| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.1 CrAccepted-AOC 368 MAHESHPUR SECTOR 21 PANCHKULA HR 134112 | PANCHKULA | PANCHKULA | HARYANA | 134112 | ₹6.1 Cr | 1 | Accepted-AOC Being lowest and overall reasonable bid. |
| 2 | 2₹6.1 Cr+₹3.5 L (0.57%)Rejected-Finance | ₹6.1 Cr+₹3.5 L (0.57%) | 2 | Rejected-Finance Being other than lowest bidder. |
| 3 | 3₹6.9 Cr+₹79.1 L (13.0%)Rejected-Finance | ₹6.9 Cr+₹79.1 L (13.0%) | 3 | Rejected-Finance Being other than lowest bidder. |
| 4 | Rejected-Technical | - | - | Rejected-Technical Four class below the eligible class. |
| 5 | Rejected-Technical PAYYOOR KOTTARATHI HOUSE POST AMAYUR KOPPAM PALAKKAD KERALA 679303 | PALAKKAD | KERALA | 679303 | - | - | Rejected-Technical Not enlisted in appropriate category c (vi) and also one class below the eligible class. |
Tender Value
₹7.1 Cr
EMD Value
₹6.8 L
Closing Date
25 Oct 2021, 6:00 pmClosed
HQ CHIEF ENGINEER AF NAGPUR
HQ CHIEF ENGINEER AF, VAYUSENA NAGAR, NAGPUR 440007
PROVISION OF FIRE DETECTION, FIRE ALARM AND FIRE EXTINGUISHING SYSTEM AT AF STATION CHANDIGARH
2021_MES_412507_1
CE_AF_NGP_800145A
Open Tender
Miscellaneous Works
Item Rate
365 days
GE AF MC CHANDIGARH
For MES Enlisted Contractors - Class A, Category c (vi) For other contractors Meeting Enlistment Criteria of MES for Class A, Category c (vi)
9 documents required · 9 mandatory
₹3,000
GE AF MC CHANDIGARH
₹6.8 L
Yes
HQ CHIEF ENGINEER AF NAGPUR
14 Jan 2022
20 Aug 2021
1 Nov 2021
20 Aug 2021
25 Oct 2021
11 Oct 2021
23 Aug 2021 - 30 Aug 2021
7 Sept 2021
Amount
Design, supply, installation, testing and commissioning of CO2 gas flooding (local) extinguishing system for oil, power & fuel filter room at GF and First Floor, TV Test Cell-3 & TV Test Cell-2 as per the details given in the drawing attached in accordance with NFPA-12/ IS-15528 and other relevant IS standards referred in IS15528 for pipes and other equipments and testing complete all as specified and as directed.
Design, supply, installation, testing and commissioning of CO2 gas flooding (local) extinguishing system for TV-3 AE, TV-2 TEST BEDS as per the details given in the drawing attached in accordance with NFPA-12/ IS-15528 and other relevant IS standards referred in IS15528 for pipes and other equipments and testing complete all as specified and as directed.
Design, supply, installation, testing and commissioning of CO2 gas flooding (local) extinguishing system for TV-3 AE, TV-2 POWER ROOM AT 1ST FLOOR as per the details given in the drawing attached in accordance with NFPA-12/ IS-15528 and other relevant IS standards referred in IS15528 for pipes and other equipments and testing complete all as specified and as directed.
Design, supply, installation, testing and commissioning of CO2 gas flooding (local) extinguishing system for OIL, POWER & FUEL FILTER ROOM FOR AI-20 AE Cell No.1, AI-20 AE Cell No.2 as per the details given in the drawing attached in accordance with NFPA-12/ IS-15528 and other relevant IS standards referred in IS15528 for pipes and other equipments and testing complete all as specified and as directed.
Design, supply, installation, testing and commissioning of CO2 gas flooding (local) extinguishing system for TEST BEDS OF AI-20 AE Cell No.1, AI-20 AE Cell No.2 as per the details given in the drawing attached in accordance with NFPA-12/ IS-15528 and other relevant IS standards referred in IS15528 for pipes and other equipments and testing complete all as specified and as directed.
Design, supply, installation, testing and commissioning of CO2 gas flooding (local) extinguishing system for AI-20 AE Cell No.1, AI-20 AE Cell No.2 AT 1ST FLOOR as per the details given in the drawing attached in accordance with NFPA-12/ IS-15528 and other relevant IS standards referred in IS15528 for pipes and other equipments and testing complete all as specified and as directed.
Design, supply, installation, testing and commissioning of CO2 gas flooding (local) extinguishing system for VR-8 BEDS as per the details given in the drawing attached in accordance with NFPA-12/ IS-15528 and other relevant IS standards referred in IS15528 for pipes and other equipments and testing complete all as specified and as directed.
Design, supply, installation, testing and commissioning of CO2 gas flooding (local) extinguishing system for OIL,FILTER & POWER ROOM VR8 as per the details given in the drawing attached in accordance with NFPA-12/ IS-15528 and other relevant IS standards referred in IS15528 for pipes and other equipments and testing complete all as specified and as directed.
Design, supply, installation, testing and commissioning of CO2 gas flooding (local) extinguishing system for VR-14A BED as per the details given in the drawing attached in accordance with NFPA-12/ IS-15528 and other relevant IS standards referred in IS15528 for pipes and other equipments and testing complete all as specified and as directed.
Design, supply, installation, testing and commissioning of CO2 gas flooding (local) extinguishing system for OIL,FILTER & POWER ROOM VR14 A as per the details given in the drawing attached in accordance with NFPA-12/ IS-15528 and other relevant IS standards referred in IS15528 for pipes and other equipments and testing complete all as specified and as directed.
Design, supply, installation, testing and commissioning of CO2 gas flooding (local) extinguishing system for APU AND CONTROL CABIN as per the details given in the drawing attached in accordance with NFPA-12/ IS-15528 and other relevant IS standards referred in IS15528 for pipes and other equipments and testing complete all as specified and as directed.
NOTES FOR SERIAL ITEM NOS 1 to 11 ABOVE :- (i) The contractor shall submit working detail comprising of quantity of CO2 gas, piping layout, nozzles along with sizes and quantities, complete accessories and safety devices, specifications of all equipment along with makes to GE during execution of work along with drawings showing precise layout and locations of all the above equipment for vetting by CFEES and for further approval by GE before execution. (ii) Design of CO2 flooding system alongwith gas calculation and drawing design of fire suppression system with the HFC 227ea shall be vetted by QCI registered TAC (Test, Audit and Consultancy) in Mechanical Enineering branch with 5 years experience in design of gas flooding system and have designed minimum 3 Nos gas flooding installation for future vetting of CFEES and approval of GE. The extraction and filling of CO2 for quality and purity of HFC 227ea shall be vetted through TAC. Name of TAC: M/s EFFISENSE CONSULTING, S & T WONTEL or any other QCI registered TAC meeting the requirment given above.
(iii) The supply and installation shall be carried out by the agencies possessing authorization from OEM alongwith undertaking by the OEM that after sales service and spare parts support shall be made available to the Government for minimum period of 7 years after its installation. (iv) The fire extenguishing system shall be integrated with fire alarm and signaling system. Fire extinguising system for electrical panels and controls of equipments shall be with clean agent HFC 227ea. Therefore fire alarm system shall be designed separately for areas to be covered under CO2 flooding system and other areas shown in drawings. Location and type of detectors shall be clearly marked on the drawings along with CO2 flooding system and clean agent HFC 227ea system. All rooms shall be provided with portable fire extinguishers which shall be measured and paid separately. (v) The rate quoted by the bidder shall be deemed to include complete system except cost of following items which shall be measured and paid for separately as per actual quantities as per approved design and marked on fresh drawings submitted by the contractor during execution of work.
(a) 68 Ltr. water capacity brand new seamless cylinder with CCOE Approval and filled with 45 Kg. CO2 Gas fitted with Valve assembly:Valve CO2 / Ø12mm / 25E EN-629-1 / B. Disc 250 Bar / Diff.pressure / VdS / LPCB/ UL/ FM &CCOE Approved, Master valve with VDS/LPCB/ UL/ FM approved 24 V DC Solenoid and VDS/LPCB/ UL/ FM approved Pneumatic-Manual release device with Lever (b) 68 Ltr. water capacity brand new seamless cylinder with CCOE Approval and filled with 45 Kg. CO2 Gas fitted with Valve assembly:Valve CO2 / Ø12mm / 25E EN-629-1 / B. Disc 250 Bar / Diff.pressure / VdS / LPCB/ UL/ FM &CCOE Approved, Slave valve with VDS/LPCB/ UL/ FM approved Pneumatic Actuator (c) Online digital weight Monitoring with Normal Indication - Analogue LED type (d) CO2 Cylinder bank assembly suitable to fix 9 x 45 Kg. CO2 gas cylinders in Cabinet Type Enclosure with seamless sch 80 manifold (header) matching flange & online monitoring fixing assembly fully intigrated pressure switch, safety valve, non return valve, SS braided discharge hose, terminal boxes, non ferrous fastners and other required accessories.
(e) Online Monitor Control Panel (f) CO2 dischare nozzle VDS Approved (g) Non-Electric Blocking Device G1/4" - DN6 / BKH / PN=10bar / VdS (h) 40 NB Manual Lock-out Valves with supervisory limit switch (j) Safety Sign Board - Vacate Immediately (k) Safety Sign Board - Do Not Enter (l) MS seamless pipes SCH - 80 conforming to ANSI - B31.3.
Supply and fixing 68 Ltr. water capacity brand new seamless cylinder with CCOE Approval and filled with 45 Kg. CO2 Gas fitted with Valve assembly:Valve CO2 / Ø12mm / 25E EN-629-1 / B. Disc 250 Bar / Diff.pressure / VdS / LPCB/ UL/ FM &CCOE Approved, Master valve with VDS/LPCB/ UL/ FM approved 24 V DC Solenoid and VDS/LPCB/ UL/ FM approved Pneumatic-Manual release device with Lever complete all as specified and as directed.
Supply and fixing 68 Ltr. water capacity brand new seamless cylinder with CCOE Approval and filled with 45 Kg. CO2 Gas fitted with Valve assembly:Valve CO2 / Ø12mm / 25E EN-629-1 / B. Disc 250 Bar / Diff.pressure / VdS / LPCB/ UL/ FM &CCOE Approved, Slave valve with VDS/LPCB/ UL/ FM approved Pneumatic Actuator complete all as specified and as directed.
Supply and fixing online digital weight monitoring with Normal Indication - Analogue LED type complete all as specified and as directed.
Supply and fixing CO2 cylinder bank assembly suitable to fix 9 x 45 Kg. CO2 gas cylinders in Cabinet Type Enclosure with seamless Sch 80 manifold (header) matching flange & online monitoring fixing assembly fully intigrated pressure switch, safety valve, non return valve, SS braided discharge hose, terminal boxes, non ferrous fastners and other required accessories complete all as specified and as directed.
Supply and fixing CO2 Cylinder bank assembly suitable to fix 26 x 45 Kg. CO2 gas cylinders in Cabinet Type Enclosure with seamless Sch 80 manifold (header) matching flange & online monitoring fixing assembly fully intigrated pressure switch, safety valve, non return valve, SS braided discharge hose, terminal boxes, non ferrous fastners and other required accessories complete all as specified and as directed.
Supply and fixing CO2 Cylinder bank assembly suitable to fix 4 x 45 Kg. CO2 gas cylinders in Cabinet Type Enclosure with seamless Sch 80 manifold (header) matching flange & online monitoring fixing assembly fully intigrated pressure switch, safety valve, non return valve, SS braided discharge hose, terminal boxes, non ferrous fastners and other required accessories complete all as specified and as directed.
Suuply and fixing CO2 Cylinder bank assembly suitable to fix 34 x 45 Kg. CO2 gas cylinders in Cabinet Type Enclosure with seamless Sch 80 manifold (header) matching flange & online monitoring fixing assembly fully intigrated pressure switch, safety valve, non return valve, SS braided discharge hose, terminal boxes, non ferrous fastners and other required accessories complete all as specified and as directed. NOTE: Cabinet Type Enclosure shall be approved from OEM.
Supply and fixing Online monitor control panel complete all as specified and as directed.
Supply and fixing CO2 discharge nozzle VDS approved complete all as specified and as directed.
Supply, fixing and testing high pressure hydraulic 2-way valve, made out from steel, non electric operated including necessary connections as per site requirement and item shall be approved by TAC complete all as specified and as directed.
Supply and fixing 40 NB Manual Lock-out Valves with supervisory Limit Switch complete all as specified and as directed.
Supply and fixing Safety Sign Board - "Vacate Immediately" complete all as specified and as directed.
Supply and fixing Safety Sign Board - "Do Not Enter" complete all as specified and as directed.
Supply, installation, testing and commissioning of Graphical Monitoring Station for monitoring of parameters of CO2 flooding systems installed in various locations as specified above with provisions for monitoring parameters such as weight, pressure, alarms etc. of all cylinders for healthiness of system, to be integrated with fire alarm system including all controller, sensors, transducers, computer & software as per site requirement complete all as specified and as directed.
Supply, installation, testing and commissioning of MS seamless Sch- 80 pipes conforming to ANSI - B31.3 including required forged fitting such as elbow, bends, tees, sockets etc with one coat of primer and paints complete all as specified and as directed.
(a) 100 mm dia
(b) 80 mm dia
(c) 65 mm dia
(d) 50 mm dia
(e) 40 mm dia
(f) 32 mm dia
(g) 25mm dia
(h) 20 mm dia
Fire Detection Systems
Supply, installation, testing & commissioning of UL listed, 9/10th edition 32 bit Fire Alarm Control Panel having microprocessor based 2 loop cards expandable upto 10 loops with 252 intelligent points per loop cards in any flexible combination (detectors or devices ), panel having capacity of storing upto 5000 events, panel able to automatically switch ON /OFF respective control module whenever any alarm is triggered, panel having 6 inch long LCD touch screen and LED's for displaying system status, panel providing user with 24 programmable macro or function buttons, which can be programmed for a variety of usages like controlling AHU's, Pressurisation fans, fire pumps, monitoring of flow switches in fire pipe line etc., panel having a built in power supply of 170 Watts and battery charger capable to charge the system batteries upto 100 AH, panel having 240 V AC power supply, 24 V SMF batteries sufficient for 24 hour in standby and 30 minutes in alarm complete as per specification, panel having the capacity of connecting additional 15 panels or Network terminals using network card, panel having the capacity of connecting maximum 8 Remote terminals or 8 remote displays using RS 485 card, Bacnet/Modbus interface card for BMS integration complete all as specified and as directed. NOTES:- (i) These are minimum essential requirement any specification over and above the given specification shall be acceptable. (ii) In addition to the digital screen, the user can view a graphics map which can show a simple building floor plan.
Supply,Installation,Testing and Commissioning of UL listed and FM approved repeater panel with minimum 160 characters backlit LCD display & with event and audiable status LED's, scroll buttons to view additional events, local sounder and provided in its own enclosure complete all as specified and as directed.
Supply, Installation,Testing and Commissioning of UL listed and FM approved Intelligent Addressable Multi-criteria detector with Fire Print Technology/ OEM specific technologies having responsiveness of photoelectric, thermal, and false alarm resistance along with standard base, Multi-criteria detector to be an intelligent digital photoelectric detector with a programmable heat detector, the detector having 11 sensitivity level and with Bi-colour/ tri colour LED, Green for Normal, Amber /yellow for trouble and Red for alarm and facility to mount in different comprehensive environment like Hostile environment, Parking Garage,HVAC Ducts, Precious storage, Transformer rooms, Ware house, Dormitory and normal working environments complete all as specified and as directed.
Supply, Installation,Testing and Commissioning of multi band (more then three band) flame detector, UV Range: 190-250nm, IR : 1 - 4.8 micro meter, quiescent current < 85mA, separate LED indication for normal and alarm, Air Purging Provision, protection class IP 65/66, operating temp -15Deg.C to +55Deg.C, Confirming to NFPA 72E, FM standards class no. 3260 and IS code 2189, IP & Performance Certification by ETDC/ SIL2 Rated, Govt. of India complete all as specified and as directed.
Supply, Installation,Testing and Commissioning of UV & IR/ 1UV & 2 IR bands IP 65/66, UV Range- 185-260nm IR-1 to 4.3 micro meter, quiescent current < 85mA, separate LED indication for normal and alarm, Air Purging Provision, protection class IP 66, operating temp -15Deg.C to +55Deg.C, LPCB / CE / FM approved Confirming to NFPA 72E, FM standards class no. 3260 and IS code 2189, IP & Performance Certification by ETDC, Govt. of India complete all as specified and as directed. NOTE: These are minimum essential requirement any specification over and above the given specification shall be acceptable.
Supply, Installation,Testing and Commissioning of UL listed and FM approved Intelligent addressable one Output with one input module for Hooters / Sounders / Strobes etc. complete all as specified and as directed.
Supply, Installation,Testing and Commissioning of UL listed and FM approved Intelligent addressable monitor module for Sprinkler Flow Switch and Door Holder complete all as specified and as directed..
Supply, Installation,Testing and Commissioning of UL listed and FM approved addressable Double action Manual Pull Station, Shock and Vibration Resistant, Pull Down Lever Remains Down Until Reset and shall be Polarity Insensitive complete all as specified and as directed.
Supply, Installation,Testing and Commissioning of UL Listed Conventional Sounder with strobe having multi tone settings with range of 78 db to 87 db complete all as specified and as directed.
Supply, installation, testing and commissioning of Response Indicator complete all as specified and as directed.
Supply, Installation,Testing and Commissioning of UL listed and FM approved fault isolator complete all as specified and as directed.
Supply and laying of 2 core x 1.5 Sq mm PVC insulated copper conductor armoured cable ISI marked on surface of wall, floor, false ceiling, duct etc. in steel conduit of suitable size complete all as specified and as directed.
Supply and drawing of 4 core x 1.5 Sq mm PVC insulated copper conductor armoured cable ISI marked on surface of wall, floor, false ceiling, duct etc. in steel conduit of suitable size complete all as specified and as directed.
Supply, Installation,Testing and Commissioning 1 KVA online UPS with 30 min battery backup complete all as specified and as directed.
FIRST AID (PRIMARY) FIRE FIGHTING APPLIANCES FOR FOLLOWING AREAS :- (a) All rooms (ground, first & second floors) of buildings of TV 3 AE, TV2 AE, AI-20 D AE test Cell No.1& AI-20 D AE test Cell No. 2 including Preparatory hall & Observation and control cabins of all test beds. (b) All rooms (ground &first floors)of VR-8A Test Bed. (c) All rooms (ground & first floors) of VR-14 Test Bed. (d) All rooms (ground floors) of AI-9V Test Bed. (e) All rooms (ground floors) of Preservation & Packing Bay (P&P Bay). (f) Pump house and primary filtration shed of BPI.
Supply & fixing ISI marked (IS: 2878) portable CO2 fire extinguisher of capacity 4.5 kg flat base including valve discharge hose of not less than 10mm diameter complete in all respect including initial fill with CO2 gas confirming to IS 307 and filled to filling ratio of not more than 0.367 complete all as specified and as directed.
Supply & fixing ISI marked (IS: 10658) Dry Chemical Power type 25 Kg Trolley Mounted Extinguisher complete all as specified and as directed.
Supply & fixing ISI marked (IS: 2878) CO2 type 22.5 Kg Fire Extinguisher Trolley Mounted complete all as specified and as directed.
Supply & fixing ISI marked (IS: 15683) Dry Chemical Power type 6 Kg Extinguisher as per complete all as specified and as directed.
Supply & fixing ISI marked (IS: 15683) clean agent type 4 Kg Extinguisher complete all as specified and as directed.
Panel Protection
The following note shall be applicable for Serial Item No. 47 to Serial Item No. 50 herein below:- NOTE:Linear pneumatic heat detection tubing and suppression via Clean agent (HFC 227ea) based fire extinguishing system at all the electrical, electronic and instrumentation panels in all power rooms (ground & first floor) as well as in the observation and control rooms (ground / first floor) of all 07 test bed buildings of all 07 (seven) test beds ( TV-3 AE, TV-2 AE, AI-20 AE Cell No.1, AI-20 AE Cell No.2, AI-9V APU, VR-14 MGB & VR-8A MGB) at ETH / RTH.
Supply, Installation,Testing and Commissioning of 4 kg capacity HFC 227ea , DLP Assembly with automatic valve CE & pie approved, push in connector for tube, mounting bracket, End of Line adopter and low pressure switch for monitoring system activation complete all as specified and as directed.
Supply, Installation,Testing and Commissioning of 6 kg capacity HFC 227ea , DLP Assembly with automatic valve CE & pie approved, push in connector for tube, mounting bracket, End of Line adopter and low pressure switch for monitoring system activation complete all as specified and as directed.
Supply, Installation,Testing and Commissioning of Hooter with accessories complete all as specified and as directed.
Supply, Installation,Testing and Commissioning of UL Listed Linear Pneumatic heat Detection Tube with all necessary fittings & supports complete all as specified and as directed.
Dismantling/Taking down U/S Fire indicator from site all as specified and as directed.
Dismantling/Taking down U/S Fire detector from site all as specified and as directed.
Dismantling/Taking down U/S Fire alram panel from site all as specified and as directed.
Dismantling/Taking down U/S wire of deffernce sizes from site all as specified and as directed.
Dismantling/Taking down U/S coundut pipe of deffernce sizes from site all as specified and as directed.
Dismantling/Taking down U/S M/S pipe of deffernce sizes from site all as specified and as directed.
Material and labour for earthing complete with galvanised steel earth plate electrode 60 cm x 60 cm x 6.0 mm thick buried directly in ground vertically to a depth not less than 2.25 mtr deep below ground level with top edge of the earth plate at depth not less than 1.5 mtr below ground level earth plate surrounded by 15 cm thick and packed layers of charcoal, dust and common salt, earth lead GI wire 4 mm by means of bolts, nuts, chck-nuts and washers complete including excavation and earth work, PCC chamber in cement concrete 1:3:6 type C1 (using 20 mm graded stone aggregate) including 50 mm thick precast cement RCC cover in (1:2:4) type B1 reinforced with 8 mm dia TMT bar @ 75 c/c both ways with 2 nos lifting handles of 12 mm dia MS plain bar duly painted with two coats of synthetic enamel paint, GI pipe 20 mm dia light grade with funnel & wire mesh for watering and 40 mm light grade GI pipe for earth lead protection etc. complete all as specified and shown in electical plate No 3 of SSR part-I (for control panel) complete all as specified and as directed.
Excavation in trenches not exceeding 1.50m wide and not exceeding 1.50m depth and getting out in soft/loose soil complete all as specified and directed.
Excavation in trenches not exceeding 1.50m wide and not exceeding 1.50m depth and getting out in hard/dense soil complete all as specified and directed.
Returning, filling in including spreading, leveling, watering and well ramming in layers not exceeding 25 cm in soil complete all as specified and directed.
Removing excavated materials not exceeding 50m and depositing where directed at a level not exceeding 1.50m above the starting point complete all as specified and directed.
Supply and filling river sand to the full width of trenches for protection of cable including spreading and punning down including watering consolidation complete all as specified and as directed. Note: Thickness of sand shall be paid after cushioning and punning down.
Supply and laying reinforced precast concrete cable cover, class LV, type-2, flat of size 300mmX 180mmX 40mm complete all as specified and as directed.
Cutting the existing road for 30cm width upto 60cm depth for laying of cable and making good using PCC 1:2:4 type B1 (using 20 mm graded stone aggregate) complete all as specified and as directed.
Material and labour for GI tubing 25mm bore light grade for cable protection complete all as specified and as directed.
Supply, laying, testing and commissioning of LT UG armoured XPLE insulated inner and outer sheet/ PVC insulated, FRLS with stranded copper conductor cable 1100 volts grade IS-7098 part-I, laid in trenches/floor/duct/wall including double compression copper/stainless steel gland of fixing UG Cable in panel at both end with copper lungs of suitable sizes of 4x2.5sqmm complete all as specified and as directed. NOTE: Excavation, returning filling, removal, sand cushioning, PCC covers shall be measured and paid separately under relavant items of Schedule 'A'.
GENERAL NOTE APPLICABLE TO ALL ITEMS OF SCHEDULE 'A' : The amount against Schedule of Credit on Page No. _____ shall be deducted from the total amount quoted against Sch 'A' while deriving the Contract Sum for Acceptance.
TRIVENI CONSTRUCTIONS
M/S N.K BUILDERS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .