Tender Value
₹16.0 L
EMD Value
₹32,020
Closing Date
22 Oct 2026, 12:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer
MDGC Muzaffarnagar
Laying Cement Concrete Road Above Main Canal VRB Deoband Branch VRB and PDBFC VRB at km 34.630
2026_UPIDC_1198095_8
TN-08/EE/2026-27
Open Tender
Civil Works
Item Wise
30 days
as per tender notice
as per tender notice
2 documents required · 2 mandatory
₹854
₹32,020
17 Oct 2026
17 Oct 2026
22 Oct 2026
17 Oct 2026
22 Oct 2026
17 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Eartthwork in clearance of internal section of canal in all type of soil with all lift & lead the earth from clearance to be disposed in strengthening of canal banks with its proper compaction ramming & dressing complete i/c all cost of labour T&P etc as per directed by engineer in charge | 400 | Cum | - | - |
| 2 | Centreing and shuttering for PCC work for including cost of material T&P etc complete. | 84.6 | Sqm | - | - |
| 3 | Placing steel Reinforcement and Angle Plate 50mmx50mmx3mm for Rcc Work including cost of material, cutting, bending, binding, welding etc Complete | 3.32 | MT | - | - |
| 4 | Providing and Laying RCC (M-20) 1:1.5:3 with crushed stone ballast and coarse sand with cost of material including T&P labour etc asd per directed by engineer in charge. | 198.17 | Cum | - | - |
| 5 | 1st class brick work in 1:4 cement coarse sand mortar inclduing all cost of material & labour etc all completion of work (per cum) | 7.29 | Cum | - | - |
| 6 | Earthwork in back filling including lead upto 1.00 km and lift upto 1.50m also i/c lavelling ramming dressing labour T&P etc complete. | 96 | Cum | - | - |
| 7 | Cement Plaster in (1:2 CM) cement, coarse sand including all cost of material labour T&P etc complete. | 54 | Sqm | - | - |
| 8 | Supplying/Fixing 10 mm thick thermocol sheet in expension joints i/c cost of all labour material T&P etc required for proper completion of work | 375 | Cum | - | - |
| 9 | Supplying/Fixing 10 mm wide expention joints with bituminous fillar after removalof thermocol sheet i/c cost of all labour material T&P etc required for proper completion of work | 375 | RM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.30 MB
Tendernotice_2.pdf
PDF • 2.17 MB
BOQ_2263813.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .