Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.9 LAccepted-AOC | ₹16.9 L | 1 | Accepted-AOC AOC |
| 2 | 2₹6.4 LAccepted-AOC | ₹6.4 L | 2 | Accepted-AOC AOC |
| 3 | 3₹25.1 LRejected-Finance BASANT VIHAR EXTENTION NEAR STATE BANK COLONY DELHI ROAD SAHARANPUR BASANT VIHAR EXTENTION UTTAR PRADESH 247001 UDYAM UP 64 0004874 | SAHARANPUR | UTTAR PRADESH | 247001 | ₹25.1 L | 3 | Rejected-Finance HIGHEST RATES |
| Sl No | Description | Qty | Unit | Vaishali Enterprises L2 | CMOS COMMUNICATION SYSTEM L3 | Shikha Electronics Service L1 |
|---|---|---|---|---|---|---|
| 1.00Purchase and Commissioning of Solar Power System of 15 KW at the top roof of Administrative Block for connecting electrification of Centre Block of J.V. Jain College, Saharanpur | ||||||
| 1.01 | Solar Panel Plate - UTL/Luminous/Seemac/TATA | 15,000 | /watt | 9,30,000 ₹9,76,500 | 9,30,000 ₹9,76,500 | 9,00,000 ₹9,45,000 |
| 1.02 | Inverter cum UPS 15KW - UTL/Luminous/Seemac/TATA | 1 | Nos | 2,25,000 ₹2,36,250 | 2,25,000 ₹2,36,250 | 2,20,000 ₹2,31,000 |
| 1.03 | Solar Battery 200/150AH - UTL/Luminous/Exide | 20 | Nos | 2,90,000 ₹3,04,500 | 3,00,000 ₹3,15,000 | 2,84,000 ₹2,98,200 |
| 1.04 | DCDB - UTL/Luminous/Seemac/TATA and earthing of solar system | 1 | Job | 41,000 ₹48,380 | 45,000 ₹53,100 | 40,000 ₹47,200 |
| 1.05 | Cable for Solar 6-8mm or 10mm including 3 core cable for input power to the Office lying vacant near Accountant Office i.e. place of Establishment of Ups and batteries | 1 | Nos | 98,000 ₹1,15,640 | 1,02,000 ₹1,20,360 | 1,00,000 ₹1,18,000 |
| 1.06 | Civil Work - Angle Iron Frame work for fixing of Solar Plates at the roof of top of Adm. Block including drilling, welding, labour with all tools and plants | 1 | LS | 1,02,000 ₹1,20,360 | 1,10,000 ₹1,29,800 | 1,00,000 ₹1,18,000 |
| 1.07 | Arrangement for washing of all solar panels mounted on roof of Adm. Block and Central Library (Compressor Pump - 1HP) | 1 | LS | 55,000 ₹64,900 | 65,000 ₹76,700 | 60,000 ₹70,800 |
| 1.08 | After Installation with one year free service cover | 1 | LS | 50,000 ₹59,000 | 60,000 ₹70,800 | 45,000 ₹53,100 |
| 1.09 | Electrification work for supply of Solar Power for providing solar power to Lecture Room No. 9-15 and connected offices and departments i.e. DSW, Proctorial Board, Commerce, Maths, Pol.Sc., Kalangan Hall, Sociology, History, Geology and Chemistry Dept. with laboratories from Main Switch including all electrical gadgets (Separate MCB should be installed at each office/department & Main MCB at Main Switch), wires and other accessories inter-alia electrification including wires and changeover for connecting the surrounding LED lights of centre block with solar panel | 1 | LS | 3,00,000 ₹3,54,000 | 3,50,000 ₹4,13,000 | 3,10,000 ₹3,65,800 |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
27 Jan 2026, 11:30 amClosed
PRINCIPAL
J V JAIN COLLEGE PRADUMAN NAGAR SAHARANPUR
Purchase and Commissioning of Solar Power System of 15 KW at the top roof of Administrative Block for connecting electrification of Centre Block of JV Jain College Saharanpur
2026_JVJCS_1106975_1
E.O./SolarPower/07/2025-26
Open Tender
Electronics Equipment
SAHARANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Principal
₹25,000
OFFICE OF THE PRINCIPAL
28 Jan 2026
17 Jan 2026
27 Jan 2026
17 Jan 2026
27 Jan 2026
20 Jan 2026
17 Jan 2026 - 27 Jan 2026
20 Jan 2026
Solar Panel Plate - UTL/Luminous/Seemac/TATA
Inverter cum UPS 15KW - UTL/Luminous/Seemac/TATA
Solar Battery 200/150AH - UTL/Luminous/Exide
DCDB - UTL/Luminous/Seemac/TATA and earthing of solar system
Cable for Solar 6-8mm or 10mm including 3 core cable for input power to the Office lying vacant near Accountant Office i.e. place of Establishment of Ups and batteries
Civil Work - Angle Iron Frame work for fixing of Solar Plates at the roof of top of Adm. Block including drilling, welding, labour with all tools and plants
Arrangement for washing of all solar panels mounted on roof of Adm. Block and Central Library (Compressor Pump - 1HP)
After Installation with one year free service cover
Electrification work for supply of Solar Power for providing solar power to Lecture Room No. 9-15 and connected offices and departments i.e. DSW, Proctorial Board, Commerce, Maths, Pol.Sc., Kalangan Hall, Sociology, History, Geology and Chemistry Dept. with laboratories from Main Switch including all electrical gadgets (Separate MCB should be installed at each office/department & Main MCB at Main Switch), wires and other accessories inter-alia electrification including wires and changeover for connecting the surrounding LED lights of centre block with solar panel
Work of Shifting of Online UPS of 15KW along with batteries and related complete accessories of solar Power System from Gallery of Teacher Education Dept. to the Office lying vacant near Accountant Office with new cable of 6 to 10 mm required for shifting and any other civil/electrification work like MCB, Main Switch etc. as per requirment of site/instructions of college electrician and estate officer. Site may be visited on pre-bid meeting
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
TECHNICAL.pdf
Tender Documents • 0.85 MB
BOQ_2042577.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid