Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.4 LAccepted-AOC | 1 | Accepted-AOC Accept | |
| 2 | 2₹5.4 L+₹355.50 (0.07%)Rejected-AOC | 2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | INNOVATIVE SYSTEMS L1 | CREATIVE LINKS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per | 33 | cum | 246 ₹8,118 Lowest | 247 ₹8,151 |
| 2.00 | Plain Cement Concrete 1:4:8 Mix (one part cement, four part M-Sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges fo | 9 | cum | 5,103 ₹45,927 Lowest | 5,103.5 ₹45,931.5 |
| 3.00 | Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as PCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel s | 198 | Sqm | 459 ₹90,882 Lowest | 460 ₹91,080 |
| 4.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part M-Sand and Four part of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charge | 60 | Cum | 6,553 ₹3,93,180 Lowest | 6,555 ₹3,93,300 |
Tender Value
₹6.5 L
EMD Value
₹6,500
Closing Date
25 Aug 2025, 3:00 pmClosed
Executive Officer Melaseval Town Panchayat
Melaseval Town Panchayat Tirunelveli District
Construction of Retaining wall at Ward 3 Thatchankulam Arasadi madai in Melaseval Town Panchayat
2025_DTP_592681_1
97/2025
Open Tender
Civil Works
Works
180 days
Melaseval Town Panchayat Tirunelveli District
Class II
2 documents required · 2 mandatory
₹0
₹6,500
Yes
Melaseval Town Panchayat Tirunelveli District
4 Sept 2025
14 Aug 2025
25 Aug 2025
14 Aug 2025
25 Aug 2025
14 Aug 2025
21 Aug 2025
Amount
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per
Plain Cement Concrete 1:4:8 Mix (one part cement, four part M-Sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges fo
Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as PCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel s
Plain Cement Concrete 1:2:4 Mix (one part cement, two part M-Sand and Four part of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charge
CREATIVE LINKS (BID ID -1438796)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .