| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.8 LAccepted-AOC | ₹43.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹47.2 LRejected-Finance MADARSA ROAD SONPURWA DISTRICT GARHWA | ₹47.2 L | L2 | Rejected-Finance Above Rate |
| 3 | Rejected-Technical RANKI MUHALLA GARHWA JHARKHAND | GARHWA | GARHWA | JHARKHAND | - | - | Rejected-Technical Not Attached as Per T and C Clause No- 14 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Attached as Per T and C Clause No- 14 |
| 5 | Rejected-Technical PANKI ROAD DALTONGANJ PALAMAU | - | - | Rejected-Technical Not Attached as Per T and C Clause No- 14 |
Tender Value
₹52.4 L
EMD Value
₹1.1 L
Closing Date
23 Mar 2026, 5:00 pmClosed
Executive Officer
Garhwa Nagar Parishad
Construction of Urban Ayushman Arogya Mandir and Policlinics Sahijana Under Nagar Parishad Garhwa
2026_UDD_111561_1
GNP-02/2025-26
Open Tender
Civil Works
Works
Garhwa
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.1 L
17 Aug 2026
13 Mar 2026
25 Mar 2026
13 Mar 2026
23 Mar 2026
13 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, leveling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/l. | 0.4 | Cum | - | - |
| 2 | Earth filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation frenches within a lead of 50 M. and lift of 1.5 M all complete as per building specification and direction of E/l (Mode of measurement compacted volume). | - | Cum | - | - |
| 3 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including' cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/l (Mode of measurement compacted volume). | 1 | Cum | 1 | ₹1 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size) | - | Cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | - | Cum. | 3,751.64 | - |
| 6 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size). | - | Sqm | - | - |
| 7 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | - | Cum | 351.75 | - |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size | 1 | Cum | 5,218 | ₹5,212.78 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 1 | Cum | 1 | ₹1 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 1 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.95 MB
BOQ_150629.xls
BOQ • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].