| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.2 CrAccepted-AOC 5 9 35 HAZARHAT KALITALALANE HOWRAH 711104 | HOWRAH | HOWRAH | WEST BENGAL | 711104 | ₹1.2 Cr | L-1 | Accepted-AOC L1 |
| 2 | L2₹1.3 Cr+₹4.8 L (3.88%)Rejected-Finance | ₹1.3 Cr+₹4.8 L (3.88%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.4 Cr+₹11.5 L (9.28%)Rejected-Finance BABUDIH BEHIND POLYTECHNIC DHANBAD 828130 | DHANBAD | JHARKHAND | 828130 | ₹1.4 Cr+₹11.5 L (9.28%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.4 Cr+₹13.1 L (10.6%)Rejected-Finance | ₹1.4 Cr+₹13.1 L (10.6%) | L4 | Rejected-Finance L4 |
| 5 | L-5₹1.4 Cr+₹14.2 L (11.5%)Rejected-Finance DURGACHAK DURGACHAK DURGACHAK HALDIA EAST MEDINIPUR WEST BENGAL 721602 | MEDINIPUR EAST | WEST BENGAL | 721602 | ₹1.4 Cr+₹14.2 L (11.5%) | L-5 | Rejected-Finance L5 |
Tender Value
₹1.6 Cr
Closing Date
21 Aug 2023, 2:00 pmClosed
GM(Contract cell)
Regional Contract Cell, Eastern Regional Office, 9th Floor, Central Wing, Indian Oil Bhavan, 2 Gariahat Road (South), Kolkata-700068
DEVELOPMENT OF NEW A SITE REGULAR RETAIL OUTLET AT KM MILESTONE 580 TO KM MILESTONE 595 ON NH 2 ON LHS WHILE GOING FROM PALSIT TOLL GATE TO BURDWAN
2023_ERO_169554_1
RCC/ERO/37/2023-24/LT-54
Limited
Civil Works
Works
112 days
DIST - PURBA BARDHAMAN, STATE - WEST BENGAL
As per NIT and Tender
6 documents required · 6 mandatory
Exempted
11 Dec 2023
8 Aug 2023
22 Aug 2023
8 Aug 2023
21 Aug 2023
16 Aug 2023
Indian Oil Corporation eProcurement portal Created By: SHASHI RANJAN KUMAR Created Date/Time: 12-Sep-2023 04:51 PM Tender Title: DEVELOPMENT OF NEW A SITE REGULAR RETAIL OUTLET AT KM MILESTONE 580 TO KM MILESTONE 595 ON NH 2 ON LHS WHILE GOING FROM PALSIT TOLL GATE TO BURDWAN Tender ID: 2023_ERO_169554_1
Tender Inviting Authority: General Manager (Contract Cell), IOCL, Eastern Region Office, Kolkata
Name of Work: DEVELOPMENT OF NEW `A` SITE REGULAR RETAIL OUTLET AT "KM MILESTONE 580 TO KM MILESTONE 595 ON NH 2 ON LHS WHILE GOING FROM PALSIT TOLL GATE TO BURDWAN.
Tender Ref. No: : RCC/ERO/37/2023-24/LT-54 || e-Tender ID: 2023_ERO_169554_1 Important Notes: 1. Party should quote by selecting EXCESS or LESS in the dropdown box and thereafter filling the percentage rate in figures only without any condition. In case party is intending to quote “at Par”, party must quote “0” in the space provided. Leaving the designated space for quoting percentage rate blank shall be taken as quoted “at Par”. The party in their own interest should tally the quoted rate in words and quoted amount (in figures) which is displayed at the bottom of price bid sheet and calculated as per % rate quoted by the party. Name of bidder must also be provided at appropriate place in price bid.Scanned/Photocopy of Price bid are not acceptable and such bids shall be summarily rejected. BOQ (Bill of Quantity) is to be submitted after making entries in white coloured cells, without changing any format. 2. Scanned/Photocopy of Price bid are not acceptable and such bids shall be summarily rejected. BOQ (Bill of Quantity) is to be submitted after making entries in white coloured cells, without changing any format 3. GST (As applicable, (Currently @ 18.0 %)) will be paid extra as per Govt. rule. 4. Bidders are advised not to use Information Rights Management (IRM) feature on BoQ and any other excel file submitted during bidding process. IOCL shall not be responsible for any consequential result due to same.
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 Tiwari Construction Co.(GSTN-09ABXPT8434B1Z1) 16293141.10 0.00 16293141.10 One Crore Sixty Two Lakh Ninty Three Thousand One Hundred and Fourty One
2.00 S. B. Engineering(GSTN-19AEHPJ0728F1ZN) 16293141.10 32.99 21668248.35 Two Crore Sixteen Lakh Sixty Eight Thousand Two Hundred and Fourty Eight
3.00 BLUE STAR FABRICATORS(GSTN-19ANPPM5918B1ZR) 16293141.10 -8.75 14867491.25 One Crore Fourty Eight Lakh Sixty Seven Thousand Four Hundred and Ninty One
4.00 JAGDAMBA CONSTRUCTION(GSTN-19BOTPS2696C1Z7) 16293141.10 -21.10 12855288.33 One Crore Twenty Eight Lakh Fifty Five Thousand Two Hundred and Eighty Eight
5.00 TECHNO PROJECTS(GSTN-19AABFT5412C1ZJ) 16293141.10 -15.33 13795402.57 One Crore Thirty Seven Lakh Ninty Five Thousand Four Hundred and Two
6.00 PROGRESSIVE SYNDICATE(GSTN-19AAQFP0197H1ZQ) 16293141.10 -15.99 13687867.84 One Crore Thirty Six Lakh Eighty Seven Thousand Eight Hundred and Sixty Seven
7.00 B.S.CONSTRUCTION CO.(GSTN-07AJAPA3973D1ZO) 16293141.10 45.10 23641347.74 Two Crore Thirty Six Lakh Fourty One Thousand Three Hundred and Fourty Seven
8.00 P R ENTERPRISE(GSTN-19ASUPS0861R2ZG) 16293141.10 5.99 17269100.25 One Crore Seventy Two Lakh Sixty Nine Thousand One Hundred
9.00 M/S RAJESH KUMAR(GSTN-10AAEFR4073L1ZA) 16293141.10 20.00 19551769.32 One Crore Ninty Five Lakh Fifty One Thousand Seven Hundred and Sixty Nine
10.00 Alka Construction Corporation(GSTN-20AQBPS9922L1ZL) 16293141.10 -17.00 13523307.11 One Crore Thirty Five Lakh Twenty Three Thousand Three Hundred and Seven
11.00 DAS ENTERPRISE(GSTN-19AGUPD7613G1Z4) 16293141.10 -15.19 13818212.97 One Crore Thirty Eight Lakh Eighteen Thousand Two Hundred and Tweleve
12.00 Mahabir Syndicate(GSTN-10ACTPD2491D1ZZ) 16293141.10 -13.27 14131041.28 One Crore Fourty One Lakh Thirty One Thousand Fourty One
13.00 S D CONSTRUCTION(GSTN-19ADTPD2368L1ZY) 16293141.10 -24.05 12374640.67 One Crore Twenty Three Lakh Seventy Four Thousand Six Hundred and Fourty
14.00 MADRA CONSTRUCTION(GSTN-19AEPPM5020H1ZD) 16293141.10 -13.10 14158739.62 One Crore Fourty One Lakh Fifty Eight Thousand Seven Hundred and Thirty Nine
15.00 Biswas And Sons(GSTN-NA) 16293141.10 -12.51 14254869.15 One Crore Fourty Two Lakh Fifty Four Thousand Eight Hundred and Sixty Nine
16.00 ANIL INFRACOM(GSTN-NA) 16293141.10 -6.99 15154250.54 One Crore Fifty One Lakh Fifty Four Thousand Two Hundred and Fifty
17.00 UNITRADE CONSTRUCTION(GSTN-NA) 16293141.10 -6.00 15315552.63 One Crore Fifty Three Lakh Fifteen Thousand Five Hundred and Fifty Two
18.00 SUBHRA ENTERPRISE(GSTN-NA) 16293141.10 -15.08 13836135.42 One Crore Thirty Eight Lakh Thirty Six Thousand One Hundred and Thirty Five
Lowest Amount Quoted BY: S D CONSTRUCTION(12374640.67)
BOQ Summary Details Tender Title: DEVELOPMENT OF NEW A SITE REGULAR RETAIL OUTLET AT KM MILESTONE 580 TO KM MILESTONE 595 ON NH 2 ON LHS WHILE GOING FROM PALSIT TOLL GATE TO BURDWAN Tender ID: 2023_ERO_169554_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 S D CONSTRUCTION 12374640.67 L1
2 JAGDAMBA CONSTRUCTION 12855288.33 L2
3 Alka Construction Corporation 13523307.11 L3
4 PROGRESSIVE SYNDICATE 13687867.84 L4
5 TECHNO PROJECTS 13795402.57 L5
6 DAS ENTERPRISE 13818212.97 L6
7 SUBHRA ENTERPRISE 13836135.42 L7
8 Mahabir Syndicate 14131041.28 L8
9 MADRA CONSTRUCTION 14158739.62 L9
10 Biswas And Sons 14254869.15 L10
11 BLUE STAR FABRICATORS 14867491.25 L11
12 ANIL INFRACOM 15154250.54 L12
13 UNITRADE CONSTRUCTION 15315552.63 L13
14 Tiwari Construction Co. 16293141.10 L14
15 P R ENTERPRISE 17269100.25 L15
16 M/S RAJESH KUMAR 19551769.32 L16
17 S. B. Engineering 21668248.35 L17
18 B.S.CONSTRUCTION CO. 23641347.74 L18
Preferential Bidder Non-Itemwise BOQ Summary Details Tender Title: DEVELOPMENT OF NEW A SITE REGULAR RETAIL OUTLET AT KM MILESTONE 580 TO KM MILESTONE 595 ON NH 2 ON LHS WHILE GOING FROM PALSIT TOLL GATE TO BURDWAN Tender ID: 2023_ERO_169554_1
Sheet Name Sl.No Bidder Name Amount Difference Amount from L1 Difference Percentage from L1 Tolerance Percentage Preference Category
BoQ1 1 S D CONSTRUCTION 12374640.67 20.00% PPP-MII Order 2017
2 JAGDAMBA CONSTRUCTION 12855288.33 480647.66 3.88% 20.00% PPP-MII Order 2017
3 Alka Construction Corporation 13523307.11 1148666.44 9.28% 20.00% PPP-MII Order 2017
4 PROGRESSIVE SYNDICATE 13687867.84 1313227.17 10.61% 20.00% PPP-MII Order 2017
5 TECHNO PROJECTS 13795402.57
6 DAS ENTERPRISE 13818212.97 1443572.30 11.67% 20.00% PPP-MII Order 2017
7 SUBHRA ENTERPRISE 13836135.42 1461494.75 11.81% 20.00% PPP-MII Order 2017
8 Mahabir Syndicate 14131041.28 1756400.61 14.19% 20.00% PPP-MII Order 2017
9 MADRA CONSTRUCTION 14158739.62 1784098.95 14.42% 20.00% PPP-MII Order 2017
10 Biswas And Sons 14254869.15 1880228.48 15.19% 20.00% PPP-MII Order 2017
11 BLUE STAR FABRICATORS 14867491.25 2492850.58 20.14% 20.00% PPP-MII Order 2017
12 ANIL INFRACOM 15154250.54
13 UNITRADE CONSTRUCTION 15315552.63 2940911.96 23.77% 20.00% PPP-MII Order 2017
14 Tiwari Construction Co. 16293141.10 3918500.43 31.67% 20.00% PPP-MII Order 2017
15 P R ENTERPRISE 17269100.25 4894459.58 39.55% 20.00% PPP-MII Order 2017
16 M/S RAJESH KUMAR 19551769.32 7177128.65 58.00% 20.00% PPP-MII Order 2017
17 S. B. Engineering 21668248.35 9293607.68 75.10% 20.00% PPP-MII Order 2017
18 B.S.CONSTRUCTION CO. 23641347.74 11266707.07 91.05% 20.00% PPP-MII Order 2017
stage.html
html • 0.09 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .