Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 LAccepted-AOC | ₹2.5 L | 1 | Accepted-AOC Below Estimate |
| 2 | 2₹2.5 LRejected-AOC | ₹2.5 L | 2 | Rejected-AOC Above Estimate |
| Sl No | Description | Qty | Unit | JR CONSTRUCTION L1 | K RAMACHANDRAN L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on Bank within initial lead of 10mt and initial lift of 2mt in hard stiff clay, stiff black cotton hard red earth shales murrams gravel stoney earth and earth mixed with small size boulders and hard gravelly soil except rock etc., complete complying with standard specification. As per SS 20 B TNDSS No 23 & 24 VI (S2), VII 9,10 | 5.5 | m3 | 1,897.5 ₹1,897.50 | 1,925 ₹1,925 |
| 2.00 | PCC 1:4:8 mix using 40mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing laying and curing etc., complete complying with standard specification. | 1 | m3 | 7,939 ₹7,939 | 7,940 ₹7,940 |
| 3.00Supplying and erecting of centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10 stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over (silver oak joists) of size 10cm x 6.50 cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc., complete complying with standard specification | |||||
| 3.01 | a) Below 1.00 m Hieght | 6 | m2 | 4,002 ₹4,002 | 4,020 ₹4,020 |
| 3.02 | b) Above 1.00 m Hieght | 17.5 | m2 | 23,362.5 ₹23,362.50 | 23,450 ₹23,450 |
| 4.00 | PCC 1:3:6 mix using 40mm metal including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing laying and curing etc., complete complying with standard specification. | 23.5 | m3 | 2,04,638 ₹2.0 L | 2,04,685 ₹2.0 L |
| 5.00 | Plastering in 1:5 mix to 12mm thick including cost and conveyance of all materials to work site and labour charges for mixing, laying, consolidating and curing etc., complete | 21 | M2 | 8,253 ₹8,253 | 8,295 ₹8,295 |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
16 Dec 2025, 3:00 pmClosed
EXECUTIVE OFFICER
HULICAL TOWN PANCHAYAT
Construction of Retaining wall at 10th ward Kilbharathinagar Jokin house to Ethurthammal house (GF 25-26)
2025_DTP_632184_1
65/2025-3
Open Tender
Civil Works
180 days
HULICAL TOWN PANCHAYAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,000
8 Mar 2026
15 Dec 2025
16 Dec 2025
15 Dec 2025
16 Dec 2025
15 Dec 2025
15 Dec 2025 - 16 Dec 2025
Earth work excavation and depositing on Bank within initial lead of 10mt and initial lift of 2mt in hard stiff clay, stiff black cotton hard red earth shales murrams gravel stoney earth and earth mixed with small size boulders and hard gravelly soil except rock etc., complete complying with standard specification. As per SS 20 B TNDSS No 23 & 24 VI (S2), VII 9,10
PCC 1:4:8 mix using 40mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing laying and curing etc., complete complying with standard specification.
a) Below 1.00 m Hieght
b) Above 1.00 m Hieght
PCC 1:3:6 mix using 40mm metal including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing laying and curing etc., complete complying with standard specification.
Plastering in 1:5 mix to 12mm thick including cost and conveyance of all materials to work site and labour charges for mixing, laying, consolidating and curing etc., complete
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_756381.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid