Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹1.8 LAccepted-AOC 113 F BLOCK HOUSE NUMBER 113 F BLOCK PANKI KANPUR NAGAR UTTAR PRADESH 208020 | KANPUR NAGAR | UTTAR PRADESH | 208020 | Ist | Accepted-AOC L1 | |
| 2 | IInd₹1.9 LRejected-AOC | IInd | Rejected-AOC L3 | |
| 3 | IIIrd₹1.9 LRejected-AOC | IIIrd | Rejected-AOC L3 |
Tender Value
₹1.9 L
EMD Value
₹2,000
Closing Date
11 Jul 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle-II, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj
39/ETC-II(P)/ 2022-2023
2022_UPTCL_712368_1
39/ETC-II(P)/ 2022-2023
Open Tender
Electrical Works
Item Rate
365 days
Manjhanpur, Kaushmabi
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE,ETD-NAINI,PRAYAGRAJ
₹2,000
6 Oct 2022
4 Jul 2022
12 Jul 2022
4 Jul 2022
11 Jul 2022
4 Jul 2022
120 days
Amount
The cutting of grass bushes, kusa, kasa etc above 2cm from just above the ground level collection of foreign material i.e kankar blast, waste papers, polythene bags etc and cutting of grass waste throwing outside the premises of 132 KV S/S Manjhanpur. The above working area inside switchyard except concrete plinth/road etc and its covered 03 times in a year as given below:-
First Grass cutting
Second Grass cutting
Third Grass cutting
Uprooting of small trees inside the switchyard of 132 KV S/S Manjhanpur by digging and taking out the complete root and garbage etc. than throwing it outside the periphery of premises and leveling the ground. Three times in a year. The all cost of man material and T&P required for completion of the job:-
First Uprooting
Second Uprooting
Third Uprooting
Spraying glycel chemical over new grown grass after grass cutting it will covered 2 times in year as given as below:-
First Spraying of glycel after Ist grass cuutiing.
Second Spraying of glycel after IIIrd grass cuutiing.
M/S OM SHANTI ENTERPRISES
D. P. Construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .