Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.4 LAccepted-AOC GOA | ₹9.4 L | 1 | Accepted-AOC Being lowest bidder |
| 2 | 2₹12.2 L+₹2.8 L (29.4%)Rejected-Finance | ₹12.2 L+₹2.8 L (29.4%) | 2 | Rejected-Finance Being 2nd lowest bidder. |
Tender Value
₹11.8 L
EMD Value
₹23,528
Closing Date
10 Feb 2026, 3:00 pmClosed
Executive Engineer
WD VI DDW Margao Goa
Urgent Shifting/Strengthening of 300mm dia AC pipeline by providing MS supports near culvert at Kakoda in CCMC in Curchorem Constituency.
2026_DDW_27556_1
DDW/WD-VI/TN/2025-26/06 line 02
Open Tender
Civil Works - Water Works
Percentage
45 days
WD VI DDW Margao Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹23,528
1 Sept 2026
3 Feb 2026
11 Feb 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches, drain not exceeding 1.5m in width 10 sq.m on plan including dressing of sides ramming of bottoms for all lead and lift including setting out the excavated soil & disposal of surplus soil with all lead including providing barricading danger lighting guarding as directed by departmental officer in all types strata comprising any of the materials such as soil, silt sand clay gravel moorum of all conglomerated laterite rock, soft rock fissured shattered decomposed rock or weathered rock and all such other materials as described under Appendix A to these specification either in full or in parts as the case may be adopting any approved method of methods as may be convenient or permitted inclusive of chiselling, wedging etc, blasting prohibited in all conglomerates as directed by the Engineer-in-charge etc, complete. | 207.9 | Cu.m | 291 | ₹60,498.9 |
| 2 | Hiring of Cranes - 5 MT capacity | 7 | Per Day | 8,824 | ₹61,768 |
| 3 | pump for pumping water continously | 16 | Shift | 400 | ₹6,400 |
| 4 | HIRE CHARGES OF JCB Excavator | 8 | Per Day | 13,240 | ₹1,05,920 |
| 5Manufacturing and supplying at the site of work ER welded MS pipes including procurement of plates, gas cutting to required size, rolling, tack welding, assembling in suitable length to form pipe, welding on automatic machine and forming v edge on both ends of pipes, including hydraulic pressure test conforming to IS : 3589- 2001 grade Fe 410 in double random length of 10 to 12.2 metres in bevelled ends including ,freight loading & unloading mechanical crane & stacking at site etc. complete. | |||||
| 5.01 | Size in ( OD ) in MM for 10mm thickness | - | - | - | - |
| 5.011 | 323.9 mm | 18 | Metre | 9,800 | ₹1,76,400 |
| 6 | Welding by gas plant (using Ador or ES4B or Deh Secheron make electrodes only) | 565.2 | cm | 16 | ₹9,043.2 |
| 7Welding in all position with minimum 3 Nos. of runs for MS pipes and specials and flanges, internally and externally including gauging wherever necessary, fixing appurtances and other accessories, cost of water pumping arrangement and hydraulic testing etc. complete for 12mm/10mm thick M.S.plate. | |||||
| 7.01 | 300 mm dia | 6 | Each | 8,131 | ₹48,786 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
Tendernotice_2.pdf
PDF • 1.06 MB
Tendernotice_3.pdf
PDF • 0.63 MB
Tendernotice_4.pdf
PDF • 0.68 MB
BOQ_28002.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .