Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹3.1 L+₹9,625 (3.20%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹3.2 L+₹15,625 (5.20%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ALOK KUMAR SINGH L2 | M/S SANTOSH KUMAR CONSTRUCTION L3 | ANCHAL CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00Loading, Unloading and safe cartage of the following materials (S.N. 1.01 to 1.06) from Electricity Store Centre, Gonda to the work site/dump site | ||||||
| 1.01 | 16 KVA T/F | 25 | No. | 2,510 ₹62,750 | 2,505 ₹62,625 | 2,500 ₹62,500 Lowest |
| 1.02 | AB cable | 200 | Mtr. | 15 ₹3,000 | 16 ₹3,200 | 10 ₹2,000 Lowest |
| 1.03 | Distribution Box | 25 | No. | 160 ₹4,000 | 165 ₹4,125 | 150 ₹3,750 Lowest |
| 1.04 | ACSR Weasel Conductor | 250 | Mtr. | 16 ₹4,000 | 17 ₹4,250 | 15 ₹3,750 Lowest |
| 1.05 | Earthing Complete | 25 | No. | 160 ₹4,000 | 165 ₹4,125 | 150 ₹3,750 Lowest |
| 1.06 | Other material | 375 | Kg. | 25 ₹9,375 | 26 ₹9,750 | 20 ₹7,500 Lowest |
| 2.00 | Connecting conductor from T/F to H.T. line | 250 | Mtr. | 55 ₹13,750 | 56 ₹14,000 | 50 ₹12,500 Lowest |
| 3.00 | Construction of 11/0.4 KV S/S for 16 KVA T/F with mounting and fitting of T/F on pole with proper fitting of all acessories and connecting with all circuit. | 25 | No. | 4,010 ₹1,00,250 | 4,020 ₹1,00,500 | 4,000 ₹1,00,000 Lowest |
| 4.00 | Laying, Stringing & Sagging of ABC Cable upto proper sag for the different size cable as per estimate/resspo norms | 200 | Mtr. | 60 ₹12,000 | 65 ₹13,000 | 50 ₹10,000 Lowest |
Tender Value
₹3.1 L
EMD Value
₹3,080
Closing Date
3 Sept 2026, 5:00 pmClosed
SE EDC GONDA
EDC GONDA
61/EDC(G)/2026-27
2026_MVVNL_1178033_1
NVS-61-62/EDC(G)/2026-27
Open Tender
Electrical Works
Item Rate
30 days
EDC GONDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
SE EDC GONDA
₹3,080
Yes
EDC GONDA
9 Sept 2026
18 Aug 2026
4 Sept 2026
18 Aug 2026
3 Sept 2026
18 Aug 2026
22 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Loading, Unloading and safe cartage of the following materials (S.N. 1.01 to 1.06) from Electricity Store Centre, Gonda to the work site/dump site | |||||
| 1.01 | 16 KVA T/F | 25 | No. | 100 | ₹2,500 |
| 1.02 | AB cable | 200 | Mtr. | 100 | ₹20,000 |
| 1.03 | Distribution Box | 25 | No. | 100 | ₹2,500 |
| 1.04 | ACSR Weasel Conductor | 250 | Mtr. | 100 | ₹25,000 |
| 1.05 | Earthing Complete | 25 | No. | 100 | ₹2,500 |
| 1.06 | Other material | 375 | Kg. | 100 | ₹37,500 |
| 2 | Connecting conductor from T/F to H.T. line | 250 | Mtr. | 100 | ₹25,000 |
| 3 | Construction of 11/0.4 KV S/S for 16 KVA T/F with mounting and fitting of T/F on pole with proper fitting of all acessories and connecting with all circuit. | 25 | No. | 100 | ₹2,500 |
| 4 | Laying, Stringing & Sagging of ABC Cable upto proper sag for the different size cable as per estimate/resspo norms | 200 | Mtr. | 100 | ₹20,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_2213560.xls
BOQ • 0.24 MB
61.pdf
Tender Documents • 1.25 MB
TN6162.pdf
PDF • 0.22 MB
Dtextension6162.pdf
PDF • 0.26 MB
Dtextension6162.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .