| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹4.0 LAccepted-AOC VILL P O AMJAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713203 | l1 | Accepted-AOC L1 | |
| 2 | L2₹4.2 L+₹20,005.72 (5.00%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹4.3 L+₹28,408.12 (7.10%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹4.0 L
EMD Value
₹5,100
Closing Date
14 Oct 2024, 11:00 amClosed
AREA ENGINEER EnM, JHANJRA AREA
OFFICE OF THE GENERAL MANAGER, JHANJRA AREA, PO-LAUDOHA, BO, DIST. - PASCHIM BARDHAMAN, PIN-713385
Installation of gear coupling, installation of top bottom rollers, striking plate of 1000mm wide 19XD belt conveyor in LHCM-2 section of R-VII seam at 3n4 Incline, J.P.Colly.
2024_ECL_318327_1
ECL/GM/JNR/EnM/A2/24-25/72 dated 24.09.2024
Open Tender
Miscellaneous Works
Item Rate
15 days
JHANJRA UNDERGROUND
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,100
18 Feb 2025
3 Oct 2024
15 Oct 2024
3 Oct 2024
14 Oct 2024
4 Oct 2024
3 Oct 2024 - 10 Oct 2024
Amount
Loading, transportation & unloading of complete gear coupling set(from surface), DA- oxygen cylinder from surface to site partly manually and partly with help of haulages, chain pulley block(from 74BL/-9D) to site (19XD/37L)partly manually and haulage, mechanical puller(manually) from surface to site (Distance--- approx. 2500mtr.)
Dismantling-pulling of out of order gear coupling complete from gear box & drive drum shaft after removing of gear box.
Fitting-hammering-grinding- filling of gear coupling complete on gear box.
fitting-alignment of gear box- drive drum-motor and trial run of the belt conveyor.
Loading, transportation & unloading of 20mtr ISMB-200, 50mtr ISMC-150, 50mtr ISA- 65X65X6, DA-oxygen cylinder from surface to 19XD/37L in R- VII seam with help of haulages.
Necessary cleaning near loop take up area of 19XD belt.
Removal of belt at loop take up, jointing & tensioning of belting of 19XD belt conveyor and trial run.
Dismantling of loop structure complete & removal of loop drums-loop trolley from belt.
Nessecary Fabrication of worn out loop take up unit of 6 mtr long and Fixed drum unit base frame by usage of (ISMB-200 & 250 joist, ISMC-150 & 125 Channel, IAS- 90*90*8 & 65*65*6 angle, Ms plate-20 mm thick) at site
Fittings of loop take-up frame and fixed drum unit at site
Nessecary Fabrication of worn out Movable trolley for loop take up unit by using (ISMB-200 joist &MS plate-20 mm thick) at site Fitting of loop trolley with 01 no drum at site
Fittings of loop trolley with 01 drum at site
Nessecary fabrication and fitting of worn out tension arrangement frame by usge of (ISMB-200 joist IAS-65*65*6 angle, Ms plate-20 mm thick) at site
Transportaing, Laying, Lapping, Jointing & Tensioning of about 12 mtr. Belting on loop take up and trial run.
Transportation of 60 nos. 1000mm Bottom rollers, 40 nos top roller, 3 nos. decking plate (1.5mX1.5m), 12mm plate (2mX2m), Oxygen and DA cylinder from surface to site at 19XD/50L
Fitting of Bottom rollers after proper alignment of foot stools
Fitting of top rollers after proper alignment of structures
Fitting of decking plates at drive head and tail end
Fitting of striking plate at discharge point after necessary fabrication
Supply of DA cylinder
Supply of Oxygen Cylinder
Total impact of GST for the purpose of CTC
K R ENTERPRISE
N.K. ENTERPRISE
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .