| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹579.2 CrAccepted-AOC | ₹579.2 Cr | 1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Does not satisfy all eligible criteria |
| Sl No | Description | Qty | Unit | Nyati Engineers And Consultants PVT Ltd L1 |
|---|---|---|---|---|
| 1.00 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 17,485.58 | Cum | 233 ₹40,74,140.61 Lowest |
| 2.00 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means | 1,942.84 | Cum | 255 ₹4,95,424.71 Lowest |
| 3.00 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum,including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means | 1,924.26 | Cum | 290 ₹5,58,035.98 Lowest |
| 4.00 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 to 3.0m.) By Mechanical Means | 15,394.1 | Cum | 319 ₹49,10,716.62 Lowest |
| 5.00 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5m To 3.0 m.) By Mechanical Means | 1,924.26 | Cum | 589 ₹11,33,390.32 Lowest |
| 6.00 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 3.0 to 4.50m.) By Mechanical Means | 8,920.05 | Cum | 380 ₹33,89,617.1 Lowest |
| 7.00 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 3.00 m To 4.50 m.) By Mechanical Means | 8,920.05 | Cum | 701 ₹62,52,951.55 Lowest |
| 8.00 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 4.50 to 6.00m.) By Mechanical Means | 3,677.1 | Cum | 411 ₹15,11,289.74 Lowest |
| 9.00 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 4.50 m To 6.00 m.) By Mechanical Means | 8,579.91 | Cum | 758 ₹65,03,571.78 Lowest |
| 10.00 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. | 19,530.78 | sqm | 120 ₹23,43,694.2 Lowest |
Tender Value
₹551.6 Cr
EMD Value
₹5.5 Cr
Closing Date
26 Dec 2025, 5:00 pmClosed
CE MSIDC Mumbai
13th Floor BAkhtawar chember Nariman point Nashik
Construction of New Surgical Building at Government Medical College and Hospital , Chhatrapati Sambhajinagar
2025_MSIDC_1259098_1
10
Open Tender
Civil Works
Item Rate
1095 days
Chh Sambhaji Nagar
Please refer Tender documents.
7 documents required · 7 mandatory
₹35,400
Yes
₹5.5 Cr
Yes
CE MSIDC Mumbai
22 Apr 2026
13 Dec 2025
29 Dec 2025
13 Dec 2025
26 Dec 2025
13 Dec 2025
17 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 0.8 | Cum | 1 | ₹0.8 |
| 2 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means | 0.8 | Cum | 1 | ₹0.8 |
| 3 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum,including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means | 0.8 | Cum | 1 | ₹0.8 |
| 4 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 to 3.0m.) By Mechanical Means | 0.4 | Cum | 1 | ₹0.4 |
| 5 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5m To 3.0 m.) By Mechanical Means | 0.8 | Cum | 1 | ₹0.8 |
| 6 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 3.0 to 4.50m.) By Mechanical Means | - | Cum | 1 | - |
| 7 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 3.00 m To 4.50 m.) By Mechanical Means | - | Cum | 1 | - |
| 8 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 4.50 to 6.00m.) By Mechanical Means | 0.6 | Cum | 1 | ₹0.6 |
| 9 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 4.50 m To 6.00 m.) By Mechanical Means | 1 | Cum | 1 | ₹1 |
| 10 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. | 1 | sqm | 1 | ₹1 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Tendernotice_1.pdf
PDF • 0.46 MB
RFP.pdf
Tender Documents • 12.10 MB
BasementPlan.pdf
Tender Documents • 0.34 MB
GroundFloorPlan.pdf
Tender Documents • 1.80 MB
SecondFloorPlan.pdf
Tender Documents • 1.69 MB
FirstFloorPlan.pdf
Tender Documents • 2.07 MB
BOQ_2170121.xls
BOQ • 1.20 MB
SitePlan.pdf
Tender Documents • 1.19 MB
8thFloorPlan.pdf
Tender Documents • 1.21 MB
10th11thFloorPlan.pdf
Tender Documents • 1.48 MB
7thFloorPlan.pdf
Tender Documents • 1.39 MB
Typical4th5th6thFloorPlan.pdf
Tender Documents • 1.41 MB
12thFloorPlan.pdf
Tender Documents • 2.08 MB
NinthFloorPlan.pdf
Tender Documents • 1.23 MB
SectionBB.pdf
Tender Documents • 0.27 MB
ElevationSectionAA.pdf
Tender Documents • 0.52 MB
ThirdFloorPlan.pdf
Tender Documents • 1.11 MB
CSD.pdf
Tender Documents • 1.03 MB
19ElectricalSLD.pdf
Tender Documents • 4.08 MB
FrontElevation.pdf
Tender Documents • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .