| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16,800.23Admitted-Finance | -2.92% | ₹16,800.23 | L1 | Admitted-Finance |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
23 Apr 2026, 6:55 pmClosed
Commissioner, Municipal Corporation Udaipur
Municipal Corporation Udaipur, Town Hall Link Road
Patch and Jhiri work In ward 26,27 and 74 to 80 in MCU Area (ARC) (e_03 / Nirman_01)
2026_DLB_551705_1
E_03_2026-27_Nirman_01
Open Tender
Civil Works
365 days
Udaipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Commissioner, Municipal Corporation Udaipur
₹30,000
Yes
29 Apr 2026
14 Apr 2026
24 Apr 2026
14 Apr 2026
23 Apr 2026
14 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross
sections, including disposal of surplus material with all lift and lead
upto 1000 metre as per MoRT&H specification clause 301. In all type of soil | 1 | cum | 235.5 | ₹235.5 |
| 2 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Earth upto 3km | 1 | cum | 209.35 | ₹209.35 |
| 3 | Providing, laying, spreading (with paver finisher only) and compacting wet mix macadam (WMM) base course comprising of graded stone aggregate and granular material conforming to MORT&H specifications (Table 400-II) in layers of equal compacted thickness each consolidated, including pre-mixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tippers to site, laying in uniform layers in base course on a well prepared sub-base/ base course and compacting with power vibratory-roller to achieve the desired density complete as per
MoRT&H specification clause - 406 including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 1 | cum | 1,775 | ₹1,775 |
| 4 | Providing and laying bituminous macadam in 50/75 mm compacted thickness on prepared surface with specified graded crushed stone aggregates as per Table 500-4, Grading-II for base/ binding course, loading of aggregate with F.E. loader, heating and mixing of stone aggregate and bitumen in computerised hot mix plant, transported to site by tippers to paver, laid over a previously prepared surface with paver finisher fitted with electronic sensing device to the required grade, level and alignment and rolling with power roller and vibratory compactor as per clauses 501.6 and 501.7 to achieve the desired compaction complete as per clause 504 of MoRT&H specification and including all material, labour, machinery, lighting, guarding and maintenance of diversion but excluding cost of primer/ tack coat. With Bitumen VG-grade 30 @ 3.3% (percentage by weight of total
mix) | 1 | cum | 6,010 | ₹6,010 |
| 5 | Providing and laying 20mm thick Mix Seal Surfacing on a prepared surface in a single course composed of specified graded crushed agggregates as per table (500-19) premixed with bituminus binder (including cost of anti-stripping compound, wherever required) with lead of mixed material up to 1 Km. [MoRTH Specification: Clause 508 & 112) in a hot mix plant 40-60 TPH with Front end loader, laying with paver finisher transporting the mixed material up to lead of 20 km by tipper and rolling with power loller 8-10 tonne to achieve density approved by the department with all lead, but excluding cost of track coat. Type "A" (22 Kg. binder per 10 Sqm) bitumen VG 30 | 1 | sqm | 165 | ₹165 |
| 6 | Providing and applying primer coat over prepared surface of granular base with bitumen emulsion as per IS : 8887 and approved quality @ 0.6 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface including removing of
binding material and other foreign matter with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 1 | sqm | 33.7 | ₹33.7 |
| 7 | Providing and applying tack coat on the prepared surface with bitumen emulsion as per IS: 8887 and approved quality @ 0.2 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 1 | sqm | 12 | ₹12 |
| 8 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 1 | cum | 2,955 | ₹2,955 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 1 | cum | 5,910 | ₹5,910 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.81 MB
BOQ_983255.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid