Corrective electrical maintenance contract and overhauling etc. of 2 x 3.5 MLD ETP of Circular Railway near KOAA Station for 03 (Three) years.
ELEG-OT-1317-2026-27-R
ELEG-OT-1317-2026-27-R
Open
36 Months
Unknown (Unspecified Location)
₹0
₹2.9 L
2 Jul 2026
2 Jul 2026
13 Jul 2026
1A-Non Schedule - ( Submersible sewage pumping set [MBH Pumps(Gujrat) Pvt.Ltd.] 3 Nos , Above/
Rewinding of motor with suitable insulated copper wire of similar size & gauge.
Replacement of motor bearing with similar new one.
Replacement of Oil Seal.
Replacement of pump bearing with similar new one.
Replacement of 'O' ring.
Welding, cutting, polishing, machining of impeller if required.
Welding, cutting, polishing, machining of shaft if required.
Replacement of thermostat.
Replacement of moisture sensor.
Replacement of nuts, bolts and washers.
Cleaning, overhauling, testing, fitting and painting of the pumping set
Lifting, lowering & commissioning of pumps. Unit
1B-1A-Non Schedule - (Submersible sewage pumping set [MBH Pumps(Gujrat) Pvt.Ltd.] 2 Above/
Rewinding of motor with suitable insulated copper wire of similar size & gauge.
Replacement of motor bearing with similar new one.
Replacement of Oil Seal.
Replacement of pump bearing with similar new one.
Replacement of 'O' ring.
Welding, cutting, polishing, machining of impeller if required.
Welding, cutting, polishing, machining of shaft if required.
Replacement of thermostat.
Replacement of moisture sensor.
Replacement of nuts,bolts and washers.
Cleaning, overhauling, testing, fitting and painting of the pumping set
Lifting, lowering & commissioning of pumps. Unit
1C-Non Schedule - (Submersible sewage pumping set [MBH Pumps(Gujrat) Pvt.Ltd.] 3 Nos , Above/
Rewinding of motor with suitable insulated copper wire of similar size & gauge.
Replacement of motor bearing with similar new one.
Replacement of Oil Seal.
Replacement of pump bearing with similar new one.
Replacement of 'O' ring.
Welding, cutting, polishing, machining of impeller if required.
Welding, cutting, polishing, machining of shaft if required.
Replacement of thermostat.
Replacement of moisture sensor.
Replacement of nuts,bolts and washers.
Cleaning, overhauling, testing, fitting and painting of the pumping set
Lifting,lowering & commissioning of pumps. Unit
2A-Non Schedule - (H S pump (Mather & Platt Pumps Ltd.) 3 Nos, Motor Make: ABB, Above/
Replacement of ball/ roller bearing with similar new one.
Replacement of sleeve bush.
Replacement of guide bush.
Replacement of Neck ring.
Replacement of water seal.
Replacement of coupling bolts & bush.
Replacement of check nut.
Painting, overhauling, servicing once in a year.
Lifting, lowering and commissioning of pump if required. Unit Above/
2B-Non Schedule - (Motor Capacity 20 HP)
Rewinding of motor with similar gauge of wire including heat varnishing etc. if required.
Replacement of motor bearing by similar new one.
Blowing, painting etc. once in a year. Unit
2C-Non Schedule - (Air Blower (Air Vac Industries & Project), 3 Nos, Mototr Make: ABB, Above/
Rewinding of motor with similar gauge of wire including heat varnishing etc.
Replacement of bearing by similar new one.
Blowing, painting etc. once in a year. Unit Above/
2D-Non Schedule - (H.S. Motor, 2 Nos, Motor Make: ABB, 3HP, Clarifaculator)
Rewinding of motor with similar gauge of wire including heat varnishing etc, if required.
Replacement of bearing by similar new one. Unit
2E-Non Schedule - (Replacement of starter contact, coil, Over Head Relay timer, preventor Above/
FASD Starter 3HP-2 nos
FASD Starter 10HP-3 nos
FASD Starter 12.5HP- 2 nos
FASD Starter 15HP-5 nos
FASD Starter 20HP-3nos
FASD Starter 40HP-3nos Unit
3F-Non Schedule - (Manning for operation & maintenance at ETP/KOAA- for three years)
Total man hours for Highly Skilled Staff (3 nos + 1 no Rest keeper) for 3 years [( 8 hrs per day x 3 nos 1 Highly-skilled x 7 days)= 168 man hours + (8 hrs per day x 1 no Rest keeper x 3 days)= 24 man hours; Total man hours for 7 days= 192, Hence Man hour for 1 day= 27.43. Total man hours for 1 year(365 days)= 10011.95 man hours. Hence Total man hours for 3 years= 30035.85]
Total man hours for Unskilled Staff (3 nos + 1 no Rest keeper) for 3 years [( 8 hrs per day x 3 nos un-skilled x 2 7 days)= 168 man hours + (8 hrs per day x 1 no Rest keeper x 3 days)= 24 man hours; Total man hours for 7 days= 192, Hence Man hour for 1 day= 27.43. Total man hours for 1 year(365 days)= 10011.95 man hours. Hence Total man hours for 3 years= 30035.85] Unit
3A1-Non Schedule - (Regular maintenance works for 03 years) (H.S Pump (Mathe & Platt
"Bi-monthly checking as per schedule below: a)Checking all nuts & Bolts, b)Replacement of Packing, c)Checking of abnormal sound." Unit
3A2-Non Schedule - (Air Blower (Air Vac Industries & Project), 3 Nos, Motor Make: ABB, Above/
Bi-monthly checking as per schedule below: a) Tightness of nuts & Bolts, b) Tightness of coupling bolts, c) Greasing/ oiling of bearing etc. Unit Above/
3B1-Non Schedule - (Motor)
Bi-monthly checking as per schedule below: a) Tightness of nuts & Bolts, b) Tightness of coupling bolts, c) Greasing/ oiling of bearing etc. Unit
3B2-Non Schedule - (Air Blower (Air Vac Industries & Project), 3 Nos, Motor Make: ABB, Above/
Bi-monthly checking, servicing, cleaning & tightening etc. Unit
3C1-Non Schedule - (H.s Motor, 2 Nos, Motor Make: ABB, Motor Load: 3HP, Capacity: 3HP, Above/
Bi-monthly checking as per schedule below: a) Tightness of nuts & Bolts, b) Tightness of coupling bolts, c) Greasing/ oiling of bearing etc. Unit
3C2-Non Schedule - (FASD Starter, 3HP=2nos, 10HP=3Nos, 12.5HP=2nos, Above/
Bi-monthly checking, cleaning, tightening etc of the above starter, 40HP/40A, 3Phase.
Bi-monthly checking, cleaning, tightening etc of the above starter, 20HP/15HP/12.5HP /10HP/ 3HP, 3 Phase. Unit
3E1-Non Schedule - (Submersible De-watering pumping set, 2 nos, Load: 10HP,415V, Above/
Rewinding of motor with suitable insulated copper wire of similar size & gauge.
Replacement of motor bearing with similar new one.
Replacement of Oil Seal.
Replacement of pump bearing with similar new one.
Replacement of 'O' ring.
Welding, cutting, polishing, machining of impeller if required.
Welding,cutting,polishing,machining of shaft if required.
Replacement of thermostat.
Replacement of moisture sensor.
Replacement of nuts,bolts and washers.
Cleaning,overhauling,testing,fitting and painting of the pumping set
Lifting,lowering & commissioning of pumps.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
FormatofGuaranteeBond.pdf
ATTACHMENT
2022_CE-I_CT_GCC-2022Policy14_07_20221.pdf
ATTACHMENT
GCC-April-2022.pdf
ATTACHMENT
LTHTElectricalBooklet.pdf
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_111.pdf Correction
ATTACHMENT
OpenTenderDocument.pdf
ATTACHMENT
Advance
ATTACHMENT
2025_01_09IIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_9ACS-9.pdf
ATTACHMENT
2026_03_13IndianRailwaysStandardGeneralConditionsofContractApril2022AdvanceCorrectionSlipNo_111.pdf
ATTACHMENT
Download all tender documents and submit your bid