Steel Door D1
Jolly
Window
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete.
Distemberinn two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Exterior Emulsion two coats with best approved Plastic Emulsion including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats over new iron works using ready mixed enamel paint including cost and all labour charges etc complete.
Supplying and fixing P.V.C rainwater down fall pipe of 100mm dia with necessary shoes, bends,& clamps etc.,
Provision for Light Point/Fan Point (SD 24)
Provision for Ceiling Fan (SD 112)
Provision for Tube Light
Provision for CFL Bulb
Provision for Service Wire
Provision for Service pipe (SD 69)
Provision for EB deposit
Provision for shelf aregements Charges
Provision for Rain Water Harvesting Arrangements Charges
Provision for Name Borad Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
EDATECH.pdf
Additional Documents • 1.14 MB
EDAPRICE.pdf
Tender Documents • 1.44 MB
BOQ_787803.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid