Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.1 LAccepted-AOC | ₹21.1 L | L1 | Accepted-AOC AOC |
| 2 | L2₹21.1 L+₹2,117.40 (0.10%)Rejected-Finance | ₹21.1 L+₹2,117.40 (0.10%) | L2 | Rejected-Finance Highest Bidder |
| 3 | L3₹21.1 L+₹5,293.49 (0.25%)Rejected-Finance | ₹21.1 L+₹5,293.49 (0.25%) | L3 | Rejected-Finance Highest Bidder |
Tender Value
Refer Docs
EMD Value
₹43,000
Closing Date
7 Aug 2026, 12:00 pmClosed
Executive Engineer
Vikas bhawan Civil Line Firozabad
Ward No. 20, Mohalla Sudama Nagar Construction of a marriage hall (Barat Ghar) at a public site in front of Amar Singh house.
2026_REDUP_1173838_8
377/ee/tender/dt.08.07.2026
Open Tender
Civil Works
Percentage
90 days
Ward No. 20, Mohalla Sudama Nagar Construction of
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹43,000
21 Sept 2026
1 Aug 2026
7 Aug 2026
1 Aug 2026
7 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E.W. in excavation in foundation in ordinary soil & filling back into Trenches. SI No.251 | 68.89 | cum | 142.5 | ₹9,816.83 |
| 2 | Providing & laying in cement concetre 1:4:8 (40mm gauge aggregate nominal size) brick ballast in all complite of work S.I.No. 4.1.8 275 (a) | 23.64 | cum | 4,512.5 | ₹1,06,675.5 |
| 3 | M 150 Class B W in 1:6 cement, Corse sand of 1.25 F M mortar upto plinth i/c of all matareal labour etc compleeteas per S I No.6.1.2 (303) | 49.68 | cum | 5,035 | ₹2,50,138.8 |
| 4 | Earth work in cutting or in embankment in ordinary soil, xcavation to be in the form of regular pits not exceeding 1/2 M (20") depth & earth work in embankment to be in 20 cm layers including ramming & dressing the surface to required levels & solpes & also including 1.50 M (5ft) lift & 30 M (100ft) lead all complete i/c cartage upto 8km. SI No. 231(a)+253 | 482 | cum | 311.6 | ₹1,50,191.2 |
| 5 | RCC plinth beam in 1:1.5:3 cement concetre in all complete of work S.I. No. 5.1.2 | 1.79 | cum | 8,170 | ₹14,624.3 |
| 6 | M150 class B/W in 1:6 C/S mortor in Super structure in all complete of work S.I. No 6.1 + 6.8 (a) 305 | 50.5 | cum | 5,462.5 | ₹2,75,856.25 |
| 7 | MS or Iron work in heavey size such as in built up gates door frames including hold fasts hinges wt of welding etc. As per SI No . 503 | 850 | kg | 66.5 | ₹56,525 |
| 8 | R.C.C. work 1:1.5:3 cement C/S mortor (20mm gauge agregate nominal size) stone grit in all complete of work. S.I. No 5.1.2 | 6.72 | cum | 8,170 | ₹54,902.4 |
| 9 | R.C.C. work 1:1.5:3 cement C/S mortor (20mm gauge agregate nominal size) stone grit in all complete of work. S.I. No 5.3 | 14.21 | cum | 8,455 | ₹1,20,145.55 |
| 10 | R.C.C. work 1:1.5:3 cement C/S mortor (20mm gauge agregate nominal size) stone grit in all complete of work. S.I. No 5.1.2 | 18.44 | cum | 8,170 | ₹1,50,654.8 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_2205042.xls
BOQ • 0.41 MB
T1_8.pdf
Tender Documents • 1.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .